CMG CORP | B= | C | 08/11/2023 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 7824590 |
CMG CORP | B= | P | 06/14/2023 | pending other final inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, RIAL HEATING AND AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 7771342 |
CMG CORP | BFR | P | 04/27/2023 | pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7729074 |
EL PASO ELECTRIC, LLC. | E= | C | 06/15/2023 | Electrical ok / | ROB | ROB | | E= | C | 7773139 |
EL PASO ELECTRIC, LLC. | E= | P | 06/13/2023 | Need to breaker tie 2x 50 3 pole breakers. --- Need to lower 2x GFCI receptacles near serving window in kitchen. | AARONR | AARONR | | E= | P | 7770699 |
EL PASO ELECTRIC, LLC. | ER | P | 06/12/2023 | Rough ok for all grid ceilings / | ROB | ROB | | ER | P | 7769393 |
EL PASO ELECTRIC, LLC. | ER | P | 05/03/2023 | Hard lids ok in dining and service area / | ROB | ROB | | ER | P | 7734646 |
EL PASO ELECTRIC, LLC. | ER | P | 04/27/2023 | Wall rough OK. | AARONR | AARONR | | ER | P | 7729547 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 07/11/2023 | NOTE / TAB REPORT AND ENGINEER APPROVAL LETTER RECEIVED / SEE IMAGES / | JERRYF | JERRYF | | H= | C | 7794184 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 06/12/2023 | PARTIAL PENDING TAB REPORT / PICTURES OF COMPLETED DRAINS RECEIVED / SEE IMAGES / | JERRYF | JERRYF | | H= | P | 7768743 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 06/08/2023 | PARTIAL PENDING TAB REPORT NOTE / ALL CONTROLS / GSA / RA / EXHAUST GRILLES ARE COMPLETE / ROOF / NO REFRIGERATION ALARMS REQUIRED / | JERRYF | JERRYF | | HSP | P | 7766987 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/19/2023 | NEED THE FOLLOWING - REFRIGERATION CONTRACTOR ATTACHED - TAB REPORT - CONTROLS NOTE / ALL SA / RA / EXHAUST GRILLES / FINAL CONNECTIONS ARE COMPLETE / | JERRYF | JERRYF | | H= | P | 7749373 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/01/2023 | BEFORE FINAL NEED THE FOLLOWING - SEAL ALL JOINTS AND SEAMS ON DISH WASHER HOOD DUCT (LEAVE CEILING TILES OUT TO VERIFY) - ADD RELOCATED DISH HOOD TO PERMIT WORK SCOPE NOTE / ABOVE CEILING SA / RA / EXHAUST MAINS / RUN OUTS (((OK))) | JERRYF | JERRYF | | HD | P | 7732024 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/13/2023 | | JOSEPHD | JOSEPHD | | P= | C | 7770296 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 06/13/2023 | | JOSEPHD | JOSEPHD | | PTO | C | 7770295 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/27/2023 | Still need insulation H2o and 2 VTR penetrations / rest okay. | DANR | DANR | | PTO | P | 7728521 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 04/26/2023 | See splice. | DANR | DANR | | PB | C | 7727586 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/26/2023 | Need VTR penetrations (2), insulation H2o, nail protection, and isolation PEX to metal studs / rest okay. | DANR | DANR | | PTO | P | 7727583 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 04/07/2023 | Need plan revision for 2 new hand sinks being added per general contractor, NOTE/ Rest o.k. | CODYP | CODYP | | PB | P | 7710307 |
EL PASO ELECTRIC, LLC. | XES | P | 04/26/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: As builts. | DANIELG | DANIELG | | XES | P | 7727003 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 04/24/2023 | PAID (REC#1949907): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P1.1 and P1.2. | SHANEN | SHANEN | | XPS | T | 7725289 |