NUNN CONSTRUCTION, INC. | B= | C | 11/08/2023 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 7912146 |
NUNN CONSTRUCTION, INC. | B= | P | 10/09/2023 | Final items OK pending all other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), COLORADO ELECTRICAL SYSTEMS, LLC Electrical Final Inspection is not Completed yet, MTECH MECHANICAL TECHNOLOGIES GROUP, INC Mechanical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 7882454 |
NUNN CONSTRUCTION, INC. | BFR | P | 08/09/2023 | TSA Queing - Metal framing for soffits and column at coiling door OK pending all other required inspections
Retail - Soffit framing OK
Note - Retail will be considered Phase 1 and TSA will be Phase 2 for documentation purposes | ADAML | ADAML | | BFR | P | 7822023 |
NUNN CONSTRUCTION, INC. | BFR | P | 06/16/2023 | TSA Queuing area not part of frame inspection this will be done at end, as part of 2nd phase . Retail storage and lease space only frame with completed required inspections. Provide newest plan set for splice, need structural connections of bulkhead framing at security gates stamped or added to plan, also weld and angle iron not installed with weld letter of observation to follow. | NATHAN | NATHAN | | BFR | P | 7774923 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 10/18/2023 | FIRE ALARM INSPECTION: Fire Alarm Complete | CRAIG | CRAIG | | E= | C | 7891181 |
BIBLE ELECTRIC, INC. | ER | C | 10/05/2023 | above ceiling in TSA area ok | CRAIG | CRAIG | | ER | C | 7878642 |
BIBLE ELECTRIC, INC. | E= | C | 10/05/2023 | | CRAIG | CRAIG | | E= | C | 7878630 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | P | 09/07/2023 | FIRE ALARM INSPECTION: retail only | CRAIG | CRAIG | | E= | P | 7849157 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 09/07/2023 | FIRE ALARM INSPECTION: retail area only ok | CRAIG | CRAIG | | ER | P | 7849156 |
BIBLE ELECTRIC, INC. | E= | P | 09/07/2023 | retail area only ok | CRAIG | CRAIG | | E= | P | 7849154 |
BIBLE ELECTRIC, INC. | ER | P | 09/07/2023 | above ceiling in retail area ok | CRAIG | CRAIG | | ER | P | 7849153 |
BIBLE ELECTRIC, INC. | ER | P | 09/01/2023 | access to motor for roll down gate ok | CRAIG | CRAIG | | ER | P | 7845190 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | R | 09/01/2023 | FIRE ALARM INSPECTION: no ready | CRAIG | CRAIG | | E= | R | 7845189 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 09/01/2023 | FIRE ALARM INSPECTION: install existing fire alarm devices in sales area only | CRAIG | CRAIG | | ER | P | 7845181 |
BIBLE ELECTRIC, INC. | ER | R | 08/31/2023 | Access needs to be no smaller than 36" deep and 30" wide from front cover of 208v motor controller cover----Above ceiling south of soffit ok--- Sill need fire alarm inspection--do not close ceiling | JIMMY | JIMMY | | ER | R | 7844010 |
BIBLE ELECTRIC, INC. | ER | P | 08/28/2023 | Recep on each end of glass wall ok | JIMMY | JIMMY | | ER | P | 7839516 |
BIBLE ELECTRIC, INC. | ER | P | 08/28/2023 | Recep on each end of glass wall ok | JIMMY | JIMMY | | ER | P | 7839518 |
BIBLE ELECTRIC, INC. | ER | R | 08/24/2023 | Need proper working clearance on motor and controller for overhead gate--- MC stubs for soffit above glass wall ok | JIMMY | JIMMY | | ER | R | 7836174 |
BIBLE ELECTRIC, INC. | ER | R | 08/24/2023 | Need proper working clearance on motor and controller for overhead gate--- MC stubs for soffit above glass wall ok | JIMMY | JIMMY | | ER | R | 7836175 |
BIBLE ELECTRIC, INC. | ER | P | 08/10/2023 | 6 Lighting whips for can lights in soffit, outside TSA ok | JIMMY | JIMMY | | ER | P | 7823278 |
BIBLE ELECTRIC, INC. | ER | P | 08/08/2023 | Column left of TSA ok | JIMMY | JIMMY | | ER | P | 7820281 |
BIBLE ELECTRIC, INC. | ER | P | 06/15/2023 | Lighting whips in 2 soffit | JIMMY | JIMMY | | ER | P | 7772993 |
BIBLE ELECTRIC, INC. | ER | P | 06/12/2023 | wall s only marked on plans note this remodel is for TSA | CRAIG | CRAIG | | ER | P | 7768867 |
BIBLE ELECTRIC, INC. | E16 | P | 05/26/2023 | | CRAIG | CRAIG | | E16 | P | 7755899 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | C | 11/08/2023 | NOTE / TAB REPORT RECEIVED / SEE IMAGES / | JERRYF | JERRYF | | H= | C | 7912144 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 10/04/2023 | PARTIAL PENDING TAB REPORT - THIS INSPECTION WAS FOR BDA PAGES 53 AND 54 NOTE / SA / RA GRILLES / FINAL CONNECTIONS / CONTROLS ARE COMPLETE / | JERRYF | JERRYF | | H= | P | 7876432 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 09/07/2023 | CHANGED INSPECTION TO HEATING FINAL - THIS INSPECTION WAS FOR ROOM 242 (TSA QUEUE AREA NOTE / ALL SLOT DIFFUSERS / RETURN GRILLES / FINAL CONNECTIONS ARE COMPLETE / | JERRYF | JERRYF | | H= | P | 7849236 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/08/2023 | THIS INSPECTION WAS ABOVE CEILING SA / RA / MAINS / RUN OUTS - BDA PAGE 24 NOTE / ALL OK / | JERRYF | JERRYF | | HD | P | 7819936 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/27/2023 | MAIN REVISION OK FOR WRAP AS IT MEET CODE. CONTRACTOR HAS SPLICE IN PLAN REVIEW. PROCEED AT OWN RISK. | MATTM | MATTM | | HD | P | 7783035 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/08/2023 | NEED THE FOLLOWING - REVISED PLAN FOR RETAIL AREA TO MATCH AS INSTALLED - MEDIUM PRESSURE MAIN DUCT AFTER RELOCATION - TSA DIVESTMENT AREA - THIS INSPECTION WAS FOR RETAIL AREA ((BDA PAGE 25))) NOTE / ABOVE CEILING BOXES / SA MAINS / RUN OUTS / ((OK)) | JERRYF | JERRYF | | HD | P | 7766431 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 09/18/2023 | PAID (REC#1990250): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout and note revisions | JUSTINC | JUSTINC | | XMS | T | 7859045 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 08/21/2023 | PAID (REC#1985457): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 7831991 |
BIBLE ELECTRIC, INC. | XES | T | 08/16/2023 | PAID (REC#1981588): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | T | 7828587 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | P | 08/03/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: layout and schedule changes | JUSTINC | JUSTINC | | XMS | P | 7816362 |
NUNN CONSTRUCTION, INC. | XBS | T | 08/02/2023 | PAID (REC#1976274): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised finishes, ceilings, provided life safety plan. | SHELLEY | SHELLEY | | XBS | T | 7815281 |