COLARELLI CONSTRUCTION, INC. | B= | P | 03/21/2024 | Suite 100 Lower Level West wing Final ok -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | PAULP | PAULP | | B= | P | 8029026 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 02/13/2024 | Phone call to rep for Accessible elements in private office shower | PAULP | PAULP | | BSP | P | 7994216 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 12/08/2023 | Framing for soffits, hard lids and head of wall okay pending other rough inspections. | ERAMIREZ | ERAMIREZ | | BFR | P | 7939784 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 11/15/2023 | Framing for mechanical shaft on 1st level okay. | ERAMIREZ | ERAMIREZ | | BFR | P | 7919958 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 11/02/2023 | Suite 100 lower level Lobby common walls to suite 50 not ready. Wall to be continuous to decking due to being a rated wall. / Gyp in storage room incorrect material, U419 only allows USG gyp, currently installed american gyp. / Provide rated ceiling for duct shaft termination. / Rest of lower level framing okay pending other rough inspections. / Reviewed Accessible Elements / | ERAMIREZ | ERAMIREZ | | BFR | P | 7907096 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 11/01/2023 | No one on site to verify what area needs inspected. | ERAMIREZ | ERAMIREZ | | BFR | P | 7906173 |
COLARELLI CONSTRUCTION, INC. | B= | P | 10/19/2023 | Phase 100 suite
Observed corrections. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, ADVANTAGE HEATING AND COOLING Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING AND HEATING, INC. Plumbing Final Inspection is not Completed yet. | ERAMIREZ | ERAMIREZ | | B= | P | 7892960 |
COLARELLI CONSTRUCTION, INC. | B= | P | 09/12/2023 | THIS PROJECT IT A PHASED OCC // inspection for 1st floor only // 3 or 4 rear grab bars in bathrooms missing 12" from centerline to wall / all sinks missing knee and toe protection / rest OK pending other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, COLORADO ELECTRICAL SYSTEMS, LLC Electrical Final Inspection is not Completed yet, ADVANTAGE HEATING AND COOLING Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING AND HEATING, INC. Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7853487 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 08/17/2023 | 1st floor above ceiling OK | LONNYS | LONNYS | | BSP | P | 7829179 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 08/03/2023 | site visit to review hand and guard rail requirements | LONNYS | LONNYS | | BSP | P | 7816248 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 07/17/2023 | site visit to discuss required plan splices and accessible elements in existing kitchen if added to scope of work | LONNYS | LONNYS | | BSP | P | 7799218 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 07/05/2023 | 1ST FLOOR HARD LIDS AND SOFFITS // 1st floor light gauge steel hard lid and soffit framing OK pending other required inspections / reviewed required inspections for lower level when ready | LONNYS | LONNYS | | BFR | P | 7789544 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 05/02/2023 | Need to attach mechanical -- Interior light gauge frame OK pending other roughs -- Reviewed Accessible Elements | DAKOTAB | DAKOTAB | | BFR | P | 7733009 |
BIBLE ELECTRIC, INC. | EP | R | 04/10/2024 | discussing relocation of existing panel in working clearance on panel P2 | MIGUEL | MIGUEL | | EP | R | 8048482 |
BIBLE ELECTRIC, INC. | E= | P | 02/22/2024 | lower level suite 100 ok / final will be pending completion of reception area 050 and working clearance in front of panel P2 on main level suite 100 / | MIGUEL | MIGUEL | | E= | P | 8003087 |
BIBLE ELECTRIC, INC. | ER | C | 01/19/2024 | above ceiling ok / | MIGUEL | MIGUEL | | ER | C | 7972453 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 01/19/2024 | FIRE ALARM INSPECTION: cables, boxes and supports ok / | MIGUEL | MIGUEL | | ER | C | 7972452 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 01/19/2024 | FIRE ALARM INSPECTION: FA ok / | MIGUEL | MIGUEL | | E= | C | 7972448 |
BIBLE ELECTRIC, INC. | ER | P | 01/17/2024 | Electrical ceiling Rough ok, FA not complete ---------------do not drop tiles------------- / | MIGUEL | MIGUEL | | ER | P | 7970145 |
BIBLE ELECTRIC, INC. | ER | P | 12/13/2023 | hardlids in basement suite 100 ok / | MIGUEL | MIGUEL | | ER | P | 7944290 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 12/13/2023 | FIRE ALARM INSPECTION: basement hardlids for suite 100 ok / | MIGUEL | MIGUEL | | ER | P | 7944287 |
BIBLE ELECTRIC, INC. | ER | P | 12/12/2023 | corridor hardlid not ready / | MIGUEL | MIGUEL | | ER | P | 7942564 |
BIBLE ELECTRIC, INC. | ER | P | 12/08/2023 | hardlids for basement suite 100 restrooms ok, still need fire alarm inspection / | MIGUEL | MIGUEL | | ER | P | 7940185 |
BIBLE ELECTRIC, INC. | EP | R | 11/09/2023 | need working clearance in front of panels P2, panel L1 in working space / | MIGUEL | MIGUEL | | EP | R | 7914354 |
BIBLE ELECTRIC, INC. | E= | P | 11/09/2023 | 100A upper suite ok / see EP inspection / | MIGUEL | MIGUEL | | E= | P | 7914352 |
BIBLE ELECTRIC, INC. | E= | P | 11/08/2023 | GFCI outlet within 6' of sink in optos 145 / rest of rooms ok / main level 100 / | MIGUEL | MIGUEL | | E= | P | 7913206 |
BIBLE ELECTRIC, INC. | ER | P | 11/03/2023 | new walls at lower level ok / cut-ins ok / | MIGUEL | MIGUEL | | ER | P | 7908996 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 09/12/2023 | FIRE ALARM INSPECTION: FA ok / | MIGUEL | MIGUEL | | ER | C | 7854050 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | P | 09/12/2023 | FIRE ALARM INSPECTION: FA ok for suite 100A / still need rough for basement suite 100A / | MIGUEL | MIGUEL | | E= | P | 7854043 |
BIBLE ELECTRIC, INC. | ER | P | 08/22/2023 | above ceiling W.wing / | MIGUEL | MIGUEL | | ER | P | 7833942 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 08/17/2023 | FIRE ALARM INSPECTION: West wing above ceiling ok / | MIGUEL | MIGUEL | | ER | P | 7830176 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 08/15/2023 | FIRE ALARM INSPECTION: FA cable and boxes ok above ceiling in E. wing / | MIGUEL | MIGUEL | | ER | P | 7826744 |
BIBLE ELECTRIC, INC. | ER | P | 08/15/2023 | East wing above ceiling ok, will need working clearances for VAV disconnects in front of 108, in 113,116,117,118,124 / | MIGUEL | MIGUEL | | ER | P | 7826735 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 08/04/2023 | FIRE ALARM INSPECTION: FA boxes in hard lids ok / | MIGUEL | MIGUEL | | ER | P | 7818174 |
BIBLE ELECTRIC, INC. | ER | P | 08/03/2023 | hard lids with exception of west bathroom / | MIGUEL | MIGUEL | | ER | P | 7816174 |
BIBLE ELECTRIC, INC. | E16 | C | 06/27/2023 | discussing meeting requirements for VAV boxes / | MIGUEL | MIGUEL | | E16 | C | 7783093 |
BIBLE ELECTRIC, INC. | ER | P | 05/16/2023 | walls in 102 reception area and 109 and 112 / | MIGUEL | MIGUEL | | ER | P | 7745906 |
BIBLE ELECTRIC, INC. | ER | P | 04/27/2023 | new walls in both wings except 109 and 112, framing incomplete / | MIGUEL | MIGUEL | | ER | P | 7729135 |
ADVANTAGE HEATING AND COOLING | H= | C | 02/23/2024 | Phase 2 Complete. MECHANICAL CONTRACTOR COMPLETE. | PAULO | PAULO | | H= | C | 8003829 |
ADVANTAGE HEATING AND COOLING | HSP | P | 02/16/2024 | MOVED THIS INSPECTION NOTE TO PERMIT #O60167 (SUITE #50).
HAD ON SITE DISCUSSION WITH MECHANICAL CONTRACTOR (JOHN/ADVANTAGE HEATING & GC) ABOUT LOCATION OF RTU ON SOUTH SIDE OF BUILDING AND ELEVATION FOR INSTALLATION OF GUARDS/CLEARANCES & SERVICE CLEARANCES. | PAULO | PAULO | | HSP | P | 7998146 |
ADVANTAGE HEATING AND COOLING | HD | C | 01/31/2024 | Phase 2: (Lower Level/West Side/Suite 100)
Received Test & Balance Report (ACCEPTED/SEE IMAGES). Note / Note #22 for CO2 sensors are built in with thermostats & verified. | PAULO | PAULO | | HD | C | 7982363 |
ADVANTAGE HEATING AND COOLING | HD | P | 01/22/2024 | Phase II: (Suite 100) Lower Level (West Side) Suite #100 Final- NEED TO VERIFY INTERLOCKS FOR VAV5-5A & 5-5B PER NOTE #22 (BDA PG.#21/M101)/rest ok. Note / All Supply/Return & Transfer grills & diffusers ok / All Thermostats ok. | PAULO | PAULO | | HD | P | 7973932 |
ADVANTAGE HEATING AND COOLING | HD | P | 11/10/2023 | Splice on file (11-01-23/M101) per previous notes, no on site inspection needed. | PAULO | PAULO | | HD | P | 7915374 |
ADVANTAGE HEATING AND COOLING | HD | P | 10/27/2023 | Phase II (Lower Level/West Wing)- CONTRACTOR STATES THAT A NEW SPLICE IS IN THE WORKS FOR NEW FIRE DAMPER PLACEMENTS IN RECEPTION AREA.
Above Ceiling Duct (West Wing)- All Supply/Outside Air ducts for VAV's ok, Exhaust duct for EF-4 ok. Fire Dampers- (Lounge Room/032, Restroom/033 ok for screws at break away. | PAULO | PAULO | | HD | P | 7901739 |
ADVANTAGE HEATING AND COOLING | HD | P | 10/24/2023 | Phase II (Lower Level)- CONTRACTOR STATES THAT A NEW SPLICE IS IN THE WORKS FOR NEW FIRE DAMPER PLACEMENTS IN RECEPTION AREA.
Inspection for Fire Damper Framing (x4)- Framing Damper walls for (Lounge Room/032, Restroom/033 & Reception Area/007 x2 ok. Inspection for Above Ceiling Duct- Exhaust ducts for Restrooms #005/004/033 & Existing Kitchen/034 to existing trunk ok / Supply Air trunks & branches for VAV's #2-2B/5-5A/3-3C/B & A ok / Outside Air for VAV's #2-2B/5-5A/3-3C & B ok / Transfer Air for note #11 Call Center Room/041 x3 ok. | PAULO | PAULO | | HD | P | 7897880 |
ADVANTAGE HEATING AND COOLING | HD | P | 10/09/2023 | Phase 1- Received Test & Balance Report for 1st Floor (ACCEPTED/SEE IMAGES). Phase 1 COMPLETE. | PAULO | PAULO | | HD | P | 7881406 |
ADVANTAGE HEATING AND COOLING | H= | P | 09/05/2023 | Phase 1- FINAL PENDING PHASE 2 COMPLETION WITH TEST & BALANCE REPORT FOR BOTH PHASES. Note / All Flex/Grills/Diffusers/Transfers & Thermostats ok | PAULO | PAULO | | H= | P | 7847228 |
ADVANTAGE HEATING AND COOLING | HSP | P | 08/22/2023 | Phase 1
HAD CONVERSATION WITH JOHN/ADVANTAGE HEATING ABOUT SERVICE ACCESS FOR EXISTING FAN COIL UNITS AT THE ENTRANCE OF BUILDING, UNITS ARE NOT BEING REPLACED & EXISTING SERVICE ACCESS IS ACCEPTABLE. | PAULO | PAULO | | HSP | P | 7833741 |
ADVANTAGE HEATING AND COOLING | HD | P | 07/21/2023 | THIS INSPECTION WAS FOR THE REST OF FIRST FLOOR ABOVE CEILING. VAV 4-4E AND 4-4B WAITING ON SPLICE TO ELIMINATE 20X18 DUCT AND JUST RUNNING 10 INCH ROUND. CONTRACTOR PROCEEDING AT OWN RISK. ROOM 134 AND 132 ABOVE CEILING VAV AND VV AND DUCT WORK (((((OK))))). BATHROOMS ABOVE CEILING EQUIPMENT AND DUCT WORK ((((OK)))). NOTE OK TO INSULATE AND FIRST FLOOR ROUGH COMPLETE. | NICKE | NICKE | | HD | P | 7804737 |
ADVANTAGE HEATING AND COOLING | HD | P | 07/17/2023 | Plan Splice on file 5/31/23. 1st Floor East Wing: Above Ceiling Rough Duct Inspection-- Note / All Supply trunks & branches ok for rooms #112/114/116/118/120/122/124/126/128/129/125/127/123/121/119/117/115/113/111/110/108/107/106/ (OK TO INSULATE/NO FLEX,GRILLS OR DIFFUSERS AT THIS TIME). Exhaust duct- ok.
1st Floor North Wing-- Above Ceiling Rough Duct Inspection-- Note / All Supply trunks & branches ok for rooms #130/136/131/144/145/146/147/142/140/138/143/141/139/137/135/ OK TO INSULATE/NO FLEX,GRILLS OR DIFFUSERS AT THIS TIME). Exhaust duct- ok. | PAULO | PAULO | | HD | P | 7799563 |
ADVANTAGE HEATING AND COOLING | HD | P | 07/11/2023 | 1st Floor East Wing: Above Ceiling Rough Duct Inspection-- CONTRACTOR TO ADDRESS THE FOLLOWING-- SPOKE WITH CONTRACTOR JOHN/ADVANTAGE HEATING ABOUT PENDING MECHANICAL SPLICE (INSPECTION DONE FROM ASI 3 & 4 IS IN REVIEW FOR EXHAUST DUCTS & EQUIPMENT SCHEDULE & WILL NEED TO VERIFY WITH INSPECTION AND CONFIRM TODAY'S INSPECTION), STILL NEED EXHAUST DUCT INSPECTION.
Note / All Supply trunks & branches ok (OK TO INSULATE/NO FLEX,GRILLS OR DIFFUSERS AT THIS TIME). | PAULO | PAULO | | HD | P | 7794703 |
ADVANTAGE HEATING AND COOLING | HSP | P | 07/05/2023 | HAD DISCUSSION WITH CONTRACTOR (John, Abe/Advantage Heating) ABOUT SERVICE ACCESSES FOR EXISTING VAV4-4 E (East)/2-2C(East)/4-4E(West)/2-2C(West) ON MAIN LEVEL(BDA pg.#83/M102).
Notes from previous HSP:6/27/23 HAD DISCUSSION WITH CONTRACTOR (ABE/ADVANTAGE HEATING) ABOUT EXISTING FIRE DAMPERS (X5) ON LOWER LEVEL M101 (AT CALL CENTER ROOM #041 (X3) & CONFERENCE ROOM #45 (X2)/NOT SHOWN ON PLANS), DISCUSSED SERVICE ACCESS FOR VAV's- 2-2D/4-4E X2 & 4-4C ON FIRST FLOOR M102, CONTRACTOR STATES THAT THERE IS ANOTHER MECHANICAL SPLICE IN REVIEW FOR SUBMISSION.
ENGINEER TO ADDRESS EXISTING FIRE DAMPERS ON LOWER LEVEL AS STATED IN ABOVE NOTES M101 & ACCESS TO BURIED RETURN FIRE DAMPERS IN CEILING NEXT TO ROOM #109 ON FIRST FLOOR & ANY OTHER FIRE DAMPERS THAT ARE INACCESSIBLE. | PAULO | PAULO | | HSP | P | 7789539 |
ADVANTAGE HEATING AND COOLING | HSP | P | 06/27/2023 | HAD DISCUSSION WITH CONTRACTOR (ABE/ADVANTAGE HEATING) ABOUT EXISTING FIRE DAMPERS (X5) ON LOWER LEVEL M101 (AT CALL CENTER ROOM #041 (X3) & CONFERENCE ROOM #45 (X2)/NOT SHOWN ON PLANS), DISCUSSED SERVICE ACCESS FOR VAV's- 2-2D/4-4E X2 & 4-4C ON FIRST FLOOR M102, CONTRACTOR STATES THAT THERE IS ANOTHER MECHANICAL SPLICE IN REVIEW FOR SUBMISSION.
ENGINEER TO ADDRESS EXISTING FIRE DAMPERS ON LOWER LEVEL AS STATED IN ABOVE NOTES M101 & ACCESS TO BURIED RETURN FIRE DAMPERS IN CEILING NEXT TO ROOM #109 ON FIRST FLOOR. | PAULO | PAULO | | HSP | P | 7783651 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 03/21/2024 | 2nd Level Final OK | TRAVISR | TRAVISR | | P= | C | 8028665 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 11/06/2023 | DWV & H20 @ RR 033, RR 004 & RR 005 OK
Need To Insulate H20 Per Plans ( Can View By Final - Soft Lid ) | TRAVISR | TRAVISR | | PTO | C | 7909822 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 10/16/2023 | 1st Floor Final OK | TRAVISR | TRAVISR | | P= | P | 7888416 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 09/25/2023 | Underfloor, In Wall & Overhead DWV & H20 @ 3 - 8 M - G Grid Lines OK | TRAVISR | TRAVISR | | PTO | P | 7866993 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/29/2023 | Drinking Fountain DWV Not Piped Per Plan @ Drain Tie In Or Venting - Need Plans To Match What On Site With 2" Tie In Next To Concrete Column In Basement & AAV @ Vent
| TRAVISR | TRAVISR | | PTO | P | 7786490 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/22/2023 | DWV & H20 @ E7 - H 12 - 16 OK / North Side Insulation Complete | TRAVISR | TRAVISR | | PTO | P | 7779862 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/07/2023 | H2O & DWV o.k. between column 3-7 and line G-M on plumbing page P102/ Under floor o.k./Insulation at previous inspection area o.k./ Need to see insulation for this area/ | CODYP | CODYP | | PTO | P | 7764828 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 05/03/2023 | H20 & Vent @ RM- 112 - 129 OK Need To Insulate Per Plans
| TRAVISR | TRAVISR | | PTO | P | 7734062 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 04/26/2023 | Under Floor DWV @ Suite OK | TRAVISR | TRAVISR | | PB | P | 7727510 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 12/14/2023 | PAID (REC#2017045): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided revised listed assembly. | BPHILLIPS | BPHILLIPS | | XBS | T | 7945158 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 11/02/2023 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: new splice see plan pages | TCRIPPEN | TCRIPPEN | | XPS | P | 7906622 |
ADVANTAGE HEATING AND COOLING | XMS | T | 11/01/2023 | PAID (REC#2005450): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 7906340 |
BIBLE ELECTRIC, INC. | XES | P | 08/15/2023 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Lighting as builts | SHELBY | SHELBY | | XES | P | 7827423 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 07/24/2023 | PAID (REC#1971927): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised floor plan. | BPHILLIPS | BPHILLIPS | | XBS | T | 7805617 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 07/24/2023 | PAID (REC#1972023): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P003, P005, P100, P101 and P101.1. | SHANEN | SHANEN | | XPS | T | 7805574 |
ADVANTAGE HEATING AND COOLING | XMS | P | 07/14/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout and schedule revisions | JUSTINC | JUSTINC | | XMS | P | 7798608 |
BIBLE ELECTRIC, INC. | XES | T | 06/21/2023 | PAID (REC#1964598): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add two 91W fans | SHELBY | SHELBY | | XES | T | 7777836 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 05/26/2023 | PAID (REC#1959781): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P003, P005, P100, P101, P101.1 and P102. | SHANEN | SHANEN | | XPS | T | 7756602 |
BIBLE ELECTRIC, INC. | XES | T | 05/25/2023 | PAID (REC#1959790): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | T | 7755384 |
COLARELLI CONSTRUCTION, INC. | XMS | T | 05/15/2023 | PAID (REC#1956318): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Clouds | DALEH | DALEH | | XMS | T | 7744009 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 05/11/2023 | PAID (REC#1956318): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Reconfigured restroom spaces, other minor floorplan changes. | BPHILLIPS | BPHILLIPS | | XBS | T | 7742127 |