COLARELLI CONSTRUCTION, INC. | BFR | P | 03/25/2024 | Inspection for framing at hard lids - surgical rooms / restrooms and lobby only all ok | PAULP | PAULP | | BFR | P | 8031702 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 03/21/2024 | Observed putty pads at north west barrier wall of waiting room ok | PAULP | PAULP | | BSP | P | 8028989 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 02/09/2024 | Inspection for top of wall smoke and fire protection / observed all 5/8's Gypsum and firecaulking ok at top of walls
Note- Reviewed splice at Med gas room from U419 to U425 / will need Gypsum attachment observations and insulation inspections when ready | PAULP | PAULP | | BSP | P | 7992277 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 01/18/2024 | Lower Level Inspection for light gauge steel framing from Suite 100 / Not rated non-load bearing Framing ok
Met with rep will review inspections at Fire Partition to adjacent permit O60166 UPDATE: Jan 19 by Paul P -- Upon Further Review, / Will need Framing at Barrier wall for Med gas room 021 once lid framing is done | PAULP | PAULP | | BFR | P | 7971214 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 09/12/2023 | site visit to review progress | LONNYS | LONNYS | | BFR | P | 7853486 |
BIBLE ELECTRIC, INC. | ER | P | 03/26/2024 | reception area and restroom hardlids and operation rooms and lasik room ok / FA ok in reception and restroom hardlids / | MIGUEL | MIGUEL | | ER | P | 8033548 |
BIBLE ELECTRIC, INC. | ER | P | 03/01/2024 | walls ok / | MIGUEL | MIGUEL | | ER | P | 8011505 |
BIBLE ELECTRIC, INC. | ER | P | 07/06/2023 | will need access panels for connections of 50V and more / | MIGUEL | MIGUEL | | ER | P | 7790979 |
ADVANTAGE HEATING AND COOLING | HD | P | 04/24/2024 | Phase 2/Suite #50
Note / Supply/Return air main trunk in Soiled Work Room (024) ok (OKAY TO INSULATE) / Supply tie in for VAV-6 to main trunk ok (OKAY TO INSULATE). | PAULO | PAULO | | HD | P | 8063507 |
ADVANTAGE HEATING AND COOLING | HD | P | 04/10/2024 | Inspection for Fire Dampers: Note / Fire Damper installation ok x5 / Angles ok x5 / Labels applied. | PAULO | PAULO | | HD | P | 8048577 |
ADVANTAGE HEATING AND COOLING | HSP | P | 04/05/2024 | INSPECTION FOR DIRECTION OF CONDENSATE DRAINS FROM SUPPLY STEAM PIPE FOR HUMIDIFIERS, STILL NEED COMPLETION OF CONDENSATE DRAINS FROM SUPPLY STEAM PIPE BACK TO HUMIDIFIERS & CONDENSATE DRAINS FROM DUCT WORK BACK TO SUPPLY RECEIVING ROOM/020 FLOOR DRAIN. Note / Condensate drain from humidifier steam supply pipe (VERTICAL PIPE) ok. | PAULO | PAULO | | HSP | P | 8044367 |
ADVANTAGE HEATING AND COOLING | HD | P | 03/29/2024 | Phase 2/Suite #50
CONTRACTOR- STILL NEED FIRE DAMPER INSTALLATIONS INSPECTION, COMPLETE SUPPLY & RETURN TRUNKS FROM SOILED WORK ROOM #024 THROUGH WALL & TOO RTU-1, RESEARCH REQUIRED FOR CONDENSATE ON STEAM HUMIDIFIERS & DUCT WORK, PRESSURE TEST FOR PIPING TO STEAM HUMIDIFIERS/WILL UPDATE WHEN FINIDHED, FURTHER RESEARCH IS REQUIRED FOR CLEAN STORAGE ROOM #028 AS CONTRACTOR STATES THAT THIS ROOM IS SMOKE BARRIER PROTECTED/WILL UPDATE CONTRACTOR WHEN FINISHED.
Note / All Supply/Return & Exhaust trunks & branches ok (OKAY TO INSULATE) / | PAULO | PAULO | | HD | P | 8037401 |
ADVANTAGE HEATING AND COOLING | HD | P | 02/28/2024 | Above Ceiling Duct Rough:
Note / Supply air ducts for room OP-1 (026) & Lasik (025) ok. | PAULO | PAULO | | HD | P | 8008990 |
ADVANTAGE HEATING AND COOLING | HD | P | 02/26/2024 | ABOVE CEILING ROUGH DUCT INSPECTED SUPPLY/RETURN AND EXHAUST TO ROOMS 006, 008, 009, 019, 021, 028, 029, 024, 026, 027 / SEAL AND SUPPORT OK / OK TO INSULATE | SEANM | SEANM | | HD | P | 8006181 |
ADVANTAGE HEATING AND COOLING | HSP | P | 02/22/2024 | ORIGINAL INSPECTION DATE WAS 2/16/23.
HAD ON SITE DISCUSSION WITH MECHANICAL CONTRACTOR (JOHN/ADVANTAGE HEATING & GC) ABOUT LOCATION OF RTU ON SOUTH SIDE OF BUILDING AND ELEVATION FOR INSTALLATION OF GUARDS/CLEARANCES & SERVICE CLEARANCES. | PAULO | PAULO | | HSP | P | 8002515 |
ADVANTAGE HEATING AND COOLING | HD | P | 02/22/2024 | Lower Level (East Wing) Suite #50 Fire Damper Framing Inspection- (ORIGINAL INSPECTION WAS ON 1/22/23). Note / Framing ok for Fire Dampers (x4) located near Discharge Room (010). | PAULO | PAULO | | HD | P | 8002490 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 04/18/2024 | Underfloor DWV - Hanging Base OK | TRAVISR | TRAVISR | | PB | C | 8056656 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/05/2024 | In Wall & Over Head DWV & DCW, DHW, DHWR OK @ Lower Level
Need Letter From Engineer For AAV @ 029 Sink Instead Of VTR | TRAVISR | TRAVISR | | PTO | P | 8014753 |
LANDMARK PLUMBING AND HEATING, INC. | PE | P | 10/13/2023 | | ASHLEYL | ASHLEYL | | PE | P | 7888021 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 03/19/2024 | PAID (REC#2045268): PLAN SPLICE FEE: $50 by: DANM for Construction: Change use of one room to Storage and enclose Clean Storage with wall and door | DANM | DANM | | XBS | T | 8026172 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 03/04/2024 | PAID (REC#2039611): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Added sheet P003.1, P003.2 and P101.2. | SHANEN | SHANEN | | XPS | T | 8012586 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 02/20/2024 | PAID (REC#2036207): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P101. | SHANEN | SHANEN | | XPS | T | 8000730 |
COLARELLI CONSTRUCTION, INC. | XMS | T | 02/08/2024 | PAID (REC#2032386): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Duct work modifications | DALEH | DALEH | | XMS | T | 7990582 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 02/08/2024 | PAID (REC#2032386): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P003 and P101. | SHANEN | SHANEN | | XPS | T | 7990548 |
BIBLE ELECTRIC, INC. | XES | T | 01/09/2024 | PAID (REC#2031923): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power, lighting and schedules. | BERTHA | BERTHA | | XES | T | 7962665 |
COLARELLI CONSTRUCTION, INC. | XMS | P | 01/03/2024 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | P | 7958980 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 01/03/2024 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Revised sheet P003, P100, P101 and P101.1. | SHANEN | SHANEN | | XPS | P | 7958974 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 01/03/2024 | PAID (REC#2024449): PLAN SPLICE FEE: $50 by: DANM for Construction: Reconfiguration of much of the surgery center | DANM | DANM | | XBS | T | 7958833 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 12/14/2023 | PAID (REC#2017045): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to architectural regarding listed assemblies | DANM | DANM | | XBS | T | 7945617 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 11/17/2023 | PAID (REC#2009265): PLAN SPLICE FEE: $50 by: CGIECK for Construction: UPDATING WALL/CEILING RATING | CGIECK | CGIECK | | XBS | T | 7921936 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 06/14/2023 | PAID (REC#1986339): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P003, P005, P100, P101 and P101.1. | SHANEN | SHANEN | | XPS | T | 7771850 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 06/14/2023 | PAID (REC#1964591): PLAN SPLICE FEE: $50 by: CGIECK for Construction: Adding Foyer Bathrooms | CGIECK | CGIECK | | XBS | T | 7771733 |
BIBLE ELECTRIC, INC. | XES | T | 06/01/2023 | PAID (REC#1959788): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting, revised schedules. | BERTHA | BERTHA | | XES | T | 7760170 |