ELDER CONSTRUCTION, INC. | B= | C | 08/09/2023 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 7821082 |
ELDER CONSTRUCTION, INC. | B= | P | 08/04/2023 | state plumb and elec finals on file. Additional Inspections Required (computer generated): PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7817206 |
ELDER CONSTRUCTION, INC. | B= | P | 08/02/2023 | photo of pipe protection on file, still need letters of finals for state plumbing and electric. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7814637 |
ELDER CONSTRUCTION, INC. | B= | P | 07/31/2023 | provide pipe protection at sink in 3rd floor hallway, rest of final okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet. UPDATE: Aug 8, 2023 by Bob F -- Upon Further Review - still need state finals for plumb and elec | BOBF | BOBF | | B= | P | 7812752 |
ELDER CONSTRUCTION, INC. | BFR | P | 06/16/2023 | framing at rooms 2205, 2204 and 1116 okay | BOBF | BOBF | | BFR | P | 7774131 |
ELDER CONSTRUCTION, INC. | BFR | P | 06/07/2023 | need to attach mech to permit, pending completion of all other required inspections, interior non bearing , non rated wall framing okay / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 7765251 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 08/09/2023 | TEST AND BALANCE REPORT RECEIVED SEE IMAGES MECHANICAL FINAL----------------COMPLETE. | TREVORH | TREVORH | | H= | C | 7821081 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/02/2023 | MECHANICAL FINAL PENDING------------------------------TEST AND BALANCE REPORT, NO ONSITE INSPECTION NEEDED. | TREVORH | TREVORH | | H= | P | 7814712 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 07/19/2023 | FLEX AND REGISTERS INSTALLED PER PLAN, BY FINAL TEST AND BALANCE NO ON SITE NEEDED | TREVORH | TREVORH | | HD | C | 7802793 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | C | 07/11/2023 | HYDRONIC FINAL------------------------COMPLETE | TREVORH | TREVORH | | H= | C | 7795188 |
HARMON - BONDED PLUMBING & HEATING, INC. | HWP | C | 07/11/2023 | HWS AND HWR FOR NEW VAV-3-12 RAN PER PLAN VERIFIED UNDER LINE PRESSURE OK, OK TO INSULATE. | TREVORH | TREVORH | | HWP | C | 7795183 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/22/2023 | PLAN SHEET M4 PLAN SPLICE DATED 6-1-23 DUCT ROUGH : 1 ST AND 2 ND FLOOR ROUND LATERAL RUN OUTS INSTALLED PER PLAN OK, OK TO WRAP. PER CONVERSATION WITH CONTRACTOR 3 RD FLOOR PLAN SPLICE IS FORTHCOMING FOR THE NEW VAV LOCATION. | TREVORH | TREVORH | | HD | P | 7779643 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/20/2023 | STILL NEED CONTRACTOR INSTALLING THE HYDRONIC PIPING TO THE NEW VAV TO ATTACH TO PERMIT, CONTRACTOR TO ENSURE ALL ACCESS TO CONTROL SIDE OF EXISTING VAV AND NEW IS MAINTAINED .VAV-3-12 MEDIUM PRESSURE AND DOWN STREAM SUPPLY DUCTING RAN PER PLAN OK, OK TO WRAP. | TREVORH | TREVORH | | HD | P | 7776963 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/13/2023 | STILL NEED CONTRACTOR INSTALLING THE HYDRONIC PIPING TO THE NEW VAV TO ATTACH TO PERMIT, CONTRACTOR TO ENSURE ALL ACCESS TO CONTROL SIDE OF EXISTING VAV AND NEW IS MAINTAINED . SUPPLY DUCTING AND ROUND LATERAL RUN OUTS FROM HALL WAY 313 TO THE NORTH OF THE FLOOR OK, OK TO WRAP ////////EXCEPT FOR NEW VAV WILL NEED TO SEE VAV-312 AND DUCTING INSTALLED IN CONFERENCE ROOM 303.AT NEXT INSPECTION REQUEST.//////// WILL VERIFY WORK DONE FOR PLAN SPLICE DATED 5-31-23 WHEN READY. | TREVORH | TREVORH | | HD | P | 7770633 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/08/2023 | NEED CONTRACTOR DOING THE HYDRONIC PIPING TO THE NEW VAV TO ATTACH TO PERMIT. ALL SUPPLY PIPING CHANGES FROM HALLWAY 313 TO THE SOUTH HALF OF THE FLOOR OK, OK TO WRAP, VERIFY DUCTING FOR THE NORTH HALF AND NEW VAV-3-12 WHEN READY. | TREVORH | TREVORH | | HD | P | 7767089 |
ELDER CONSTRUCTION, INC. | XBS | T | 06/12/2023 | PAID (REC#1961326): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added minor framing on 1st & 2nd floors to work scope. | BPHILLIPS | BPHILLIPS | | XBS | T | 7768810 |
ELDER CONSTRUCTION, INC. | XMS | T | 06/01/2023 | PAID (REC#1959785): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added scope | JUSTINC | JUSTINC | | XMS | T | 7759485 |