WELLS & WEST GENERAL CONTRACTORS, INC. | B= | C | 01/17/2024 | | BRIANB | BRIANB | | B= | C | 7969469 |
WELLS & WEST GENERAL CONTRACTORS, INC. | B= | P | 09/22/2023 | Building final OK pending other finals / -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet. | ERIKK | ERIKK | | B= | P | 7865596 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BSP | P | 09/20/2023 | Welding observation on file / | ERIKK | ERIKK | | BSP | P | 7861835 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BSP | P | 09/11/2023 | Need welding observation uploaded to permit / Viewed in fill rebar ok / | ERIKK | ERIKK | | BSP | P | 7852571 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BFR | P | 06/27/2023 | Light gauge metal framing ok / Need to inspect hard lid framing when ready / Reviewed Accessible Elements / | ERIKK | ERIKK | | BFR | P | 7783327 |
NATCO ELECTRIC, INC. | E= | C | 09/20/2023 | | BRETC | BRETC | | E= | C | 7862159 |
NATCO ELECTRIC, INC. | ER | C | 09/20/2023 | Corrections made | BRETC | BRETC | | ER | C | 7862158 |
NATCO ELECTRIC, INC. | ER | P | 08/25/2023 | ceilings ok-------will need to see water bond for relocation of transformer in ceiling by final | RANDY | RANDY | | ER | P | 7838073 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 08/18/2023 | FIRE ALARM INSPECTION: Rough in complete | BRETC | BRETC | | E= | C | 7830505 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 08/18/2023 | FIRE ALARM INSPECTION: Rough in complete | BRETC | BRETC | | ER | C | 7830504 |
NATCO ELECTRIC, INC. | ER | P | 06/22/2023 | walls only marked on plans | CRAIG | CRAIG | | ER | P | 7779973 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 09/28/2023 | MECHANICAL FINAL OK / | LIDO | LIDO | | H= | C | 7870707 |
PEAK HEATING & AIR CONDITIONING, INC. | HSP | P | 09/28/2023 | IN OFFICE REVIEW OF TEST AND BALANCE REPORT / | LIDO | LIDO | | HSP | P | 7870704 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 09/13/2023 | MECHANICAL CONTRACTOR FINAL PENDING: NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7855416 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/22/2023 | NEED REVISED AND APPROVED PLANS FOR ALL NEW EQUIPMENTS BEING INSTALLED. AFTER REVISED PLANS ARE ON FILE WILL INSPECT EQUIPMENT AND MEDIUM PRESSURE SUPPLY TO THE NEW VAV'S AND FPVAV'S / NEED TF-1 INSTALLED / ALL LOW PRESSURE DUCT ROUGH, FLEX DUCT AND SUPPLY REGISTERS OK / ALL RETURN AIR LAY IN GRILLS OK / | LIDO | LIDO | | HD | P | 7833531 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/30/2023 | NOTE READY / | LIDO | LIDO | | HD | P | 7787810 |
DRUMMOND PLUMBING LLC | P= | C | 09/20/2023 | P= ok | FRANKM | FRANKM | | P= | C | 7862449 |
DRUMMOND PLUMBING LLC | P= | R | 09/19/2023 | Not ready | FRANKM | FRANKM | | P= | R | 7861347 |
DRUMMOND PLUMBING LLC | PTO | C | 06/28/2023 | -Insulate H2O -OK on L2 overhead DWV & H2O extension Note : check water heater corrections @ final / check overhead H2O insulation @ final | FRANKM | FRANKM | | PTO | C | 7785192 |
DRUMMOND PLUMBING LLC | PTO | P | 06/26/2023 | -Complete DWV & H2O extension @ L2 ceiling space / hanger support required on H2O above sink / insulate H2O / heat loops required on water heater / drain down required on water heater / solenoid valve w/ interlocked leak detector required on water heater required per engineer -OK on in wall DWV & H2O @ L3 minus corrections Note : existing VTR | FRANKM | FRANKM | | PTO | P | 7782317 |
WELLS & WEST GENERAL CONTRACTORS, INC. | XBS | T | 09/12/2023 | PAID (REC#1987869): PLAN SPLICE FEE: $50 by: CGIECK for Construction: STRUCTURAL UPDATES | CGIECK | CGIECK | | XBS | T | 7853434 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 09/07/2023 | PAID (REC#1986205): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised scope of work | JUSTINC | JUSTINC | | XMS | T | 7849992 |