HAYS CONSTRUCTION COMPANY, INC. | B= | C | 08/31/2023 | | BRIANB | BRIANB | | B= | C | 7843893 |
HAYS CONSTRUCTION COMPANY, INC. | BFR | P | 07/10/2023 | need to attach mechanical and plumbing to permit and complete other rough inspections / observed light gauge wall framing | BRIANB | BRIANB | | BFR | P | 7793755 |
COLORADO ELECTRICAL SERVICES INC | E= | C | 08/25/2023 | Change submitted and approved to delete Air Curtain, utilize 45 KVA Transformer and 150 amp Panel B / | ROB | ROB | | E= | C | 7837410 |
COLORADO ELECTRICAL SERVICES INC | E= | P | 08/23/2023 | Need to submit prints showing deleted Air Curtain, 45 KVA Transformer, and 150 amp MCB for Panel B / All else ok / | ROB | ROB | | E= | P | 7835116 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/28/2023 | FIRE ALARM INSPECTION: Ok / | ROB | ROB | | E= | C | 7811386 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 07/28/2023 | FIRE ALARM INSPECTION: Fire Alarm rough ok / | ROB | ROB | | ER | C | 7811380 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/28/2023 | FIRE ALARM INSPECTION: Fire Alarm rough ok / | ROB | ROB | | E= | C | 7811381 |
COLORADO ELECTRICAL SERVICES INC | ER | P | 07/27/2023 | Rough ok for grid ceilings in bathrooms, office,and corridor / | ROB | ROB | | ER | P | 7809701 |
COLORADO ELECTRICAL SERVICES INC | ER | P | 07/11/2023 | Wall rough ok / Discussed accessibility requirements with contractor / Discussed AFCI/GFCI/TR requirements with owner. / | ROB | ROB | | ER | P | 7795050 |
WSM MECHANICAL | H= | C | 08/30/2023 | GAS FINAL OK / | MATTM | MATTM | | H= | C | 7842770 |
MULTISERVICES LLC | H= | C | 08/24/2023 | HVAC FINAL OK | MATTM | MATTM | | H= | C | 7835957 |
MULTISERVICES LLC | H= | P | 08/24/2023 | RECEIVED EQUIPMENT SUBMITTAL, SEE IMAGES / OK TO FINAL WITH TEST AND BALANCE REPORT | MATTM | MATTM | | H= | P | 7835821 |
MULTISERVICES LLC | H= | P | 08/16/2023 | RECEIVED TEST AND BALANCE REPORT AND PICTURES OF VENT CORRECTIONS, SEE IMAGES / STILL NEED TO ADDRESS ALL OTHER NOTES FROM 8/15/23 | MATTM | MATTM | | H= | P | 7827523 |
MULTISERVICES LLC | HD | P | 08/15/2023 | CHANGED TO HD INSPECTION / NEED PLUMBING CONTRACTOR TO ATTACH TO PERMIT / ADD VENT AND COMMERCIAL DUCT TO SCOPE OF WORK / UNIT HEATER DOES NOT MATCH EQUIPMENT SCHEDULE / UNIT HEATER SINGLE WALL VENT CONNECTOR IS BACKWARDS / VENT LACKS CLEARANCE TO COMBUSTIBLES AT ROOF MATERIAL AND WIRES / NEED TEST AND BALANCE REPORT / Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | MATTM | MATTM | | HD | P | 7827168 |
MULTISERVICES LLC | HD | R | 08/11/2023 | PLUMBING CONTRACTOR TO ATTACH TO PERMIT / ADD VENT AND COMMERCIAL DUCT TO SCOPE OF WORK / SUPPLY AND RETURN INSTALLED PER PLAN SPLICE DATED 7/28/23 / ENGINEER TO ADDRESS: UNIT HEATER DOES NOT MATCH EQUIPMENT SCHEDULE / UNIT HEATER VENT MUST BE INSTALLED IN AN ENCLOSURE INSULATED TO R-8 DUE TO HEIGHT PER THE 2015 IFGC SECTION 504.3.20 / UNIT HEATER VENT MUST BE SEALED PER THE MANUFACTURES INSTALLATION INSTRUCTIONS PAGE 16 ITEM 7 / | MATTM | MATTM | | HD | R | 7823798 |
MULTISERVICES LLC | HSP | P | 08/11/2023 | IN OFFICE REVIEW OF PLANS PRIOR TO ON-SITE INSPECTION | MATTM | MATTM | | HSP | P | 7823642 |
WSM MECHANICAL | HC | C | 08/01/2023 | 30K BTU ADDED TO EXISTING LOAD (TIE-IN ON ROOF) | MATTM | MATTM | | HC | C | 7814092 |
WSM MECHANICAL | HI | C | 08/01/2023 | GAS PER PLAN / PRESSURE TEST OK / SUPPORT GAS PIPE ON ROOF BY FINAL / | MATTM | MATTM | | HI | C | 7814074 |
MULTISERVICES LLC | HD | R | 07/26/2023 | REINSPECT ALL / CHANGED TO HD INSPECTION / NEED PLUMBING AND GAS CONTRACTORS TO ATTACH TO PERMIT / ADD VENT AND COMMERCIAL DUCT TO SCOPE OF WORK / INSTALLATION DOES NOT MATCH APPROVED DUCT DESIGN FOR SUPPLY OR RETURN / UNIT HEATER DOES NOT MATCH EQUIPMENT SCHEDULE / NEED INSTALLATION INSTRUCTIONS FOR UNIT HEATER / REMOVE FSK TAPE FROM VENT / UNIT HEATER VENT CANNOT TERMINATE WITHIN 8 FEET OF PARAPIT WALL UNLESS 2 FEET ABOVE, SEE THE 2015 IFGC SECTION 503.6.4 ITEM 2. MAY NEED TO COMPLY WITH SECTION 504.3.20 IF VENT IS EXTENDED IN HEIGHT / | MATTM | MATTM | | HD | R | 7809088 |
MISSION PLUMBING & HEATING | P= | C | 08/24/2023 | | CODYP | CODYP | | P= | C | 7836707 |
MISSION PLUMBING & HEATING | P= | P | 08/16/2023 | Need plan revision to show all plumbing is existing, No new plumbing installed | CODYP | CODYP | | P= | P | 7828571 |
SPECIAL SYSTEMS DESIGN,LLC | XES | T | 08/24/2023 | PAID (REC#1981760) PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Revised plans to address inspector's comment. | DANIELG | DANIELG | | XES | T | 7836722 |
WSM MECHANICAL | XMS | T | 08/21/2023 | PAID (REC#1980510) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Approved new splice to install new fixtures only . | TCRIPPEN | TCRIPPEN | | XMS | T | 7832473 |
MULTISERVICES LLC | XMS | T | 07/28/2023 | PAID (REC#1973663) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice | TCRIPPEN | TCRIPPEN | | XMS | T | 7811098 |