SHARP GENERAL CONTRACTORS, INC | B= | C | 02/28/2024 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 8008315 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 11/17/2023 | Final items OK pending all other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), PIPE LINE SPECIALTIES INC. Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 7922739 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 09/13/2023 | 2nd Floor Area 1 - Remaining metal framing OK / Reviewed accessible elements | ADAML | ADAML | | BFR | P | 7855675 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 08/16/2023 | 2nd Floor Area 1 - All metal framing OK except Office 226 Corridor side wall, Training 230 Wall type B and Office 234 framing around entry door / Drywall OK on Secure side of Wall type S | ADAML | ADAML | | BFR | P | 7828312 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 08/01/2023 | 2nd layer drywall OK on Wall Type S on Non Secure side only - Foil and plywood observed on secure side | ADAML | ADAML | | BSP | P | 7814030 |
SHARP GENERAL CONTRACTORS, INC | BSP | P | 07/18/2023 | Base layer gyp attachment one side only ok | CHAD | CHAD | | BSP | P | 7800717 |
SHARP GENERAL CONTRACTORS, INC | BIN | P | 07/18/2023 | Observed mineral wool at Wall Type S | CHAD | CHAD | | BIN | P | 7800714 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 07/17/2023 | Partial framing only -- Wall type S framing ok -- Discussed required inspections for gyp and head of wall detail -- Pending other roughs | CHAD | CHAD | | BFR | P | 7799264 |
PIPE LINE SPECIALTIES INC. | E= | C | 02/28/2024 | Splice ok | JIMMY | JIMMY | | E= | C | 8008223 |
PIPE LINE SPECIALTIES INC. | E= | P | 11/16/2023 | Current plans have notation that power conditioner is being installed ahead of panel L2B4, need splice on plans removing that notation from panel L2B4 and instead making power conditioner notation ahead of panel H2B1 - all else ok - Splice required, please submit splice for changes in scope. If unfamiliar in submitting electronic splice, please click the following link: https://youtu.be/dG3kHpgDP0w / | CHIPO | CHIPO | | E= | P | 7920844 |
PIPE LINE SPECIALTIES INC. | ER | C | 11/16/2023 | electrical rough in ok - fire alarm work on separate permit already completed | CHIPO | CHIPO | | ER | C | 7920837 |
PIPE LINE SPECIALTIES INC. | ER | P | 10/20/2023 | Do not close up ceiling, still need fire alarm rough in - electrical rough above ceiling (marked on plans) ok | CHIPO | CHIPO | | ER | P | 7894723 |
PIPE LINE SPECIALTIES INC. | ER | P | 09/19/2023 | walls in demo room ------- training room ----- security room ok | CRAIG | CRAIG | | ER | P | 7861018 |
PIPE LINE SPECIALTIES INC. | ER | P | 08/21/2023 | phase 1 inside wall inspection ok marked on plans | CRAIG | CRAIG | | ER | P | 7832298 |
PIPE LINE SPECIALTIES INC. | H= | C | 02/28/2024 | CONDENSER LABELED SEE IMAGES | NICKE | NICKE | | H= | C | 8008314 |
PIPE LINE SPECIALTIES INC. | H= | P | 02/28/2024 | STILL NEED CONDENSER TAG CONDENSATE LINE PROTECTED (((OK)))) | NICKE | NICKE | | H= | P | 8008187 |
PIPE LINE SPECIALTIES INC. | H= | P | 12/15/2023 | NEED THE FOLLOWING - PROTECT VINYL TUBING IN RETURN AIR PLENUM - CONDENSER TAG - CONTRACTOR TO ATTACH PICTURES OF CORRECTIONS TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | H= | P | 7946104 |
PIPE LINE SPECIALTIES INC. | H= | P | 12/12/2023 | TAB REPORT RECEIVED AND ACCEPTED SEE IMAGES STILL NEED MINI SPLIT INSPECTION | NICKE | NICKE | | H= | P | 7942183 |
PIPE LINE SPECIALTIES INC. | H= | P | 11/17/2023 | CHANGED INSPECTION TO FINAL - NEED TAB REPORT AND MINI SPLIT INSPECTION WHEN READY NOTE / ALL SA / RA / GRILLES / FINAL / CONNECTIONS / WAVE GUIDES ARE COMPLETE / | JERRYF | JERRYF | | H= | P | 7922145 |
PIPE LINE SPECIALTIES INC. | H= | P | 10/18/2023 | CHANGED INSPECTION TO HEATING FINAL - NEED THE FOLLOWING - WAVE GUIDES AND INSPECTIONS - TAB REPORT - CORRECT PERMIT WORK SCOPE PER PREVIOUS NOTES NOTE / ALL SA /RA GRILLES / FINAL CONNECTIONS / CONTROLS ARE COMPLETE / | JERRYF | JERRYF | | H= | P | 7891844 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/11/2023 | NEED THE FOLLOWING - ADD ALL NEW AND RELOCATED VAV BOXES TO PERMIT WORK SCOPE - APPROVED PLAN SPLICE TO MATCH SYSTEM AS INSTALLED ((CONTRACTOR PROCEEDING AT OWN RISK))) - MAN BARS - WAVE GUIDES - VAV BOXES - MEDIUM AND LOW PRESSURE DUCT TIE INS - TRANSFER DUCTS WHEN READY NOTE / ABOVE CEILING LOW PRESSURE SA / MAINS / RUN OUTS INCLUDING HARD LIDS ((OK)) / | JERRYF | JERRYF | | HD | P | 7823938 |
PIPE LINE SPECIALTIES INC. | XES | T | 02/26/2024 | PAID (REC#2037887): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Revised one-line diagram. | DANIELG | DANIELG | | XES | T | 8006244 |