MAHLER GC GENERAL CONTRACTING COMPANY | B= | C | 12/15/2023 | All other required Final inspections are complete. (This is a computer generated result) | ERAMIREZ | ERAMIREZ | | B= | C | 7945970 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 12/14/2023 | Building final OK pending other finals /. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), Permit has an open splice that must be approved or canceled. | ERAMIREZ | ERAMIREZ | | B= | P | 7945670 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | P | 12/14/2023 | Horizontial grab bars for both restrooms exceed maximum height of 36" from gripping surface, currently 37". Vertical grab bars for both restroom incorrect locations, from back wall and floorto be 39-41". Both restrooms mirrors exceeds maximum height of 40" from bottom of reflective surface. // Rest okay pending external final. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | ERAMIREZ | ERAMIREZ | | B= | P | 7945119 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 10/04/2023 | Inspection for hard lid framing for Ceilings at Pantry / Disco Room / Restrooms
Observed light gauge steel framing all ok to 3/ A6.0
| PAULP | PAULP | | BFR | P | 7876575 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 09/07/2023 | Light gauge steel frame okay for pantry, bathrooms and disco room. / Reviewed Accessible Elements / | ERAMIREZ | ERAMIREZ | | BFR | P | 7849966 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 08/16/2023 | pending other required inspections / interior light gauge wall framing at restrooms, pantry and disco rooms OK / still need to inspect hard lids when ready / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 7827968 |
TRUSTED ELECTRIC | E= | C | 12/01/2023 | corrections made / plans approved / | MIGUEL | MIGUEL | | E= | C | 7933846 |
TRUSTED ELECTRIC | E= | R | 11/17/2023 | still waiting on plans / hand dryer whips still hanging out of wall / water cooler has been surface mounted over half of the duplex receptacle feeding it / | MIGUEL | MIGUEL | | E= | R | 7922063 |
TRUSTED ELECTRIC | E= | R | 11/14/2023 | still no hand dryers / water heater wired single phase SIM 50A undersized / still no hand dryers , or revised plans / RTUs 5 and 6 re-located requires bond bushing on seal tight and bond screw , matched existing 35A OCP / | MIGUEL | MIGUEL | | E= | R | 7918851 |
JACOBS ADVANCED TECHNOLOGIES, LLC | E= | C | 11/10/2023 | FIRE ALARM INSPECTION: FA cable and boxes ok / | MIGUEL | MIGUEL | | E= | C | 7915853 |
JACOBS ADVANCED TECHNOLOGIES, LLC | ER | C | 11/10/2023 | FIRE ALARM INSPECTION: FA cable and boxes ok / | MIGUEL | MIGUEL | | ER | C | 7915852 |
TRUSTED ELECTRIC | E= | R | 11/10/2023 | one line on plans need to match what is installed, plans show 75 KVA transformer, 45 KVA installed / panel a not shown on plans as well / install ARC shield in cabinets /verify wiring of water heater / whips for hand dryers hanging / where are restroom outlets / is receiving area on scope, no lights, incomplete work / need roof inspection / no power to water cooler outlets / re-inspect / | MIGUEL | MIGUEL | | E= | R | 7915851 |
JACOBS ADVANCED TECHNOLOGIES, LLC | ER | R | 10/06/2023 | FIRE ALARM INSPECTION: not ready, wiring incomplete / | MIGUEL | MIGUEL | | ER | R | 7880166 |
TRUSTED ELECTRIC | ER | P | 10/04/2023 | Pantry hardlid okay / | MIGUEL | MIGUEL | | ER | P | 7876163 |
TRUSTED ELECTRIC | ER | P | 10/03/2023 | hardlids for restrooms and disco room / | MIGUEL | MIGUEL | | ER | P | 7875129 |
TRUSTED ELECTRIC | ER | P | 09/06/2023 | bathroom walls / | MIGUEL | MIGUEL | | ER | P | 7847766 |
TRUSTED ELECTRIC | ER | P | 09/06/2023 | bathroom walls / | MIGUEL | MIGUEL | | ER | P | 7847767 |
TRUSTED ELECTRIC | ER | P | 08/28/2023 | walls in disco room and pantry ok / | MIGUEL | MIGUEL | | ER | P | 7839465 |
TRUSTED ELECTRIC | ESL | C | 08/16/2023 | x2 locations / 4-1" and 2-3/4" total ok / | MIGUEL | MIGUEL | | ESL | C | 7828064 |
TRUSTED ELECTRIC | ER | P | 08/16/2023 | exterior walls ok / | MIGUEL | MIGUEL | | ER | P | 7828061 |
ADVANTAGE HEATING AND COOLING | H= | C | 11/14/2023 | Roof Top Inspection- All ok. MECHANICAL CONTRACTOR COMPLETE. | PAULO | PAULO | | H= | C | 7918339 |
ADVANTAGE HEATING AND COOLING | H= | P | 11/14/2023 | Received Test & Balance Report- (ACCEPTED/SEE IMAGES), Plan Splice (10-26-23/M1.0) on file per previous notes. FINAL PENDING- INSTALLATION OF THERMOSTATS, VERIFICATION OF ALL VENT LESS DRYERS PER GENERAL NOTE H, ROOF TOP INSPECTION TO VERIFY NOTE B & REMARK 5/6 & 7 ON RTU'S. | PAULO | PAULO | | H= | P | 7917594 |
ADVANTAGE HEATING AND COOLING | HD | C | 10/10/2023 | FINAL PENDING- ENGINEER TO ADDRESS THE RELOCATING OF ALL THERMOSTATS FROM EXTERIOR BATHROOM WALL TO RIGHT SIDE OF EXTERIOR PANTRY WALL, INSTALLATION OF THERMOSTATS, VERIFICATION OF ALL VENT LESS DRYERS PER GENERAL NOTE H, ROOF TOP INSPECTION TO VERIFY NOTE B & REMARK 5/6 & 7 ON RTU'S, TEST & BALANCE REPORT. Note / All supply trunks/branches & flex ducts for RTU's 1/3&4 ok / Exhaust ducts & fans ok for EF-1&2. | PAULO | PAULO | | HD | C | 7883249 |
SM PLUMBING & MECHANICAL, LLC | P= | C | 12/01/2023 | | TRAVISR | TRAVISR | | P= | C | 7933374 |
SM PLUMBING & MECHANICAL, LLC | P= | P | 11/30/2023 | No hot water at lavs, NOTE/ Rest ok | CODYP | CODYP | | P= | P | 7931653 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 09/15/2023 | In Wall DWV & H20 @ Bathroom & Break Room OK
DWV & H20 Not Piped Per Plan - Need Plans To Reflect What On Site | TRAVISR | TRAVISR | | PTO | P | 7858484 |
SM PLUMBING & MECHANICAL, LLC | PTO | R | 09/12/2023 | WAIVE TRIP FEE
NEED PLANS TO REFLECT PRO-PRESS IS OK INSTEAD OF SOLDER LIKE PLANS CALL FOR
Washer Box DWV, Low Test @ 4PSI / Washer Box H20 @ 58PSI / Bathroom DWV & H20 Not Tested Properly H20 @ 70 PSI & DWV @ 10PSI / Mop Sink DWV 10PSI & H20 @ 65PSI ( Need To Test To Code )
Need Accessible Hammer Arrestor @ All Auto Flush Urinal & Toilet's Need To Insulate Per Plan With Appropriate Insulation That Plans Call For
Contractor To Verify Work Before Calling For Inspection
RE INSPECT ALL | TRAVISR | TRAVISR | | PTO | R | 7853891 |
SM PLUMBING & MECHANICAL, LLC | PTO | P | 09/08/2023 | WAIVE TRIP FEE / NOT READY
Note: 2" Domestic Cold @ Gang Bathroom @ In Wall OK | TRAVISR | TRAVISR | | PTO | P | 7850541 |
SM PLUMBING & MECHANICAL, LLC | PB | P | 07/21/2023 | Under Ground DWV OK / Tie In @ Bathroom On Opposite Side Of Plans @ Bathroom's | TRAVISR | TRAVISR | | PB | P | 7805017 |
MAHLER GC GENERAL CONTRACTING COMPANY | XBS | T | 12/14/2023 | PAID (REC#2016868) PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Add new door at reception. | JUSTINL | JUSTINL | | XBS | T | 7945695 |
TRUSTED ELECTRIC | XES | T | 11/27/2023 | PAID (REC#2011602): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised one line//// reoganized panel schedule pages | SHELBY | SHELBY | | XES | T | 7927479 |
SM PLUMBING & MECHANICAL, LLC | XPS | T | 11/02/2023 | PAID (REC#2006247): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: new splice see plan pages | TCRIPPEN | TCRIPPEN | | XPS | T | 7907660 |
ADVANTAGE HEATING AND COOLING | XMS | T | 10/27/2023 | PAID (REC#2006247): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised T-Stat locations | JUSTINC | JUSTINC | | XMS | T | 7901658 |