HOMEOWNER | B= | C | 04/28/2025 | | TRENTP | TRENTP | | B= | C | 8418144 |
HOMEOWNER | BIN | C | 09/26/2024 | Will need ti check blow in insulation in attic at final Observed insulation in exterior walls Observed batt insulation at front elevation in trusses | SHAWND | SHAWND | | BIN | C | 8224682 |
HOMEOWNER | BFR | C | 05/14/2024 | Items corrected | TRENTP | TRENTP | | BFR | C | 8083361 |
HOMEOWNER | BSP | P | 03/26/2024 | Engineer letter on file for hanger connection for rear porch cover beam | TRENTP | TRENTP | | BSP | P | 8032722 |
HOMEOWNER | BFR | P | 03/19/2024 | 1. Need to complete fireblocking throughout scope of work, fireblocking requirements discussed onsite / 2. Missing diagonal web lateral bracing on all A1 trusses / 3. Missing H2.5s at garage/dwelling bearing wall / 4. Need to dry in all door openings / 5. Need clarification for use of hanger at house bearing point for rear porch cover beam not noted on plans | TRENTP | TRENTP | | BFR | P | 8026446 |
HOMEOWNER | BFD | C | 10/20/2023 | Drain around usable to sump, dampproofing okay / Drain ok / Contractor to backfill per requirements of Soils Report / | TRENTP | TRENTP | | BFD | C | 7894599 |
HOMEOWNER | BFD | R | 10/19/2023 | Unable to confirm felt used over drain is Mirfi 140 or equivalent per drain design on file / Will need full re inspection once correction is made or provide clarification by licensed design professional | TRENTP | TRENTP | | BFD | R | 7893119 |
HOMEOWNER | BFI | C | 09/25/2023 | R10 installed | TRENTP | TRENTP | | BFI | C | 7866684 |
HOMEOWNER | BFN | C | 09/20/2023 | Remaining forms and re enforcement okay | TRENTP | TRENTP | | BFN | C | 7862749 |
HOMEOWNER | BFT | C | 09/20/2023 | Open hole on file, 4000 psf - no drain - 10% | TRENTP | TRENTP | | BFT | C | 7861685 |
HOMEOWNER | BFN | R | 09/19/2023 | Not ready at time of inspection | TRENTP | TRENTP | | BFN | R | 7860675 |
HOMEOWNER | BFN | P | 09/07/2023 | Still need open ex / Soils report on file in plans / Foundation design in plans 4000 psf / L shaped foundation and straight connections to house OK per plans / Retaining wall OK per plans | ANGELW | ANGELW | | BFN | P | 7849326 |
HOMEOWNER | BFT | P | 08/22/2023 | Need to provide open hole to confirm foundation design soil bearing capacity / Footing forms and re enforcement okay per foundation design in plans / Northwest foundation wall form and re enforcement okay per design / Soils report in plans | TRENTP | TRENTP | | BFT | P | 7834142 |
L&M HOLDINGS, INC | E= | C | 01/21/2025 | E= OK ----- | GREGM | GREGM | | E= | C | 8328247 |
L&M HOLDINGS, INC | ER | C | 03/18/2024 | ER OK ------ | GREGM | GREGM | | ER | C | 8024379 |
HOMEOWNER | H= | C | 03/01/2024 | Mechanical final ok. | SAMS | SAMS | | H= | C | 8011857 |
HOMEOWNER | HRR | C | 03/01/2024 | 60 lb test ok on the new lines and manifold from the new addition to existing boiler / Added a bath exhaust fan and duct to n ew bathroom / Per conversation with homeowner no further heating elements are being added / | SAMS | SAMS | | HRR | C | 8011856 |
HOMEOWNER | HWP | C | 10/16/2023 | 60 lb test ok on front of garage / OK TO POUR / R- 10 installed / This will be tied back into the main house boiler system with a new manifold. New lines must be pressure tested to ensure no leaks from the existing manifold to the new manifold / | SAMS | SAMS | | HWP | C | 7889179 |
HOMEOWNER | HWP | P | 10/09/2023 | Partialed pending installation to the front of the garage / 60 lb test ok on back of the garage installation, R-10 installed / | SAMS | SAMS | | HWP | P | 7882128 |
HOMEOWNER | HWP | P | 10/02/2023 | SS Partialed 10/9/23 // Need on site inspection for garage piping //
60 lb test ok / R-10 installed / OK TO POUR / It appears a new boiler will be installed, who will be installing that boiler and its' venting? / | SAMS | SAMS | | HWP | P | 7874060 |
HOMEOWNER | HWP | P | 09/28/2023 | Not ready / Install insulation under piping (minimum R-5) / | CASEYM | CASEYM | | HWP | P | 7871392 |
HOMEOWNER | P= | C | 04/25/2025 | | ZACHH | ZACHH | | P= | C | 8416627 |
HOMEOWNER | PTO | C | 03/06/2024 | Correction complete via image | FRANKM | FRANKM | | PTO | C | 8015238 |
HOMEOWNER | PTO | P | 03/05/2024 | Need closet flange anchored/ Photo upload requested/ rest ok Note: 1 VTR | PATRICKS | PATRICKS | | PTO | P | 8015127 |
HOMEOWNER | PB | C | 09/26/2023 | FOR ONE BATH GROUP -- NO UNDER-SLAB H20 -- 2- WAY EXTERIOR C/O BY FINAL | LEE | LEE | | PB | C | 7868044 |
HOMEOWNER | PB | P | 09/25/2023 | LEAK ON CLOSET 90 -- TUB IS S-TRAPPED WITH 2" COMBO | LEE | LEE | | PB | P | 7866803 |