GOLD RUSH CONSTR & BLDG CO | B= | C | 04/12/2024 | Unfinished basement / rear deck / A/C installed | GREGT | GREGT | | B= | C | 8051040 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 03/26/2024 | Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / | GREGT | GREGT | | BSP | P | 8032720 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 02/26/2024 | Insulation installation certificate on file | GREGT | GREGT | | BSP | P | 8005527 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 02/26/2024 | FX Lumberguard installation certificate on file / FX Lumberguard AM&M approval on file | GREGT | GREGT | | BSP | P | 8005471 |
GOLD RUSH CONSTR & BLDG CO | BIN | C | 01/18/2024 | Check attics at final | GREGT | GREGT | | BIN | C | 7971035 |
GOLD RUSH CONSTR & BLDG CO | BFR | C | 01/18/2024 | Items corrected | GREGT | GREGT | | BFR | C | 7971032 |
GOLD RUSH CONSTR & BLDG CO | BFR | P | 01/12/2024 | 1. strap top plates above window header upper middle east bedroom 2. ledger 6L at front of main level missing ledgerloks @ 16" OC 3. Complete Foam and Fireblock - top of greatroom fireplace - wall between master bedroom and master bath 4. need to make repair at basement steel post under beam splice per engineer letter 5.FX Lumberguard not accepted for floor joist fireproofing on projects permitted after 06/30/2023 Rest of frame okay / unfinished basement / rear deck | GREGT | GREGT | | BFR | P | 7967093 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 01/12/2024 | Changed from BFR to BSP / Engineer letter for various changes on file | GREGT | GREGT | | BSP | P | 7966818 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 12/18/2023 | Photos of ledger attachment and post fasteners on file | GREGT | GREGT | | BSP | P | 7947045 |
GOLD RUSH CONSTR & BLDG CO | BLA | C | 12/05/2023 | | GREGT | GREGT | | BLA | C | 7935646 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 11/27/2023 | Garage portal okay | GREGT | GREGT | | BSP | P | 7927417 |
GOLD RUSH CONSTR & BLDG CO | BSP | R | 11/22/2023 | Grid nailing at header not 3" OC box grid / Portal header strapping okay | GREGT | GREGT | | BSP | R | 7926112 |
GOLD RUSH CONSTR & BLDG CO | BSP | R | 11/09/2023 | Front porch and rear deck lid and post requested / Missing screws from post to beam connection per detail 8P / Missing ledger attachment per detail 6L / Observed rest per approved design / OK to submit photo verification of corrected items | DOUGC | DOUGC | | BSP | R | 7914536 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 08/31/2023 | Photos of foundation anchor bolts on file | CHAD | CHAD | | BSP | P | 7843263 |
GOLD RUSH CONSTR & BLDG CO | BFD | C | 08/30/2023 | | GREGT | GREGT | | BFD | C | 7841793 |
GOLD RUSH CONSTR & BLDG CO | BFT | C | 08/30/2023 | Engineer letter for footing on file / | GREGT | GREGT | | BFT | C | 7841788 |
GOLD RUSH CONSTR & BLDG CO | BFN | C | 08/30/2023 | Engineer letter for foundation on file -- Eufer noted / | GREGT | GREGT | | BFN | C | 7841777 |
GOLD RUSH CONSTR & BLDG CO | BFI | C | 08/29/2023 | R-10 installed | ANGELW | ANGELW | | BFI | C | 7841405 |
GOLD RUSH CONSTR & BLDG CO | BFD | R | 08/29/2023 | Complete foundation inspections / Foundation drain is usable to daylight / Foundation drain and damp proofing OK | ANGELW | ANGELW | | BFD | R | 7841399 |
GOLD RUSH CONSTR & BLDG CO | BFN | P | 08/29/2023 | Need to complete footing and foundation observations / Soils report on file / open hole on file -- 1000 PSF -- usable -- 10% / foundation design on file (bearing capacity verified) / | GREGT | GREGT | | BFN | P | 7840526 |
GOLD RUSH CONSTR & BLDG CO | BFT | P | 08/16/2023 | AUTHORIZED INSPECTION BY ENGINEER | JACKIEP | JACKIEP | JACKIEP | BFT | P | 7827931 |
GOLD RUSH CONSTR & BLDG CO | BFN | P | 08/16/2023 | AUTHORIZED INSPECTION BY ENGINEER | JACKIEP | JACKIEP | JACKIEP | BFN | P | 7827930 |
SOUTHERN COLORADO ELECTRIC INC. | E= | C | 04/08/2024 | 20-amp A/C ok / 30-amp A/C ok / | TOMC | TOMC | | E= | C | 8045491 |
SOUTHERN COLORADO ELECTRIC INC. | ES | C | 01/03/2024 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 7958960 |
SOUTHERN COLORADO ELECTRIC INC. | ER | C | 01/03/2024 | 1 - 4/0 SER , 3 - # 6 AL , 1 - # 6 CU , ufer is not irreversible , no mcc , no central vac , unfinished basement ----- NOTE ---- check distance of plug by tub in master , missed recess can in upper South East bedroom , | TOMC | TOMC | | ER | C | 7958959 |
SOUTHERN COLORADO ELECTRIC INC. | EUG | C | 10/25/2023 | 4/0 urd | TOMC | TOMC | | EUG | C | 7899213 |
ATLANTIC HEATING & A/C INC | H= | C | 04/11/2024 | duct leakage received, see images. corrections made, see images | JONH | JONH | | H= | C | 8049272 |
ATLANTIC HEATING & A/C INC | H= | P | 04/09/2024 | duct leakage not accepted. document to show conditioned floor area served, and reference the code section in the iecc showing target value. | JONH | JONH | | H= | P | 8046492 |
ATLANTIC HEATING & A/C INC | H= | P | 04/05/2024 | WHERE IS THE GAS SHUT OFF FOR THE FIREPLACE?PROVIDE NEW IEEC VENTILATION SHEET TO PLAN REVIEW SHOWING EXHAUST AS THE MEANS USED FOR THE WHOLE HOUSE VENTILATION/ AS PER CONVERSATION WITH CONTRACTOR A NEW FAN WILL BE INSTALLED TO ACHIEVE 120 CFM MINIMUM/ LABEL WHOLE HOUSE VENTILATION SWITCH. WHOLE HOUSE VENTILATION BEING ACHIEVED WITH EXHAUST FAN LOCATED IN LAUNDRY ROOM / WHOLE HOUSE VENTILATION SWITCH LOCATED IN LAUNDRY ROOM / NOTE / UNFINISHED BASEMENT / DIRECT VENT FURNACE(X2) / A/C COMPLETE(X2) / DIRECT VENT WATER HEATER / | JONH | JONH | | H= | P | 8044516 |
ATLANTIC HEATING & A/C INC | H= | P | 04/05/2024 | PERFORMANCE TEST ACCEPTED, SEE IMAGES, DUCT LEAKAGE NOT ACCEPTED, MISSING FLOOR AREA SERVED AND PERCENTAGE/ MECHANICAL READINGS PROVIDED SHOW WHOLE HOUSE AS EXHAUST AND ONLY READING 80 CFM WHEN PLANS CALL FOR 120 CFM OUTSIDE AIR/ WILL SET INSPECTION FOR TODAY TO VERIFY TRAIN COIL HAS BEEN INSTALLED AS WELL AS ANY OTHER CORRECTIONS NEEDED FOR H= INSPECTION/ | JONH | JONH | | H= | P | 8043667 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | HC | C | 01/11/2024 | RELEASE METER | JOEL | JOEL | | HC | C | 7965350 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | HC | C | 01/10/2024 | RELEASE METER | ADRIANM | ADRIANM | | HC | C | 7966592 |
ATLANTIC HEATING & A/C INC | HRR | C | 01/05/2024 | meter release bu plumbing inspector// Contractor has elected performance test, provide by final / Provide duct leakage test for upper level system by final / By final provide equipment change letter for both coils and lower level furnace (Trane coils spec'd, ADP installed - 60K furnace spec'd, 100K installed) / No water heater or vent installed at time of inspection / / Whole house ventilation being achieved with exhaust fan located in laundry room. / Verify whole house ventilation switch location at final / NOTE / Unfinished basement / No outside air to furnace return / Direct vent furnace x 2 / A/C rough, coil and lineset. x 2 / | JONH | JONH | | HRR | C | 7961472 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | HI | C | 01/05/2024 | 10 LB TEST OK / 1 1/4 INCH MAIN / 2 FURNACE / 1 FIREPLACE / 1 WATER HEATER / 1 RANGE / | JONH | JONH | | HI | C | 7961439 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | HI | P | 01/04/2024 | LOW TEST / RE-INSPECT ALL | JONH | JONH | | HI | P | 7960203 |
ATLANTIC HEATING & A/C INC | HRR | P | 12/29/2023 | Contractor has elected performance test, provide by final / Provide duct leakage test for upper level system by final / By final provide equipment change letter for both coils and lower level furnace (Trane coils spec'd, ADP installed - 60K furnace spec'd, 100K installed) / No water heater or vent installed at time of inspection / Secure loose insulation on return trunk in attic / Ok to send pictures with next inspection request / Whole house ventilation being achieved with exhaust fan located in laundry room. / Verify whole house ventilation switch location at final / NOTE / Unfinished basement / No outside air to furnace return / Direct vent furnace x 2 / A/C rough, coil and lineset. x 2 / | CASEYM | CASEYM | | HRR | P | 7956459 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 11/17/2023 | MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / NON-COMBUSTIBLE MATERIALS INSTALLED / | JONH | JONH | | HV | C | 7922810 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | P= | C | 03/29/2024 | | LEE | LEE | | P= | C | 8037199 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | P= | P | 03/29/2024 | ENTRY FOR POTABLE WATER CERT ( SEE IMAGES ) | LEE | LEE | | P= | P | 8036860 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | P= | P | 03/22/2024 | NEED POTABLE H20 CERT -- KITCHEN LACKS HIGH-LOOP, HAMMER ARRESTOR FOR DISHWASHER SUPPLY AND IS LEAKING -- BASEMENT FLOOR DRAIN NOT VENTED WITH UNFINISHED BSMT -- NOTICED W/H EXHAUST VENT SUPPORT STRAPPING IS 6 TO 7' APART, PLEASE ADD SUPPORT WHERE CODE REQUIRES -- NOTES FOR RBD -- UFB -- NO IRRIGATION | LEE | LEE | | P= | P | 8030231 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | C | 01/11/2024 | | JOEL | JOEL | | PTO | C | 7965349 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | C | 01/10/2024 | OK | ADRIANM | ADRIANM | | PTO | C | 7966591 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PAV | C | 01/10/2024 | OK | ADRIANM | ADRIANM | | PAV | C | 7965073 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | P | 01/09/2024 | Complete PAV inspection / Rest OK / Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | ADRIANM | ADRIANM | | PTO | P | 7963620 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PAV | P | 01/09/2024 | VENT AND VENT TEST OK / RECONNECT VENT TO WATER HEATER / REST OK /// NOTE: POWER VENT TERMINATES THROUGH EAST WALL | ADRIANM | ADRIANM | | PAV | P | 7963606 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PAV | R | 01/05/2024 | The only joint permitted to not be tested is the connection to the water heater / Re test and reinspect | ADRIANM | ADRIANM | | PAV | R | 7961730 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PTO | P | 01/05/2024 | Complete PAV inspection / Air barrier at master rain head needs to be enclosed on all sides / Master toilet isn't vented to code / Rest OK /// NOTE: 3 VTR / AAV BUTLER'S SINK, POWDER LAV / CWV LEFT MASTER LAV / TEMPERING AT LEFT MASTER LAV / NO IRRIGATION | ADRIANM | ADRIANM | | PTO | P | 7961605 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PSP | P | 01/05/2024 | Water Heater Plastic Vent by Plumbing Contractor | SYSTEM | SYSTEM | | PSP | P | 7960513 |
HOMEOWNER | PWO | C | 09/29/2023 | NOTE:H2O RAN FROM WELL TO THROUGH BASEMENT FOUNDATION / WATER TEST BY FINAL | ADRIANM | ADRIANM | | PWO | C | 7873147 |
ALTITUDE PLUMBING AND RADIANT HEAT, LLC | PB | C | 09/06/2023 | no water in at this time / will need two way co on sewer / will need accessible co on 3" risers | TREBORB | TREBORB | | PB | C | 7847757 |
GOLD RUSH CONSTR & BLDG CO | XMS | T | 04/09/2024 | PAID (REC#2052090): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice for whole house ventilation | TCRIPPEN | TCRIPPEN | | XMS | T | 8047656 |
GOLD RUSH CONSTR & BLDG CO | XMS | T | 04/08/2024 | PAID (REC#2050886): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Approved new splice removed outside air, | TCRIPPEN | TCRIPPEN | | XMS | T | 8045495 |
GOLD RUSH CONSTR & BLDG CO | XMS | T | 03/06/2024 | PAID (REC#2040872): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice | TCRIPPEN | TCRIPPEN | | XMS | T | 8015975 |