FIFTH GENERATION ENTERPRISES, LLC | B= | C | 11/15/2023 | All other required Final inspections are complete. (This is a computer generated result) | SHAUN | SHAUN | | B= | C | 7918972 |
FIFTH GENERATION ENTERPRISES, LLC | B= | P | 11/13/2023 | Building final OK pending other finals /. Additional Inspections Required (computer generated): TOWNSEND MECHANICAL, LLC Mechanical Final Inspection is not Completed yet, VALUE PLUMBING AND WATER TREATMENT COMPA Plumbing Final Inspection is not Completed yet. | SHAUN | SHAUN | | B= | P | 7916982 |
FIFTH GENERATION ENTERPRISES, LLC | BSP | P | 11/10/2023 | steel stud framed pony wall ok | SHAUN | SHAUN | | BSP | P | 7915569 |
FIFTH GENERATION ENTERPRISES, LLC | B= | R | 11/08/2023 | Framing for pony wall covered prior to inspection however photos shown on site confirm a 2x4 wall was built and this is a Type 2B building which doesn't allow combustible construction for walls per IBC 603.1 / The plans also indicate a 2 1/2 metal stud wall. Additional Inspections Required (computer generated): TOWNSEND MECHANICAL, LLC Mechanical Final Inspection is not Completed yet, VALUE PLUMBING AND WATER TREATMENT COMPA Plumbing Final Inspection is not Completed yet. | ADAML | ADAML | | B= | R | 7912494 |
WRIGHT ELECTRIC, LLC | E= | C | 11/07/2023 | | BRETC | BRETC | | E= | C | 7911357 |
WRIGHT ELECTRIC, LLC | E= | P | 11/06/2023 | Need all of water heater room completed / 50 amp A1 panel - Ok / Rest - Ok | BRETC | BRETC | | E= | P | 7910303 |
WRIGHT ELECTRIC, LLC | E= | R | 10/19/2023 | Not ready for final. | AARONR | AARONR | | E= | R | 7893734 |
WRIGHT ELECTRIC, LLC | E= | R | 10/16/2023 | Building locked @ 1:20. | AARONR | AARONR | | E= | R | 7888957 |
WRIGHT ELECTRIC, LLC | ER | P | 10/04/2023 | Wall rough OK. | AARONR | AARONR | | ER | P | 7876384 |
TOWNSEND MECHANICAL, LLC | H= | C | 11/14/2023 | TEST AND BALANCE REPORT RECEIVED. SEE IMAGES / MECHANICAL CONTRACTOR FINAL OK / | LIDO | LIDO | | H= | C | 7917628 |
TOWNSEND MECHANICAL, LLC | H= | P | 11/07/2023 | FINAL PENDING: MISSING MANUAL VOLUME DAMPERS FOR MANICURE TABLE EXHAUST / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7911546 |
TOWNSEND MECHANICAL, LLC | H= | P | 11/06/2023 | EF-3 INTERLOCK WITH (E) RTU-1 OK / FINAL PENDING: MISSING MAKE UP ARE FOR LAUNDRY ROOM / EXHAUST DUCT CONNECTIONS TO MANICURE TABLES ARE MISSING MANUAL VOLUME DAMPERS / MISSING GAS SHUT OFF VALVE FOR WATER HEATER / NEED TEST AND BALANCE REPORT /
| LIDO | LIDO | | H= | P | 7910231 |
TOWNSEND MECHANICAL, LLC | HD | P | 10/25/2023 | NEED DUCT ROUGH UNDER TABLES INSPECTED AFTER INSTALLED / NEED DRYER EXHAUST DUCT ROUGH /REST OF ABOVE CEILING AND CONCEALED EXHAUST DUCT ROUGH OK (need final connections to tables and chairs)/ | LIDO | LIDO | | HD | P | 7899474 |
TOWNSEND MECHANICAL, LLC | HSP | P | 10/25/2023 | WENT OVER PLANS AND INSPECTIONS WITH MECHANICAL CONTRACTOR / | LIDO | LIDO | | HSP | P | 7899462 |
TOWNSEND MECHANICAL, LLC | HI | C | 10/04/2023 | 10 lb test ok/ gas installed as per plan/ | JONH | JONH | | HI | C | 7876660 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | P= | C | 11/15/2023 | See splice. | DANR | DANR | | P= | C | 7918971 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PAV | C | 11/07/2023 | Test via images | FRANKM | FRANKM | | PAV | C | 7911733 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PTO | C | 11/07/2023 | | FRANKM | FRANKM | | PTO | C | 7911698 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PB | C | 11/07/2023 | | FRANKM | FRANKM | | PB | C | 7911692 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | P= | P | 11/07/2023 | Corrections complete / water heater vent & test ok (test via images) / current splice drwgs. in plan review Note : O/A via direct vent | FRANKM | FRANKM | | P= | P | 7911688 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PTO | P | 11/07/2023 | Need plans revision for H2o tie in (drawings show 1-1/4" - currently tied in on 1") / need water heater intake and exhaust piping installed and on test ( will need manual for inspection of PAV) / Need engineer equipment change letter for water heater ( contractor installed AO- Smith GPDX-75L310) / need pedicure chair installation manuals / finish insulation per PIN notes / need engineers letter for floor sink to complete PB inspection / When using insert fittings for T&P drain piping needs to be 1 size larger than outlet of T&P - run to floor drain with airgap to code //// Engineers letter for AAV's is uploaded to images / nail protection okay - reviewed electronically. | DANR | DANR | | PTO | P | 7910566 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PTO | P | 10/17/2023 | Need plans revision for H2o tie in (drawings show 1-1/4" - currently tied in on 1") / need water heater intake and exhaust piping installed and on test ( will need manual for inspection of PAV) / Need engineer equipment change letter for water heater ( contractor installed AO- Smith GPDX-75L310) / missing nail protection DWV / need pedicure chair installation manuals / need engineers approval for 6 AAV's on stand pipes for chairs / finish insulation per PIN notes / need engineers letter for floor sink to complete PB inspection / When using insert fittings for T&P drain piping needs to be 1 size larger than outlet of T&P - run to floor drain with airgap to code / | DANR | DANR | | PTO | P | 7889689 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PIN | P | 10/17/2023 | Need to finish H2o insulation in ceiling and at water heater / | DANR | DANR | | PIN | P | 7889675 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PB | P | 10/17/2023 | 3" tie in okay / need engineer approval for removing existing floor sink by tie in. | DANR | DANR | | PB | P | 7889672 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PB | P | 09/27/2023 | Need installation instructions on Pedicure chairs / missing 3" DWV tie in by floor sink / | DANR | DANR | | PB | P | 7869630 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | XPS | T | 11/08/2023 | PAID (REC#2006199) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P0.1 and P1.2. | SHANEN | SHANEN | | XPS | T | 7912151 |