LAYTON CONSTRUCTION COMPANY, LLC | B= | C | 02/08/2024 | Photos of corrections on file. | MATTHEWA | MATTHEWA | | B= | C | 7990243 |
LAYTON CONSTRUCTION COMPANY, LLC | B= | P | 12/29/2023 | Missing protection at pipes under sink from sharp and abrasive surfaces in mother's room (Room 211). / Incorrect door hardware installed at focus room (Room 213). / Rest of final okay. / Pending other finals. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), HEATING & PLUMBING ENGINEERS, INC Plumbing Final Inspection is not Completed yet. | MATTHEWA | MATTHEWA | | B= | P | 7956266 |
LAYTON CONSTRUCTION COMPANY, LLC | BFR | P | 11/02/2023 | Attach mechanical to permit. / Complete other rough inspections. / Frame okay pending other rough inspections./ Reviewed Accessible Elements / | ERAMIREZ | ERAMIREZ | | BFR | P | 7907639 |
ENCORE ELECTRIC, INC. | E= | C | 12/21/2023 | | JOHNN | JOHNN | | E= | C | 7951564 |
ENCORE ELECTRIC, INC. | E= | P | 11/20/2023 | waiting for furniture to arrive and be connected/ | JOHNN | JOHNN | | E= | P | 7924044 |
ENCORE ELECTRIC, INC. | ER | P | 10/23/2023 | walls marked on plans a100 | MATTHEW | MATTHEW | | ER | P | 7896409 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 12/13/2023 | PLAN SPLICE ATTACHED TO APPROVED PLANS, SCOPE OF WORK CORRECTED, T-STAT LOCK BOXES INSTALLED (SEE IMAGES). FINAL FOR MECHANICAL CONTRACTOR | BILLS | BILLS | | H= | C | 7943622 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 11/28/2023 | NEED PLAN SPLICE SHOWING ACTUAL WORK PERFORMED. CONTRACTOR TO CORRECT SCOPE OF WORK FROM 12 OTHERS TO 3 OTHERS. CONTRACTOR TO ATTACH PICTURES OF THE T-STAT LOCK-BOXES AT THE 2 RE-LOCATED T-STATS. **REMOVED 1 SUPPLY AIR AND ADDED 2 RETURN AIR GRILLES AT ROOM #239. | BILLS | BILLS | | H= | P | 7929070 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 02/07/2024 | | TAYLOR | TAYLOR | | P= | C | 7989883 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 02/07/2024 | revised plans ok. | TAYLOR | TAYLOR | | PTO | C | 7989877 |
HEATING & PLUMBING ENGINEERS, INC | P= | L | 02/06/2024 | no access. | TAYLOR | TAYLOR | | P= | L | 7987976 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 12/29/2023 | Complete PTO / indirect waste piping for ice machine hub drain is not installed per detail on drwg. P-3 / no hot water @ break room sink | FRANKM | FRANKM | | P= | P | 7956829 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/08/2023 | -Insulate in wall H2O (P.IN insp.) / ice machine hub drain piping incomplete / complete DWV tie ins to existing -OK on in wall DWV & H2O in mothers 211 & break 233 Note : lavs are fixture change out only / integral s.a. @ ice maker boxes / existing VTR's | FRANKM | FRANKM | | PTO | P | 7912236 |
HEATING & PLUMBING ENGINEERS, INC | XPS | T | 01/30/2024 | PAID (REC#2029655): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P-2 and P-3. | SHANEN | SHANEN | | XPS | T | 7981784 |
LAYTON CONSTRUCTION COMPANY, LLC | XBS | T | 12/12/2023 | PAID (REC#2015773) PLAN SPLICE FEE: $50 by: CGIECK for Construction: UPDATED WALL TYPE | CGIECK | CGIECK | | XBS | T | 7942219 |
HEATING & PLUMBING ENGINEERS, INC | XMS | T | 11/30/2023 | PAID (REC#2012392): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 7931218 |