NUNN CONSTRUCTION, INC. | BFR | P | 03/26/2024 | Sector J - Hold room 6 - Metal soffit framing OK except for a small section where it will tie in to a new wall at Retail North / Wall is not constructed yet | ADAML | ADAML | | BFR | P | 8033985 |
NUNN CONSTRUCTION, INC. | BFR | P | 02/29/2024 | Sector H - Lounge - Metal framing OK around new window at exterior wall / Discussed fire rated wall per a recent splice and will follow up after further research | ADAML | ADAML | | BFR | P | 8010771 |
NUNN CONSTRUCTION, INC. | BFR | P | 02/14/2024 | SECTOR H - ELEVATOR SHAFT FURR WALL FRAMING // need to update plan for wall typ built on site - no inspection for this wall
SECTOR H - LOUNGE AREA WALL FRAMING // still need to inspect exterior wall and fire barrier wall framing below suspended floor when ready / rest of light gauge steel wall framing and ceiling track joint fire stop material OK in lounge | LONNYS | LONNYS | | BFR | P | 7995875 |
NUNN CONSTRUCTION, INC. | BSP | P | 12/21/2023 | Phase 1 Sector H - Mens and Womens Restrooms and Janitor Closet final items OK for public access pending all other required finals / Temp walls in place separating in progress construction areas | ADAML | ADAML | | BSP | P | 7951459 |
NUNN CONSTRUCTION, INC. | BSP | P | 12/20/2023 | Phase 1 Sector H - Inspection for final items to open access to the public / Need to see temporary walls in place / Remaining final items OK for Mens and Womens South Restrooms 261 and 263 and Janitor South 262
Phase 1 Sector H - Steel framing OK for Family South 264 and Pet Relief 271 including hard lids / Lounge 273 - Steel framing OK for both interior perimeter walls / Steel framing OK for floor framing per S120A / Concrete slab will be 3rd party observations / Exterior wall for Lounge not inspected yet, will be inspected once new windows are cut in and framed
**Discussed RFI and details for new shaftliner being installed in the vicinity of Elevator 4 per UL U415 - No inspections performed yet | ADAML | ADAML | | BSP | P | 7950865 |
NUNN CONSTRUCTION, INC. | BFR | P | 12/12/2023 | Phase 1 Sector H - Metal soffit framing OK between Mens and Womens Restrooms 261 and 263 per 9 A250A / Discussed final item inspection procedures and requirements to open this area to the public | ADAML | ADAML | | BFR | P | 7943319 |
NUNN CONSTRUCTION, INC. | BFR | P | 12/06/2023 | Phase 1 -- Observed light gauge framing at facade for south restrooms sector H -- Observed new door framing at janitor closet pending revised plans to show new fire door | CHAD | CHAD | | BFR | P | 7937184 |
NUNN CONSTRUCTION, INC. | BFR | P | 11/30/2023 | Phase 1 - Sector G - Soffit framing OK above Ramp per RFI 1 / Sector H - Mens and Womens South Restrooms 261 and 263 - Hard lid and soffit framing OK over both restrooms | ADAML | ADAML | | BFR | P | 7932487 |
NUNN CONSTRUCTION, INC. | BFR | P | 11/13/2023 | Phase 1 - Sector H
Inspected from on site plans which will be added to a splice shortly
Lower level below concourse level - Office 159B - Observed 3 5/8 light gauge metal framing and box header around standpipe laterals / Hallway 159C - Metal framing around soffit OK that is covering standpipe lateral | ADAML | ADAML | | BFR | P | 7917326 |
NUNN CONSTRUCTION, INC. | BFR | P | 11/03/2023 | Phase 1 - Sector G - Pending all other required inspections
Hold room 2 and Hold room 4 - Metal soffit framing OK on both sides per 1-3 A -250A / RFI 21 observed for framing change to route around electrical conduit / West side soffit framing OK from end of ramp to end of Hold room 4 / RFI 1 will address reconfiguration of soffit framing over ramp to be inspected at a later date / West side high soffit framing OK full length of Hold room 2 and 4
Gate 2 and Gate 4 Entry Portals - Metal framing around portals OK per 7 A-841A and 4 A-842A | ADAML | ADAML | | BFR | P | 7909128 |
NUNN CONSTRUCTION, INC. | BFR | P | 10/27/2023 | THIS IS A 2021 IEBC LEVEL 3 ALTERATIONS PERMIT - Multiple Phases
Pending all other required inspections
Phase 1 - Sector H - Metal framing OK for Mens and Womens South Restrooms 261 and 263 walls only
| ADAML | ADAML | | BFR | P | 7902306 |
NUNN CONSTRUCTION, INC. | BSP | P | 10/06/2023 | Pre construction meeting with representatives from all departments / Discussed inspection procedures for project | ADAML | ADAML | | BSP | P | 7880272 |
GONZALES ELECTRIC, LLC | ER | P | 05/22/2024 | ceiling in hold room 6 --ok / need fire alarm called in / | BRIAN | BRIAN | | ER | P | 8092519 |
GONZALES ELECTRIC, LLC | E= | P | 04/16/2024 | Partial Final for gates 2 and 4 hold rooms, Pet Relief South, Family Restroom South | JIMMY | JIMMY | | E= | P | 8054169 |
GONZALES ELECTRIC, LLC | ER | P | 04/15/2024 | 1 column with 2 plug / data ---------------- over by window plug | CRAIG | CRAIG | | ER | P | 8052549 |
GONZALES ELECTRIC, LLC | ER | P | 04/03/2024 | Gate 6 portal and Ceiling/Cable Tray outside of Pet Relief Room 271 and Family South Restroom 264. | JIMMY | JIMMY | | ER | P | 8041420 |
GONZALES ELECTRIC, LLC | ER | P | 04/03/2024 | Gate 6 portal and Ceiling/Cable Tray outside of Pet Relief Room 271 and Family South Restroom 264. | JIMMY | JIMMY | | ER | P | 8041421 |
GONZALES ELECTRIC, LLC | ER | P | 03/27/2024 | Roof Top Units EF-02, EF-03, and 30 amp Split Unit OU-02-- all ok | JIMMY | JIMMY | | ER | P | 8035167 |
GONZALES ELECTRIC, LLC | EP | P | 03/20/2024 | -Panel CMR5 120V/208Y 100A OK | LARRYT | LARRYT | | EP | P | 8028248 |
GONZALES ELECTRIC, LLC | ER | P | 02/28/2024 | In Wall Rough at Lounge Entry---Ceiling Rough at Pet Relief Room 271--Ceiling Rough at new Electric Room 265 Entry | JIMMY | JIMMY | | ER | P | 8009273 |
GONZALES ELECTRIC, LLC | ER | P | 02/16/2024 | above ceiling in 2 and 4 hold area for T in cable tray ok | CRAIG | CRAIG | | ER | P | 7997917 |
GONZALES ELECTRIC, LLC | ER | P | 02/13/2024 | above ceiling in 2 and 4 hold area ok note cable tray T not installed at this time and above ceiling not ready for inspection | CRAIG | CRAIG | | ER | P | 7994421 |
GONZALES ELECTRIC, LLC | E= | P | 12/19/2023 | Bathrooms and janitor closet ok--- 12000 watt 3 phase water heater | JIMMY | JIMMY | | E= | P | 7949047 |
GONZALES ELECTRIC, LLC | ER | P | 12/13/2023 | Gates 2 and 4 Column In Wall Rough--Lower Level Hallway Rm 159C Ceiling ok | JIMMY | JIMMY | | ER | P | 7944591 |
GONZALES ELECTRIC, LLC | ER | P | 12/07/2023 | Exterior bathroom walls ok | JIMMY | JIMMY | | ER | P | 7938785 |
GONZALES ELECTRIC, LLC | ER | P | 12/01/2023 | hard lid ceiling in bathrooms 261, 263 ok wall in room 262 for light switch / card reader ------- note smoke up on concrete ceiling needs to be move below drop ceiling ( RFI ) | CRAIG | CRAIG | | ER | P | 7932782 |
GONZALES ELECTRIC, LLC | ER | P | 11/29/2023 | -Gate 2 and 4 Hold Rooms In Wall Rough ( no columns) --- Family South Restroom 264 In Wall and Ceiling Rough --- Lower Level Custodian Offices 159a, 159b Ceiling Rough | AARONR | AARONR | | ER | P | 7930866 |
GONZALES ELECTRIC, LLC | ER | P | 11/10/2023 | wall and ceiling for Gate Portal rooms 256 and 260 | JIMMY | JIMMY | | ER | P | 7915317 |
GONZALES ELECTRIC, LLC | ER | P | 10/24/2023 | Restroom 261, 263 walls | JIMMY | JIMMY | | ER | P | 7897420 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 05/21/2024 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 483 SECTOR H AND BDA PAGE 484 SECTOR J - LINEAR SLOT DIFFUSERS AT OUTSIDE WALLS ONLY NOTE / 12 SLOT DIFFUSERS / OK / | JERRYF | JERRYF | | HD | P | 8090568 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 04/25/2024 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 483 - SHEET 102A - SA / EXHAUST / GRILLES - FINAL CONNECTIONS IN ROOMS 271 PET RELIEF AND FAMILY RESTROOM 263 AND REVISED BDA PAGE 484 - SHEET M103A - VAV BOXES AT FUTURE TENANT SPACES AT HOLD ROOM 279 TO INCLUDE VAV BOXES 902 - 904 - 905 -RETAIL 274 VAV BOX 909 MEDIUM PRESSURE MAINS AND BOXES ONLY (RUN OUTS WILL BE INSTALLED AT TENANT BUILD OUT NOTE / VAV BOX X 4 / SUPPLY / EXHAUST GRILLES /((OK)) / | JERRYF | JERRYF | | H= | P | 8064535 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | L | 04/12/2024 | CANCELED BY CONTRACTOR | JERRYF | JERRYF | | HD | L | 8050540 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 03/13/2024 | THIS INSPECTION WAS FOR BDA PAGE 483 SHEET MH 102A - VAV BOXES - DUCT MAINS - RUN OUTS - FIRE DAMPERS - STILL NEED ACCESS DOORS AND LABELS - REMOVE FIRE CAULKING FROM 12" FIRE DAMPER (CONTRACTOR TO ATTACH PICTURE TO NEXT INSPECTION REQUEST) NOTE / BOXES / DAMPERS AND RETAINAGE / SA MAINS / RUN OUTS ((OK)) / | JERRYF | JERRYF | | HD | P | 8022432 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 02/21/2024 | THIS INSPECTION WAS DONE USING BDA PAGE 434 FROM LINES N TO P. STILL NEED VAV 737 AND ALL LOW PRESSURE DUCT. NOTE / ALL MEDIUM PRESSURE DUCT AND OTHER VAVS (((OK))) OK TO INSULATE / | NICKE | NICKE | | HD | P | 8001517 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/31/2024 | THIS INSPECTION WAS FOR BDA PAGE 265 SHEET MH101A - HAD CONSULT ON 30" ROUND TO 20" ROUND TIE IN TO EXISTING ((THIS SECTION OF DUCT WILL BE INSPECTED IN LATER PHASE)) - SLOT DIFFUSERS NOTE / ALL SLOT DIFFUSERS AND TIE INS ((OK)) / | JERRYF | JERRYF | | HD | P | 7982880 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/19/2023 | THIS INSPECTION WAS FOR FIRE DAMPER FRAMING BDA PAGE 264 - 2 12" ROUND DAMPERS AT ROOM 271 PET RELIEF NOTE / DAMPER FRAMING X 2 ((OK)) | JERRYF | JERRYF | | HD | P | 7948711 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 12/19/2023 | THIS INSPECTION WAS FOR BDA PAGE 264 - ROOM 261 MEN'S RESTROOM - ROOM 263 WOMEN'S RESTROOM AND 4 SUPPLY GRILLES OUTSIDE RESTROOMS IN CONCOURSE NOTE / ABOVE CEILING SA / RA / EXHAUST GRILLES / FINAL CONNECTIONS ARE ((OK)) | JERRYF | JERRYF | | H= | P | 7948709 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HRP | P | 12/11/2023 | Sector H-
Inspection of condensate drain for IU-02 (Electrical Room #265) 50 lb. test ok. Note / Piping installed per plans (MP102A). | PAULO | PAULO | | HRP | P | 7941754 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 11/27/2023 | THIS INSPECTION WAS FOR BDA PAGE 264 12" ROUND FIRE DAMPERS X 2 OUTSIDE ELECTRIC ROOM 265 - NEED FULL LENGTH STUDS TO EXTEND FROM FLOOR TO TIE IN AT ROOF - NEED SCREWS REMOVED FROM INSIDE DAMPER OPENING AND INSTALLED ON FACE OF STUDS - STOPPED INSPECTION | JERRYF | JERRYF | | HSP | P | 7927611 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/31/2023 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 264 SECTOR H - MEN'S AND WOMEN'S SOUTH - STILL NEED ALL 12" ROUND FIRE DAMPERS - ROOMS 266A - 271 - 273A NOTE / ALL VAVS / SA /MAINS / RUN OUTS / EXHAUST / MEDIUM PRESSURE TIE INS ((OK)) - BDA PAGE 265 SECTOR G - STILL NEED THE FOLLOWING - VAV'S -722 - 707 - 713 - 717 - 721 AND ALL ASSOCIATED DUCTS - LINEAR SLOTS AT TENANT SPACE 252A NOTE / ALL VAV'S / SA / MAINS / RUN OUTS / EXHAUST ((OK)) | JERRYF | JERRYF | | HD | P | 7904382 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 10/09/2023 | 10 AM On site consultation with contractors, discussed project progression and inspection procedures / | NICKE | NICKE | | HSP | P | 7881175 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 10/06/2023 | 10 AM On site consultation with contractors, discussed project progression and inspection procedures / | JERRYF | JERRYF | | HSP | P | 7880429 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 10/06/2023 | 10 AM On site consultation with contractors, discussed project progression and inspection procedures / | WHITNEYH | WHITNEYH | | HSP | P | 7880353 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | P= | P | 04/17/2024 | for family rest room and pet relief, need engineer letter for sink fixture used at pet relief, rest ok for family and pet relief rooms | JOSEPHD | JOSEPHD | | P= | P | 8055328 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 02/09/2024 | for area H, pet relief and lounge area, pet relief valve and mixing valve ok, plans show 1 1/4 inch cold water to lounge area there is 1 inch run now will need to get plans changed to match work done, dwv stubbed into lounge from 1st floor ok | JOSEPHD | JOSEPHD | | PTO | P | 7991838 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | P= | P | 12/20/2023 | Area H, for men's and women's bathrooms, need to see flush valves completed at toilets, need to see water heater pan drain run to floor drain, need to see insulation on water piping at water heater, need trap guard at water heater, need engineer letter for changing water heater from AO smith to State, still need to see family bathroom and pet relief completed, rest of men's and women's rest rooms in area H ok | JOSEPHD | JOSEPHD | | P= | P | 7949987 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 11/29/2023 | Area H per relief under floor relocated floor drain and venting ok, need to add pet relief sprayer to plans under floor was tested, still need to see in wall for sprayer | JOSEPHD | JOSEPHD | | PTO | P | 7930123 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 11/20/2023 | AREA H, need to see floor drain for dog area re-tested after relocation, need to see pet area wash valve installed and added to plans, rest of family and pet relief in wall ok | JOSEPHD | JOSEPHD | | PTO | P | 7923466 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 11/15/2023 | area H under floor need plans to match new point of connection, under floor piping was sized per plan and tested, family bathroom and pet area under floor dwv ok, water piping under floor ok need to see insulation, need to see in-wall at family bathroom and pet area completed | JOSEPHD | JOSEPHD | | PTO | P | 7919246 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 11/03/2023 | DWV and H2O in wall for drinking fountain ok. | TAYLOR | TAYLOR | | PTO | P | 7908915 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 10/31/2023 | area H men's urinal wall dwv and water pipe in-wall ok, water pipe insulation in bathrooms ok,
still need to see under floor, family restroom, pet area, drinking fountain, and lounge completed | JOSEPHD | JOSEPHD | | PTO | P | 7904269 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 10/27/2023 | area H, men's urinal wall dwv under sized plans call for 3" and water pipe not completed, rest of men's dwv and water pipe in-wall and over head ok, need to see under floor at next inspection | JOSEPHD | JOSEPHD | | PTO | P | 7901368 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | P | 10/25/2023 | area H, need plans to reflect new point of connection for dwv, dwv in men's and women's bathroom ok, water in women's ok, need to see family bathroom and dog area, and water insulation | JOSEPHD | JOSEPHD | | PTO | P | 7898738 |
GONZALES ELECTRIC, LLC | XES | P | 02/29/2024 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power, revised lighting, revised schedules. | BERTHA | BERTHA | | XES | P | 8010551 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 02/29/2024 | PAID (REC#2042382): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Revised diffusers | DALEH | DALEH | | XMS | T | 8009679 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XPS | P | 02/28/2024 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Revised sheet PD106A, PL102A, PL106A and PP106A. | SHANEN | SHANEN | | XPS | P | 8008977 |
NUNN CONSTRUCTION, INC. | XBS | T | 02/28/2024 | PAID (REC#2042370): PLAN SPLICE FEE: $50 by: DANM for Construction: Architectural and structural revisions only | DANM | DANM | | XBS | T | 8008581 |
GONZALES ELECTRIC, LLC | XES | P | 01/18/2024 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power and schedules. | BERTHA | BERTHA | | XES | P | 7971282 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 01/16/2024 | PAID (REC#2027530): PLAN SPLICE FEE: $75 by: DALEH for Mechanical: Clouds | DALEH | DALEH | | XMS | T | 7968843 |
NUNN CONSTRUCTION, INC. | XBS | T | 12/21/2023 | PAID (REC#2024451): PLAN SPLICE FEE: $50 by: DANM for Construction: Various architectural and structural revisions trhoughout | DANM | DANM | | XBS | T | 7952220 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 12/01/2023 | PAID (REC#2013228): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Clouds | DALEH | DALEH | | XMS | T | 7932879 |
GONZALES ELECTRIC, LLC | XES | T | 12/01/2023 | PAID (REC#2013228): PLAN SPLICE FEE: $50 by: RICHG for Electrical: Revised electrical plans. | RICHG | RICHG | | XES | T | 7932822 |
NUNN CONSTRUCTION, INC. | XBS | T | 11/13/2023 | PAID (REC#2007930): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Minor architectural changes, to include changing room and lounge. Minor structural detail changes. | BPHILLIPS | BPHILLIPS | | XBS | T | 7916539 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XPS | T | 11/13/2023 | PAID (REC#2007930): PLAN SPLICE FEE: $66.67 by: SHANEN for Plumbing: Revised sheet P-001A, PD105A, PD106A, PL102A, PL106A, PL107A, PP106A, P-601A, P-701A and P-702A. Added sheet PD101A, PD102A, PL101A, PL105A, PP102A, PP105A | SHANEN | SHANEN | | XPS | T | 7916408 |
GONZALES ELECTRIC, LLC | XES | P | 10/26/2023 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Add RTU's | SHELBY | SHELBY | | XES | P | 7901075 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 10/06/2023 | PAID (REC#2000971): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Revised duct work | DALEH | DALEH | | XMS | T | 7879857 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XPS | T | 10/06/2023 | PAID (REC#2000971): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P-701A. | SHANEN | SHANEN | | XPS | T | 7879721 |