RAINE BUILDING LLC. | B= | C | 02/22/2024 | All other required Final inspections are complete. (This is a computer generated result) | JASONL | JASONL | | B= | C | 8002280 |
RAINE BUILDING LLC. | B= | P | 02/16/2024 | verification of final corrections on file / Final OK pending completion of outstanding inspections. Additional Inspections Required (computer generated): JOHNSON BROTHER'S PLUMBING & HEATING LLC Plumbing Final Inspection is not Completed yet. | JASONL | JASONL | | B= | P | 7997854 |
RAINE BUILDING LLC. | B= | P | 02/15/2024 | missing ANSI restroom signage / need to complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): JOHNSON BROTHER'S PLUMBING & HEATING LLC Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 7997295 |
RAINE BUILDING LLC. | BEN= | C | 02/15/2024 | no energy compliance required | BRIANB | BRIANB | | BEN= | C | 7996388 |
RAINE BUILDING LLC. | BFR | P | 12/19/2023 | Attach electrical to permit and complete outstanding rough inspections / Observed interior light gauge metal partition framing / Reviewed accessible elements | JASONL | JASONL | | BFR | P | 7949002 |
HARRIS ELECTRIC GROUP | E= | C | 02/13/2024 | Corrections made/ electrical complete | DAVIDRO | DAVIDRO | | E= | C | 7994731 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 02/08/2024 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7990501 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 02/08/2024 | FIRE ALARM INSPECTION: | AARONR | AARONR | | ER | C | 7990500 |
HARRIS ELECTRIC GROUP | E= | P | 02/01/2024 | Need Hospital grade receptacles in exam rooms per print / Half switched receptacles control not working / | ROB | ROB | | E= | P | 7984570 |
HARRIS ELECTRIC GROUP | ER | C | 02/01/2024 | Rough ok for Patient Care Ceilings / | ROB | ROB | | ER | C | 7984562 |
SPECIAL SYSTEMS DESIGN,LLC | E= | P | 01/31/2024 | FIRE ALARM INSPECTION: | ROB | ROB | | E= | P | 7983207 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 01/31/2024 | FIRE ALARM INSPECTION: Rough ok / | ROB | ROB | | ER | P | 7983202 |
HARRIS ELECTRIC GROUP | ER | P | 01/31/2024 | Rough ok for ceilings except 3 Patient Rooms / Discussed notes on prints for wiring methods and IECC 2021 requirements / | ROB | ROB | | ER | P | 7983201 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 01/10/2024 | FIRE ALARM INSPECTION: Bathroom hard lid ok / | ROB | ROB | | ER | P | 7963971 |
HARRIS ELECTRIC GROUP | ER | P | 01/08/2024 | Electrical rough ok for both bathroom ceilings -------- do not rock employee bath--FA box not re-installed / | ROB | ROB | | ER | P | 7962638 |
HARRIS ELECTRIC GROUP | ER | P | 12/21/2023 | Rough ok for new walls except reception wall---Ok to upload pic with next inspection request for reception wall / | ROB | ROB | | ER | P | 7952350 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | C | 02/02/2024 | CORRECTIONS MADE, SEE IMAGES /// MECHANICAL FINAL OK / | STEPHANIEV | STEPHANIEV | | H= | C | 7985058 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | P | 02/01/2024 | FINAL PENDING - AHU THERMOSTAT NEEDS TO BE RELOCATED IN ROOM 111 / 24X24 RETURN AIR GRILLE INSTALLED IN 101 / 24X24 RETURN AIR GRILLE INSTALLED IN HALLWAY ACROSS FROM ROOM 103 / OK TO ATTACH PICTURE OF CORRECTION TO AN INSPECTION REQUEST / | STEPHANIEV | STEPHANIEV | | H= | P | 7984315 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HSP | P | 02/01/2024 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES / | STEPHANIEV | STEPHANIEV | | HSP | P | 7983730 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HD | C | 01/02/2024 | THERE IS A LARGE HOLE IN THE WALL BETWEEN ROOM #101 AND STORAGE SPACE TO THE SOUTH. PLAN DOES NOT SHOW IF WALL IS RATED OR NOT. PER DISCUSSION WITH BUILDER THEY WILL GET WITH THE BUILDING INSPECTOR AND PATCH HOLE TO MEET CODE BY / ALL DUCT ROUGH OK. OK TO INSULATE / | LIDO | LIDO | | HD | C | 7957614 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | C | 02/22/2024 | Corrections complete via images | FRANKM | FRANKM | | P= | C | 8002279 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | P | 02/15/2024 | Complete PTO / no hot water @ sinks | FRANKM | FRANKM | | P= | P | 7997504 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | P | 01/02/2024 | -Engineer letter required to eliminate wet trap primer & 1/2" H2O up to L2 coffee maker / complete overhead DWV & H2O / insulate in wall H2O (pics ok) -OK on in wall DWV & H2O in rooms 103 & 106 minus corrections -OK on water heater install Note : electric water heater | FRANKM | FRANKM | | PTO | P | 7957173 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PB | P | 12/07/2023 | dwv not sized per plan, plans call for 4" connecting to 4" will need plans to reflect changes, will need engineer letter for pvc and to eliminate trap primer, piping was tested and installed per code | JOSEPHD | JOSEPHD | | PB | P | 7938956 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | XPS | T | 12/11/2023 | PAID (REC#2017588): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: See plans for clouds | TCRIPPEN | TCRIPPEN | | XPS | T | 7941264 |