THOMAS GENERAL CONTRACTORS, INC. | B= | C | 05/20/2024 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 8089983 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 05/07/2024 | intermediate handrail verified / building final OK pending other required inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BUDS ELECTRIC LLC Electrical Final Inspection is not Completed yet, CLEAR WATER PLUMBING, HEATING & UTILITIE Mechanical Final Inspection is not Completed yet, FIREPLACE WAREHOUSE ETC. Mechanical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 8075827 |
THOMAS GENERAL CONTRACTORS, INC. | B= | T | 04/23/2024 | PAID (REC#2056489): Temp CO: pending final inspections ( Expires: 5/23/2024 12:00:00 AM) | NELIDA | NELIDA | | B= | T | 8062153 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 04/22/2024 | upper level stairs missing intermediate hand rail / rest of building final OK pending other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, BUDS ELECTRIC LLC Electrical Final Inspection is not Completed yet, ALL TYPE MECHANICAL SERVICES INC Mechanical Final Inspection is not Completed yet, CLEAR WATER PLUMBING, HEATING & UTILITIE Mechanical Final Inspection is not Completed yet, FIREPLACE WAREHOUSE ETC. Mechanical Final Inspection is not Completed yet, PEAK REFRIGERATION INC Mechanical Final Inspection is not Completed yet, CLEAR WATER PLUMBING, HEATING & UTILITIE Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 8060145 |
THOMAS GENERAL CONTRACTORS, INC. | BEN= | C | 04/12/2024 | no BEN= required for remodel | LONNYS | LONNYS | | BEN= | C | 8050587 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 03/05/2024 | fire place framing OK pending other roughs | LONNYS | LONNYS | | BFR | P | 8014295 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | R | 02/22/2024 | documents uploaded already spliced into approved plans | LONNYS | LONNYS | | BFR | R | 8002358 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 02/13/2024 | need to update structural plans for as built conditions / rest of interior framing OK pending other required inspections / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 7994350 |
BUDS ELECTRIC LLC | E= | C | 05/07/2024 | | BRIAN | BRIAN | | E= | C | 8076958 |
BUDS ELECTRIC LLC | E= | P | 04/22/2024 | need disco at fan in walk in cooler / breaker lock on dish washer / missing fire place / rest ok / | BRIAN | BRIAN | | E= | P | 8060512 |
BUDS ELECTRIC LLC | ER | C | 02/29/2024 | stage and rest of pipe work--ok / | BRIAN | BRIAN | | ER | C | 8010607 |
BUDS ELECTRIC LLC | ER | P | 02/14/2024 | walls and hard lids--ok / | BRIAN | BRIAN | | ER | P | 7996185 |
BUDS ELECTRIC LLC | ESL | C | 02/01/2024 | | BRIAN | BRIAN | | ESL | C | 7984424 |
FIREPLACE WAREHOUSE ETC. | H= | C | 05/15/2024 | PICTURES PROVIDED FOR NON-COMBUSTIBLE FACING AROUND FIREPLACE. | MARKB | MARKB | | H= | C | 8085148 |
FIREPLACE WAREHOUSE ETC. | HV | C | 05/07/2024 | FOR FINAL - Need non-combustible facing installed. FIREPLACE AND VENT CLEARANCES OK. ROOF TERMINATION COMPLETE. | MARKB | MARKB | | HV | C | 8076918 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | H= | C | 05/07/2024 | CORRECTION MADE | MARKB | MARKB | | H= | C | 8076916 |
PEAK REFRIGERATION INC | H= | C | 05/01/2024 | CORRECTIONS MADE - SEE IMAGES | MARKB | MARKB | | H= | C | 8070093 |
ALL TYPE MECHANICAL SERVICES INC | H= | C | 05/01/2024 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 8070088 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | H= | P | 04/26/2024 | FINAL PENDING - Remove medium pressure labels from low pressure gas piping after regulator. FIREPLACE REGULATOR RELOCATED PER PLAN. | MARKB | MARKB | | H= | P | 8066276 |
PEAK REFRIGERATION INC | H= | P | 04/24/2024 | FINAL PENDING - Label condensers on roof. Support lineset to ice make condenser on roof. CONDENSATE PIPING COMPLETE. | MARKB | MARKB | | H= | P | 8063884 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | H= | P | 04/22/2024 | FINAL PENDING - Need to complete fireplace. | MARKB | MARKB | | H= | P | 8060245 |
PEAK REFRIGERATION INC | H= | P | 04/18/2024 | FINAL PENDING - Install condensate piping for wakin cooler. Need roof inspection. | MARKB | MARKB | | H= | P | 8057289 |
PEAK REFRIGERATION INC | HRP | C | 04/18/2024 | 300 PSI PRESSURE TEST FOR WALKIN COOLER OK. NO REFRIGERATION ALARMS REQUIRED PER CALC'S ON PLANS. | MARKB | MARKB | | HRP | C | 8057285 |
FIREPLACE WAREHOUSE ETC. | H= | P | 04/18/2024 | NO INSPECTIONS COMPLETED - STILL WAITING FOR PLAN SPLICE AND FIREPLACE TO BE DELIVERED. | MARKB | MARKB | | H= | P | 8056618 |
ALL TYPE MECHANICAL SERVICES INC | H= | P | 04/17/2024 | FINAL PENDING - Provide test and balance report. ALL DUCT, GRILLS & TRANSFERS INSTALLED PER PLAN. | MARKB | MARKB | | H= | P | 8055861 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HC | C | 04/16/2024 | ADDING FIREPLACE TO METER. | MARKB | MARKB | | HC | C | 8054138 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | C | 04/16/2024 | --THERE WILL BE A SPLICE FOR A U.L. LISTED FIREPLACE. FIREPLACE ON ORDER. WILL NEED A FIREPLACE CONTRACTOR ATTACHED TO PERMIT. Still need regulator installed for fireplace and medium pressure labels. | MARKB | MARKB | | HI | C | 8054129 |
PEAK REFRIGERATION INC | HRP | P | 04/01/2024 | LINESET IN SECOND FLOOR CHASE FOR ICE MACHINE OK TO COVER. | MARKB | MARKB | | HRP | P | 8039222 |
PEAK REFRIGERATION INC | HRP | P | 03/29/2024 | --NEED FIREPLACE CONTRACTOR ATTACHED TO PERMIT. ICE MACHINE - Need condenser on roof shown on plans. Repair torn lineset insulation. LINESET HAS NO JOINTS FROM ICE MACHINE UP TO ROOF. Walkin cooler not ready. | MARKB | MARKB | | HRP | P | 8037419 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | P | 03/05/2024 | ----ENGINEER TO ADDRESS: First floor plan shows gas fireplace. Found on site this is not the case, will be a fire feature installed under a type 2 hood. All fuel burning appliances installed must be listed by an approved agency as such. How will this install comply with 2021 IFGC sections 501.7.1, 503.3.4, 503.7.6, 602 - 605.1. How is combustion air provided to this fireplace? Gas piping does not run underground as shown on plan.---- --NEED FIREPLACE CONTRACTOR ATTACHED TO PERMIT. --CONTRACTOR TO ADDRESS PERMIT SCOPE - should only be 1 gas piping outlet. 10 PSI PRESSURE TEST OK FROM CEILING DOWN TO FIREPLACE LOCATION. | MARKB | MARKB | | HI | P | 8014695 |
ALL TYPE MECHANICAL SERVICES INC | HD | P | 02/21/2024 | 20X12 DUCT AND 8" DUCT FOR EG-1 IN CHASE OK TO COVER ON SECOND FLOOR. | MARKB | MARKB | | HD | P | 8001667 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | C | 04/30/2024 | | CODYP | CODYP | | P= | C | 8068865 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | P | 04/16/2024 | Need plan revisions as previously stated, NOTE/ Rest ok for final | CODYP | CODYP | | P= | P | 8053815 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | P | 03/27/2024 | NOTE/ Over head dwv in bar area ok/ Still need plan revisions and water tie in | CODYP | CODYP | | PTO | P | 8034386 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | P | 02/15/2024 | South wall in wall water lines ok/ VTR penetration ok/ Still need all other corrections from previous inspection | CODYP | CODYP | | PTO | P | 7996563 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | P | 02/14/2024 | Need to pipe water lines to plan or revise plans to show water pipe sizing and routing, Need drawings to show main level bar water lines getting piped underground, Need to complete overhead main level dwv piping, Need drawings to show upstairs restroom fixtures changing locations and upstairs floor sinks changing locations, Need to complete South wall water piping, Need to water tie ins, Need to see vtr penetration, NOTE/ Rest ok for in wall dwv and water piping | CODYP | CODYP | | PTO | P | 7996057 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | P | 02/02/2024 | Partial pending plan revision, NOTE/ Rest ok | CODYP | CODYP | | PB | P | 7985142 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | P | 02/01/2024 | Hydraulic jump at 3" stack by floor sink, Need plan revision for 1" water lines under concrete to bar, NOTE/ Rest ok | CODYP | CODYP | | PB | P | 7983826 |
FIREPLACE WAREHOUSE ETC. | XMS | T | 05/02/2024 | PAID (REC#2060036): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Removed exhaust fan and hood | DALEH | DALEH | | XMS | T | 8072596 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | XPS | T | 04/24/2024 | PAID (REC#2057114): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: Approved revised plumbing pages | TCRIPPEN | TCRIPPEN | | XPS | T | 8063598 |
BUDS ELECTRIC LLC | XES | T | 04/19/2024 | PAID (REC#2055113): PLAN SPLICE FEE: $52.5 by: BERTHA for Electrical: Revisions throughout. | BERTHA | BERTHA | | XES | T | 8058269 |
THOMAS GENERAL CONTRACTORS, INC. | XBS | T | 02/12/2024 | PAID (REC#2033372): PLAN SPLICE FEE: $50 by: DANM for Construction: Updated Structurals to delete upper level of storage room and opening to adjacent space | DANM | DANM | | XBS | T | 7993973 |