Scanned/Finished Bin | Original | / | 10/10/2017 | | JESSICAM | Location = Scanned/Finished Bin by JESSICAM | | Scanned/Finished Bin | 1002457 |
To Be Scanned Bin | Original | / | 10/9/2017 | | SCANNING | Location = To Be Scanned Bin by SCANNING | | To Be Scanned Bin | 1002333 |
Water Division | Original | N | 10/9/2017 | CSUREVIEW | CSUREVIEW | No utility work proposed outside the building. JPN | jnoble | Water Division | 1002262 |
Waste Water Div | Original | N | 10/9/2017 | CSUREVIEW | CSUREVIEW | No utility work proposed outside the building. JPN | jnoble | Waste Water Div | 1002260 |
CSU Utilities | Original | / | 10/9/2017 | | CSFIRE | Location = CSU Utilities by CSFIRE | wtaylor | CSU Utilities | 1002141 |
Hazmat | Original | N | 10/9/2017 | CSFIRE | CSFIRE | | wtaylor | Hazmat | 1002140 |
CO Springs Fire | Original | A | 10/9/2017 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | CO Springs Fire | 1002139 |
Fire | Original | / | 10/4/2017 | | MBINGMAN | Location = Fire by MBINGMAN | | Fire | 1000954 |
CO Springs DRE | Original | N | 10/4/2017 | MBINGMAN | MBINGMAN | Interior Remodel Only. No change of use. (see full review) | | CO Springs DRE | 1000953 |
Zoning/Planning | Original | / | 10/3/2017 | | SCANNING | Location = Zoning/Planning by SCANNING | | Zoning/Planning | 1000629 |
Plan Coordinator | Original | / | 10/3/2017 | | BRENT | Location = Plan Coordinator by BRENT | | Plan Coordinator | 1000610 |
Enumeration | Original | A | 10/3/2017 | BRENT | BRENT | single tenant on 8th floor | | Enumeration | 1000609 |
Enumeration | Original | / | 10/2/2017 | | RITA | Location = Enumeration by RITA | | Enumeration | 1000445 |
Electrical | Original | A | 9/28/2017 | SHELBY | SHELBY | | | Electrical | 999676 |
Electrical | Original | D | 9/13/2017 | SHELBY | SHELBY | 1. Provide load summary for all pieces of electrical gear in the chain of supply for this scope of work[ load summary must include loads demolished VS loads added]. 2. Label panels on one line to match panel schedules ( H6A VS HBA etc).
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 995138 |
Electrical | Original | D | 9/6/2017 | BERTHA | BERTHA | 1. Provide Panel Schedule H6. 2. Provide Conduit/wire size, type and quantity beginning at the utility transformer to include all conductors in the chain of supply for the electrical equipment in the scope of work. 3. Provide 2009 IECC.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 993160 |
Mechanical | Original | A | 9/6/2017 | TCRIPPEN | TCRIPPEN | okay | | Mechanical | 993098 |
Plumbing | Original | A | 9/6/2017 | TCRIPPEN | TCRIPPEN | okay | | Plumbing | 993093 |
Out to Review | Original | / | 9/6/2017 | SHELLEY | SHELLEY | | | Out to Review | 993087 |
Construction | Original | A | 9/6/2017 | SHELLEY | SHELLEY | | | Construction | 993086 |
Floodplain | Original | N | 8/30/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 991650 |