Required Departments: 3
|
|
|
Log Entries: 5
|
|
Electrical | Original | A | 9/8/2017 | BERTHA | BERTHA | | | Electrical | 994076 | Enumeration | Original | A | 9/8/2017 | BRENT | BRENT | | | Enumeration | 994059 | Out to Review | Original | / | 9/8/2017 | BERTHA | BERTHA | | | Out to Review | 994058 | Electrical | Original | D | 9/8/2017 | BERTHA | BERTHA | 1. Provide load calcs for all panels being utilized in the scope of work. 2. Provide available fault current for new panel R11A and R11B.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 994056 | Floodplain | Original | N | 9/8/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 994049 |
|
| |
|