Scanned/Finished Bin | Splice 9/17/18 | / | 11/19/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1132134 |
Finished Bin | Original | / | 11/19/2018 | | TCRIPPEN | Location = Finished Bin by TCRIPPEN | | Finished Bin | 1132131 |
Mechanical | Splice 9/17/18 | N | 11/16/2018 | DALEH | DALEH | no revisions to mechanical under this splice | | Mechanical | 1131639 |
Mechanical | Splice 9/17/18 | D | 11/15/2018 | DALEH | DALEH | need to cloud all changes for this splice (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1131254 |
Resubmittal 1 | Splice 9/17/18 | / | 11/15/2018 | BECKYA | BECKYA | Resubmittal #1 | | Resubmittal 1 | 1131243 |
Mechanical | Splice 9/17/18 | D | 9/17/2018 | DALEH | DALEH | see red line comments (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1110740 |
Plumbing | Splice 9/17/18 | A | 9/17/2018 | TCRIPPEN | TCRIPPEN | New splice pages revised roof drain , revised water diagram, adjusted schedule,showing water | | Plumbing | 1110705 |
Out to Review | Splice 9/17/18 | / | 9/17/2018 | BECKYA | BECKYA | | | Out to Review | 1110667 |
Mechanical | Splice 8/16/18 | A | 8/16/2018 | DALEH | DALEH | delta 10 | | Mechanical | 1100580 |
Out to Review | Splice 8/16/18 | / | 8/16/2018 | BECKYA | BECKYA | | | Out to Review | 1100553 |
Electrical | Splice 8/10/18 | A | 8/10/2018 | BERTHA | BERTHA | Added 3 pizza ovens and KEF. | | Electrical | 1098932 |
Mechanical | Splice 8/10/18 | A | 8/10/2018 | TCRIPPEN | TCRIPPEN | new splice pages removed water heater and vent, reduced BTU load showing water heater BTUS | | Mechanical | 1098919 |
Plumbing | Splice 8/10/18 | A | 8/10/2018 | TCRIPPEN | TCRIPPEN | new splices adding sub meters, removed one one water heater added pump for hot water | | Plumbing | 1098902 |
Out to Review | Splice 8/10/18 | / | 8/10/2018 | BECKYA | BECKYA | | | Out to Review | 1098863 |
Electrical | Splice 4/24/18 | A | 8/10/2018 | BERTHA | BERTHA | Added POS, revised lighting, revised Panel A. | | Electrical | 1098859 |
Resubmittal 1 | Splice 4/24/18 | / | 8/10/2018 | BECKYA | BECKYA | Resubmittal #1 | | Resubmittal 1 | 1098819 |
Mechanical | Splice 7/26/18 | A | 7/26/2018 | JUSTINC | JUSTINC | Revised to remove fire pit and associated gas piping | | Mechanical | 1093476 |
Out to Review | Splice 7/26/18 | / | 7/26/2018 | BECKYA | BECKYA | | | Out to Review | 1093446 |
Out to Review | Splice 4/24/18 | / | 4/24/2018 | DANM | DANM | | | Out to Review | 1060880 |
Construction | Splice 4/24/18 | A | 4/24/2018 | DANM | DANM | Revised number of can lights on RCP | | Construction | 1060879 |
Electrical | Splice 4/24/18 | D | 4/24/2018 | BERTHA | BERTHA | Provide updated Panel A. 10A added with POS. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1060864 |
Electrical | Splice 4/11/18 | A | 4/11/2018 | SHELBY | SHELBY | | | Electrical | 1056534 |
Mechanical | Splice 4/11/18 | A | 4/11/2018 | TCRIPPEN | TCRIPPEN | see note 19 , relocated KE 1 and 2 adjusted schedules | | Mechanical | 1056530 |
Plumbing | Splice 4/11/18 | A | 4/11/2018 | TCRIPPEN | TCRIPPEN | new splice added drinking fountain to schedule,added drain for drinking fountain and water lines added 3/4 drain line | | Plumbing | 1056499 |
Construction | Splice 4/11/18 | A | 4/11/2018 | SHELLEY | SHELLEY | Eliminated door 107, add entry wall, revise 2nd level restroom ceiling height | | Construction | 1056458 |
Out to Review | Original | / | 3/16/2018 | NELIDA | NELIDA | Scanned plan picked up by George (719) 632-9325 | | Out to Review | 1047938 |
Scanned/Finished Bin | Original | / | 3/15/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1047245 |
Electrical | Original | A | 3/15/2018 | SHELBY | SHELBY | New pages added after initial approval | | Electrical | 1047180 |
Gas/Elec. Utils | Original | A | 3/14/2018 | CSUREVIEW | CSUREVIEW | Comments addressed. RDS | rsolberg | Gas/Elec. Utils | 1046840 |
Out to Review | Original | / | 3/14/2018 | RITA | RITA | RIck 499-9024 | | Out to Review | 1046836 |
Finished Bin | Original | / | 3/13/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1046172 |
Plumbing | Original | A | 3/8/2018 | DALEH | DALEH | | | Plumbing | 1044697 |
Construction | Original | A | 3/8/2018 | MICHAELA | MICHAELA | | | Construction | 1044682 |
Out to Review | Original | / | 3/8/2018 | GITA | GITA | 3039418147 Scott | | Out to Review | 1044671 |
Finished Bin | Original | / | 3/6/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1043597 |
Gas/Elec. Utils | Original | D | 3/5/2018 | CSUREVIEW | CSUREVIEW | Previous comments have not been addressed: "Contact CSU Field Engineer DeeDee Brook at 719.668.4510 to discuss new gas meter requirements." JPN | jnoble | Gas/Elec. Utils | 1043403 |
Water Division | Original | A | 3/5/2018 | CSUREVIEW | CSUREVIEW | Comments addressed. JPN | jnoble | Water Division | 1043400 |
CSU Utilities | Original | / | 2/27/2018 | | CSFIRE | Location = CSU Utilities by CSFIRE | wtaylor | CSU Utilities | 1041198 |
CO Springs Fire | Original | A | 2/27/2018 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | CO Springs Fire | 1041194 |
Hazmat | Original | A | 2/27/2018 | CSFIRE | CSFIRE | Customer is requesting a deferred submittal for the CO2 beverage carbonation system. Per Stefan Manning, CSFD Haz-Mat Reviewer, the RBD building permit HM review can be approved, but information on the CO2 system must be reviewed and approved by the CSFD haz-mat reviewer prior to a building final inspection. | wtaylor | Hazmat | 1041124 |
Fire | Original | / | 2/26/2018 | | SCANNING | Location = Fire by SCANNING | | Fire | 1040708 |
Plan Coordinator | Original | / | 2/26/2018 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 1040670 |
Plumbing | Original | D | 2/26/2018 | TCRIPPEN | TCRIPPEN | see construction noted need to stamp elevation pages . (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1040669 |
Plumbing | Original | / | 2/26/2018 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 1040644 |
Plumbing | Original | / | 2/26/2018 | | SCANNING | Location = Plumbing by SCANNING | | Plumbing | 1040640 |
Plan Coordinator | Original | / | 2/23/2018 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 1040600 |
Mechanical | Original | A | 2/23/2018 | JUSTINC | JUSTINC | | | Mechanical | 1040599 |
Mechanical | Original | / | 2/23/2018 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 1040406 |
Mechanical | Original | / | 2/23/2018 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1040390 |
Plan Coordinator | Original | / | 2/23/2018 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1040358 |
Construction | Original | D | 2/23/2018 | DANM | DANM | Because surrounding materials is a building code compliance issue ID4 must be stamped and sealed by a design professional Cooler ceiling loading information must appear on a drawing stamped and sealed by a design professional and not labeled "Preliminary - Not for Construction" Walk-through review OK l (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1040357 |
Health Dept. | Original | A | 2/22/2018 | HEALTHDEPT | HEALTHDEPT | Approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. | galvarez | Health Dept. | 1040218 |
Construction | Original | / | 2/20/2018 | DANM | DANM | In Current Review by DANM | | Construction | 1039108 |
Construction | Original | / | 2/20/2018 | | MATTHEWM | Location = Construction by MATTHEWM | | Construction | 1038970 |
Resubmittal 1 | Original | / | 2/20/2018 | MATTHEWM | MATTHEWM | Resubmittal #1 | | Resubmittal 1 | 1038969 |
Out to Review | Original | / | 2/12/2018 | GITA | GITA | 8157618685 Courtney | | Out to Review | 1036805 |
Finished Bin | Original | / | 2/8/2018 | | RITA | Location = Finished Bin by RITA | | Finished Bin | 1035981 |
Out to Review | Original | / | 2/8/2018 | NELIDA | NELIDA | Scott 303-941-8147 | | Out to Review | 1035803 |
Scanned/Finished Bin | Original | / | 2/7/2018 | | AMY | Location = Scanned/Finished Bin by AMY | | Scanned/Finished Bin | 1035464 |
Enumeration | Original | / | 2/7/2018 | | SCANNING | Location = Enumeration by SCANNING | | Enumeration | 1035461 |
Finished Bin | Original | / | 2/5/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1034778 |
Health Dept. | Original | D | 2/5/2018 | HEALTHDEPT | HEALTHDEPT | Plan review required for Retail Food Establishment. Please contact the health department at (719) 578-3199 option 3. JZ 719-433-3685 | Jzimmerman | Health Dept. | 1034703 |
Health Dept. | Original | / | 2/2/2018 | | SCANNING | Location = Health Dept. by SCANNING | | Health Dept. | 1034499 |
City Engr | Original | N | 2/2/2018 | CSENGINEER | CSENGINEER | Plan set routed to RBD. jad | csengineer | City Engr | 1034466 |
Gas/Elec. Utils | Original | D | 2/1/2018 | CSUREVIEW | CSUREVIEW | Contact CSU Field Engineer DeeDee Brook at 719.668.4510 to discuss new gas meter requirements. | mlwilliams | Gas/Elec. Utils | 1033912 |
Water Division | Original | D | 2/1/2018 | CSUREVIEW | CSUREVIEW | Submit Backflow Device form to CSU. MLW | mlwilliams | Water Division | 1033880 |
Waste Water Div | Original | A | 2/1/2018 | CSUREVIEW | CSUREVIEW | | mlwilliams | Waste Water Div | 1033911 |
Waste Water Div | Original | D | 2/1/2018 | CSUREVIEW | CSUREVIEW | Provide a copy of the approved development plan in the set. Provide approved utility service plan in the set. Contact Utilities Development Services at 719.668.8261 with any questions. MLW | mlwilliams | Waste Water Div | 1033879 |
Hazmat | Original | D | 2/1/2018 | CSFIRE | CSFIRE | | wtaylor | Hazmat | 1033762 |
CO Springs Fire | Original | D | 2/1/2018 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | CO Springs Fire | 1033761 |
CO Springs DRE | Original | A | 1/31/2018 | MBINGMAN | MBINGMAN | MRB per RBT. Per CPC DP 17-00100 - RBT to complete CO (see full review) | | CO Springs DRE | 1033538 |
CSU Utilities | Original | / | 1/31/2018 | | CSUAPPSPRM | Location = CSU Utilities by CSUAPPSPRM | zshearer | CSU Utilities | 1033376 |
CSU Contract Admin. | Original | N | 1/31/2018 | CSUAPPSPRM | CSUAPPSPRM | Development Charges/Fee paid at Shell plan. ZJS | zshearer | CSU Contract Admin. | 1033374 |
CSU Contract Admin. | Original | / | 1/29/2018 | | SCANNING | Location = CSU Contract Admin. by SCANNING | | CSU Contract Admin. | 1032646 |
Plan Coordinator | Original | / | 1/29/2018 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 1032546 |
Mechanical | Original | D | 1/29/2018 | JUSTINC | JUSTINC | Verify rooftop equipment compliance per 09' IMC 304.11 Verify 10' separation from all exhaust outlets to mechanical intakes per 09' IMC 501.2.1 (3), (5) - (5.2) Provide a complete interlock schedule indicating ALL associated kitchen makeup air and shutdows interlocks, ie, gas solenoid valves, RTU's, MAU's, KEF's, ect... Verify interlocks shown in schedules they do not seem to be complete Ventilation O.S.A values do not match values indicated in RTU schedule? Provide schedule for MAU-1 like all other equipment scheduled Hood schedule appears to be missing item 11 dishwasher hood Interlock indicated for DEF-1 indicates wall switch? Indicate on plan how this will provide required makeup air when in operation Indicate on plan refrigeration calculations for each walk-in cooler/freezer. Indicate for each if within allowable limits per 09' IMC 1103.1 If over allowable limits indicate on plan how protecting. Indicate on plan locations and volume of stored CO2. Verify if within allowable limits per CSFD if over allowable limits indicate on plan how protecting KEF-2 tag indicated on sheet M2.1 where it appears should be DEF-1 Provide detail for exterior duct support Verify compliance with new roof elevations per 09' IMC 306.5
MECHANICAL REVIEW INCOMPLETE NO WALK THRU
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1032545 |
Mechanical | Original | / | 1/29/2018 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 1032471 |
Mechanical | Original | / | 1/29/2018 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1032441 |
Plan Coordinator | Original | / | 1/29/2018 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1032416 |
Electrical | Original | A | 1/29/2018 | SHELBY | SHELBY | | | Electrical | 1032415 |
Electrical | Original | / | 1/26/2018 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1032309 |
Plumbing | Original | D | 1/26/2018 | TCRIPPEN | TCRIPPEN | pending approved restroom elevations for construction. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1032291 |
Electrical | Original | / | 1/26/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1032015 |
Plan Coordinator | Original | / | 1/26/2018 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1032007 |
Construction | Original | D | 1/26/2018 | DANM | DANM | Revised areas noted on Code Study Form and Sheet G0.2 due to stair enclosure addition at existing roof Upper level labeled Mezzanine does not appear to meet mezzanine requirements Provide missing stair and ramp sections on First Floor Plan Clarify how Surrounding Materials requirements are being met from IBC 1210 in restrooms Stair #3 plan and section do not seem to match in regard to number of risers and treads shown Exit sign will be required at Stair #1 which is not shown on Electrical Clarify if a wall blocks off the underside of Stair #4 or if reduced head clearance is an issue Specify which doors will receive panic hardware Provide signature on Stamp on Sheet A9.1 Appears that "Mezzanine" floor is actually the top of the premanufactured coolers - provide loading capacity of the coolers to prove floor loading requirements are being met No walk-through review allowed
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1032006 |
Construction | Original | / | 1/25/2018 | DANM | DANM | In Current Review by DANM | | Construction | 1031752 |
Construction | Original | / | 1/25/2018 | | SCANNING | Location = Construction by SCANNING | | Construction | 1031738 |
Plan Coordinator | Original | / | 1/25/2018 | | BRENT | Location = Plan Coordinator by BRENT | | Plan Coordinator | 1031730 |
Enumeration | Original | A | 1/25/2018 | BRENT | BRENT | Tenant occupies 528 S. Tejon and 80 E. Moreno. Using 528 S. Tejon as business address. | | Enumeration | 1031729 |
Floodplain | Original | N | 1/25/2018 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6418319017) | | Floodplain | 1031657 |