Construction | Splice 07/06/20 | A | 7/7/2020 | DANM | DANM | Existing access ramp repairs | | Construction | 1345420 |
Electronic Plan | Splice 07/06/20 | / | 7/7/2020 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1345411 |
Construction | Splice 04/27/20 | A | 4/29/2020 | DANM | DANM | Structural revisions | | Construction | 1315782 |
Electronic Plan | Splice 04/27/20 | / | 4/29/2020 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1315746 |
Electrical | Splice 04/27/20 | A | 4/28/2020 | BERTHA | BERTHA | | | Electrical | 1315106 |
Electronic Plan | Splice 04/27/20 | / | 4/28/2020 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 1315091 |
Out to Review | Original | / | 3/9/2020 | GITA | GITA | drew 7198677034 | | Out to Review | 1295486 |
Scanned/Finished Bin | Original | / | 3/9/2020 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1295173 |
Plumbing | Original | A | 3/6/2020 | SHANEN | SHANEN | New P000 stamped. | | Plumbing | 1295014 |
Construction | Original | A | 3/3/2020 | LBENNETT | LBENNETT | | | Construction | 1293297 |
Out to Review | Original | / | 3/3/2020 | NELIDA | NELIDA | Bill H 719-867-7034 | | Out to Review | 1293253 |
City Engr. | Original | A | 3/3/2020 | CSENGINEER | CSENGINEER | Plan routed to RBD. pvm | csengineer | City Engr. | 1293226 |
City Engr | Original | / | 3/3/2020 | | CSFIRE | Location = City Engr by CSFIRE | dwithee | City Engr | 1293140 |
CO Springs Fire | Original | A | 3/3/2020 | CSFIRE | CSFIRE | (see full review) | csfdit | CO Springs Fire | 1293139 |
Electrical | Original | A | 3/3/2020 | BEND | BEND | | | Electrical | 1292890 |
Fire | Original | / | 3/2/2020 | | SCANNING | Location = Fire by SCANNING | | Fire | 1292130 |
Plan Coordinator | Original | / | 2/28/2020 | | BEND | Location = Plan Coordinator by BEND | | Plan Coordinator | 1292100 |
Electrical | Original | D | 2/28/2020 | BEND | BEND | Please comply with previous review comment #2. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1292099 |
Electrical | Original | / | 2/28/2020 | BEND | BEND | In Current Review by BEND | | Electrical | 1292077 |
Electrical | Original | / | 2/26/2020 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1290618 |
Plan Coordinator | Original | / | 2/25/2020 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1290587 |
Construction | Original | D | 2/25/2020 | DANM | DANM | Provide listed assembly for precast concrete beam(s) Walk-through review OK
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1290586 |
Construction | Original | / | 2/25/2020 | DANM | DANM | In Current Review by DANM | | Construction | 1290515 |
Construction | Original | / | 2/25/2020 | | RITA | Location = Construction by RITA | | Construction | 1290411 |
Resubmittal 1 | Original | / | 2/25/2020 | RITA | RITA | Resubmittal #1 | | Resubmittal 1 | 1290410 |
Health Dept. | Original | N | 2/24/2020 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT0042574 is valid from 3/2/20-9/2/20. | abrannon | Health Dept. | 1289690 |
Out to Review | Original | / | 1/10/2020 | RITA | RITA | Bill 330-519-7983 | | Out to Review | 1274874 |
Finished Bin | Original | / | 1/10/2020 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1274842 |
City Engr. | Original | D | 1/10/2020 | CSENGINEER | CSENGINEER | Insert a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan in the building permit set. Plan set route to RBD. pvm | csengineer | City Engr. | 1274770 |
Water Division | Original | N | 1/8/2020 | CSUREVIEW | CSUREVIEW | AJ 1/8/2020 | ajuvera | Water Division | 1273880 |
Waste Water Div | Original | N | 1/8/2020 | CSUREVIEW | CSUREVIEW | AJ 1/8/2020 | ajuvera | Waste Water Div | 1273878 |
CSU Utilities | Original | / | 1/8/2020 | | CSFIRE | Location = CSU Utilities by CSFIRE | wtaylor | CSU Utilities | 1273460 |
Hazmat | Original | N | 1/8/2020 | CSFIRE | CSFIRE | | wtaylor | Hazmat | 1273459 |
CO Springs Fire | Original | D | 1/8/2020 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | CO Springs Fire | 1273458 |
Fire | Original | / | 1/2/2020 | | RDCUSER | Location = Fire by RDCUSER | | Fire | 1272020 |
CO Springs DRE | Original | A | 1/2/2020 | RDCUSER | RDCUSER | ALL DEVELOPMENT MUST MAINTAIN CONSISTENT WITH THE STAMPLED APPROVED DEVELOPMENT PLAN, AR DP 06-00145-A5MJ16 (see full review) | | CO Springs DRE | 1272019 |
Zoning/Planning | Original | / | 12/31/2019 | | SCANNING | Location = Zoning/Planning by SCANNING | | Zoning/Planning | 1271585 |
Plumbing | Original | A | 12/31/2019 | SHANEN | SHANEN | Piping materials schedule added per phone conversation with engineer Barry Stamp on 12/31/19 (303-239-0908). | | Plumbing | 1271582 |
Plumbing | Original | / | 12/31/2019 | SHANEN | SHANEN | In Current Review by SHANEN | | Plumbing | 1271543 |
Plumbing | Original | / | 12/31/2019 | | SCANNING | Location = Plumbing by SCANNING | | Plumbing | 1271461 |
Plan Coordinator | Original | / | 12/31/2019 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 1271435 |
Mechanical | Original | N | 12/31/2019 | JUSTINC | JUSTINC | No new mechanical scope indicated | | Mechanical | 1271434 |
Mechanical | Original | / | 12/31/2019 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1271368 |
Plan Coordinator | Original | / | 12/31/2019 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1271312 |
Electrical | Original | D | 12/31/2019 | SHELBY | SHELBY | 1. Please provide panel schedule for panel CPNHG1. 2. Vehicle charging information in panel CPLNG1 does not match Key note 1 on sheet E 100 ( 120 volt VS 208 volt etc). (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1271310 |
Electrical | Original | / | 12/31/2019 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1271234 |
Electrical | Original | / | 12/30/2019 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1270725 |
Plan Coordinator | Original | / | 12/30/2019 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1270720 |
Construction | Original | D | 12/30/2019 | DANM | DANM | Areas of existing parking garage listed on Code Study Form seem to be high by about 30,000 sf - clarify Provide areas of both levels of addition on Code Study Form and drawings Revise occupant load based on corrected building areas Provide listed assemblies for floor/beams/columns (2-hr) and wall (3-hr) Clarify if stair is an interior exit stair as seems to be indicated - if so, clarify how IBC 1023.2 requirements are being met - otherwise, show travel distance as and exit access stair Dimension handrail extensions on enlarged stair plans No walk-through review allowed
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1270719 |
Construction | Original | / | 12/20/2019 | DANM | DANM | In Current Review by DANM | | Construction | 1269475 |
Construction | Original | / | 12/20/2019 | | SCANNING | Location = Construction by SCANNING | | Construction | 1269431 |
Plan Coordinator | Original | / | 12/20/2019 | | AMY | Location = Plan Coordinator by AMY | | Plan Coordinator | 1269407 |
Enumeration | Original | N | 12/20/2019 | AMY | AMY | | | Enumeration | 1269406 |
Enumeration | Original | / | 12/20/2019 | AMY | AMY | In Current Review by AMY | | Enumeration | 1269401 |
Floodplain | Original | N | 12/20/2019 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5307003003) | | Floodplain | 1269383 |