Mechanical | Splice 11/17/22 | A | 12/6/2022 | DALEH | DALEH | clouds | | Mechanical | 1778558 |
Resubmittal 2 | Splice 11/17/22 | / | 12/5/2022 | SHELLEY | SHELLEY | Resubmittal #2 | | Resubmittal 2 | 1778300 |
Mechanical | Splice 11/17/22 | D | 11/28/2022 | DALEH | DALEH | The new splice sheet has the same engineers stamp date as the previous approved sheet dated 3/10/22 Engineer to provide the new stamp date when the revised plans occurred. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1775087 |
Mechanical | Splice 11/17/22 | / | 11/21/2022 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by Trever Kregg | TKregg0326 | Mechanical | 1773732 |
Resubmittal 1 | Splice 11/17/22 | / | 11/21/2022 | ANDREAL | ANDREAL | Resubmittal #1 | | Resubmittal 1 | 1773335 |
Mechanical | Splice 11/17/22 | D | 11/17/2022 | DALEH | DALEH | Engineers previous approved sheet was dated 3/10/22 This sheet has the Engineers stamp dated 11/22/21
Be specific with clouds only cloud changes that have occurred
All revisions to plans must be done by the Engineer of record
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1772408 |
Plumbing | Splice 11/17/22 | A | 11/17/2022 | SHANEN | SHANEN | Delta 8 revisions: Adjusted sheets P-100 and P-201. | | Plumbing | 1772354 |
Construction | Splice 11/17/22 | A | 11/17/2022 | SHELLEY | SHELLEY | Structural notes for mechanical support. | | Construction | 1772242 |
Mechanical | Splice 03/10/22 | A | 3/23/2022 | DALEH | DALEH | clouds | | Mechanical | 1654504 |
Construction | Splice 03/10/22 | A | 3/16/2022 | SHELLEY | SHELLEY | Revised wall types around future space and duct furring. | | Construction | 1651477 |
Resubmittal 1 | Splice 03/10/22 | / | 3/16/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #1 | | Resubmittal 1 | 1651301 |
Mechanical | Splice 03/10/22 | D | 3/14/2022 | DALEH | DALEH | Waiting on revised Construction Adjust Mechanical as needed (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1649141 |
Construction | Splice 03/10/22 | D | 3/11/2022 | SHELLEY | SHELLEY | Provide revised floor plan with revised wall types for added rated construction (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1648599 |
Mechanical | Splice 02/03/22 | A | 2/7/2022 | DALEH | DALEH | clouds | | Mechanical | 1632869 |
Electrical | Splice 02/03/22 | A | 2/4/2022 | SHELBY | SHELBY | | | Electrical | 1632752 |
Electronic Plan | Splice 02/03/22 | / | 2/4/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1632751 |
Construction | Splice 02/03/22 | A | 2/4/2022 | SHELLEY | SHELLEY | Minor floor plan revisions | | Construction | 1632594 |
Mechanical | Splice 12/07/21 | A | 12/29/2021 | DALEH | DALEH | clouds | | Mechanical | 1614408 |
Resubmittal 2 | Splice 12/07/21 | / | 12/29/2021 | AUSTINK | AUSTINK | Resubmittal #2 | | Resubmittal 2 | 1613968 |
Mechanical | Splice 12/07/21 | D | 12/28/2021 | DALEH | DALEH | Missing sheet M-301 (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1613375 |
Resubmittal 1 | Splice 12/07/21 | / | 12/28/2021 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1613143 |
Electrical | Splice 12/07/21 | A | 12/8/2021 | SHELBY | SHELBY | | | Electrical | 1605041 |
Mechanical | Splice 12/07/21 | D | 12/7/2021 | DALEH | DALEH | Backgrounds have changed and damper is now in the wrong location Previous approved drawing had M26 and this splice has no clouds eliminating it from scope See previous approved sheet dated 8/3/21 (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1604374 |
Construction | Splice 12/07/21 | A | 12/7/2021 | SHELLEY | SHELLEY | Revised RCP and restroom finish | | Construction | 1604239 |
Mechanical | Original | A | 8/3/2021 | DALEH | DALEH | | | Mechanical | 1540931 |
Resubmittal 2 | Original | / | 8/3/2021 | ANDREAL | ANDREAL | Resubmittal #2 | | Resubmittal 2 | 1540878 |
Electrical | Original | A | 7/23/2021 | SHELBY | SHELBY | | | Electrical | 1534973 |
Electronic Plan | Original | / | 7/19/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1532223 |
Plumbing | Original | A | 7/15/2021 | SHANEN | SHANEN | | | Plumbing | 1530881 |
Mechanical | Original | D | 7/15/2021 | DALEH | DALEH | Remove all duct work from drawing in the future finish the duct will be shown at the time a new plan comes through RBD for this new finished area. Indicate on drawings how all penetrations through rated walls will be protected. Show point of connection from existing to new work. Appears this area will not be a part of this plan submittal. Remove all new work from drawings that are not part of this plan submittal. Remove any schedules that are not part of this submittal. See plans Incomplete review until proper scope of work is indentified.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1530793 |
Construction | Original | A | 7/15/2021 | SHELLEY | SHELLEY | | | Construction | 1530739 |
Resubmittal 1 | Original | / | 7/14/2021 | SAVANNAHT | SAVANNAHT | Resubmittal #1 | | Resubmittal 1 | 1530649 |
CO Springs Hazmat | Original | A | 7/12/2021 | CSFIRE | CSFIRE | You are responsible for reviewing the comments found on the CSFD website for any corrections to be made and/or inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp NOTE: Plan review comments may take up to an hour to be uploaded (see full review) | DTillery94 | CO Springs Hazmat | 1529229 |
CO Springs Fire | Original | A | 7/7/2021 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! (see full review) | csfdit | CO Springs Fire | 1526958 |
Electrical | Original | D | 6/17/2021 | SHELBY | SHELBY | Electrical was not included in this submittal. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1518124 |
Electronic Plan | Original | / | 6/17/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1518111 |
Mechanical | Original | D | 6/17/2021 | DALEH | DALEH | Need wall types clarified prior to Mechanical review. Engineer to coordinate with Architect to determine wall types and protect all penetrations as required. Indicate code section on drawings if using exceptions to not protect penetrations of rated walls.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1517939 |
CO Springs DRE | Original | N | 6/15/2021 | ACOOPER | ACOOPER | Interior remodel, no change of use (see full review) | | CO Springs DRE | 1517107 |
CSU Waste Water | Original | N | 6/15/2021 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. CJS | cjsavage | CSU Waste Water | 1517020 |
CSU Water | Original | A | 6/15/2021 | CSUREVIEW | CSUREVIEW | Backflow okay. CJS | cjsavage | CSU Water | 1517019 |
Plumbing | Original | D | 6/15/2021 | SHANEN | SHANEN | Provide a piping materials schedule. Reference 2018 IPC as of 6/14/21. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1516938 |
Electronic Plan | Original | / | 6/15/2021 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 1516882 |
Construction | Original | D | 6/15/2021 | DANM | DANM | Life Safety Plan - clarify reason some walls are labeled as fire barriers vs. smoke barriers vs. smoke partitions Identify all new partitions with partition types from Sheet A-710 Show location of exit signs Door ratings not reviewed due to questions about wall types in which they are located
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1516867 |
Electronic Plan | Original | / | 6/15/2021 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1516480 |
Enumeration | Original | N | 6/14/2021 | BRENT | BRENT | | | Enumeration | 1516213 |
Electronic Plan | Original | / | 6/14/2021 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1516209 |
Floodplain | Original | N | 5/14/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6408423013) | | Floodplain | 1501256 |