Construction | Splice 05/17/22 | A | 5/19/2022 | LBENNETT | LBENNETT | Removed sink from AG234 | | Construction | 1684644 |
Electronic Plan | Splice 05/17/22 | / | 5/19/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1684610 |
Electrical | Splice 04/12/22 | A | 4/22/2022 | DANIELG | DANIELG | Delta revision 11. As built. | | Electrical | 1669938 |
Electronic Plan | Splice 04/12/22 | / | 4/22/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1669936 |
Resubmittal 1 | Splice 04/12/22 | / | 4/14/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #1 | | Resubmittal 1 | 1665115 |
Electrical | Splice 04/12/22 | D | 4/14/2022 | SHELBY | SHELBY | Please remove circled note that disallows these pages for approval. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1665010 |
Electronic Plan | Splice 04/12/22 | / | 4/12/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1663936 |
Mechanical | Splice 04/12/22 | A | 4/12/2022 | JUSTINC | JUSTINC | Duct layout and schedule revisions | | Mechanical | 1663841 |
Electronic Plan | Splice 04/12/22 | / | 4/12/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1663838 |
Construction | Splice 04/01/22 | A | 4/6/2022 | LBENNETT | LBENNETT | RCP changes | | Construction | 1661284 |
Electronic Plan | Splice 04/01/22 | / | 4/6/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1661283 |
Construction | Splice 03/28/22 | A | 3/31/2022 | LBENNETT | LBENNETT | Revised layout @ AG236 area | | Construction | 1658730 |
Electronic Plan | Splice 03/28/22 | / | 3/31/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1658682 |
Resubmittal 1 | Splice 03/28/22 | / | 3/31/2022 | ANDREAL | ANDREAL | Resubmittal #1 | | Resubmittal 1 | 1658610 |
Mechanical | Splice 03/28/22 | A | 3/29/2022 | JUSTINC | JUSTINC | Layout revisions | | Mechanical | 1657147 |
Construction | Splice 03/28/22 | D | 3/29/2022 | LBENNETT | LBENNETT | Order splice sheets in the same order as the original plan (index) A715: Please clarify revision number - there is already a delta 3 for this sheet Please remove equipment plan sheet from architectural plan
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1656980 |
Electronic Plan | Splice 03/28/22 | / | 3/29/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1656659 |
Construction | Splice 02/22/22 | A | 3/17/2022 | LBENNETT | LBENNETT | Updated walls types & new soffit in breakdown room | | Construction | 1651956 |
Electronic Plan | Splice 02/22/22 | / | 3/17/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1651952 |
Resubmittal 3 | Splice 02/22/22 | / | 3/17/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #3 | | Resubmittal 3 | 1651908 |
Construction | Splice 02/22/22 | D | 3/17/2022 | LBENNETT | LBENNETT | A101.P1: Please clarify soffit assembly and fascia assembly Missing sheet A715 00:30 (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1651828 |
Electronic Plan | Splice 02/22/22 | / | 3/17/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1651790 |
Resubmittal 2 | Splice 02/22/22 | / | 3/17/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #2 | | Resubmittal 2 | 1651710 |
Plumbing | Splice 02/22/22 | A | 3/2/2022 | SHANEN | SHANEN | Delta 7 revisions: Adjusted sheet P1.01, P1.02, P2.02, PD1.02 and PD2.02. | | Plumbing | 1643653 |
Electrical | Splice 02/22/22 | A | 3/1/2022 | SHELBY | SHELBY | Demolition as builts | | Electrical | 1643619 |
Construction | Splice 02/22/22 | D | 3/1/2022 | LBENNETT | LBENNETT | A101/A101.P1: Clarify wall types (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) 00:10 | | Construction | 1643580 |
Electronic Plan | Splice 02/22/22 | / | 3/1/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1643561 |
Resubmittal 1 | Splice 02/22/22 | / | 2/28/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #1 | | Resubmittal 1 | 1642436 |
Construction | Splice 02/22/22 | D | 2/22/2022 | LBENNETT | LBENNETT | A101/A101.P1: Clarify wall types AR101/AR101.P1: Submit sheets in the same alphanumeric order as the original plan; cloud all revisions (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) 00:55 | | Construction | 1639786 |
Electronic Plan | Splice 02/22/22 | / | 2/22/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1639636 |
Construction | Splice 02/16/22 | A | 2/17/2022 | LBENNETT | LBENNETT | Wall revisions between OR & lockers | | Construction | 1638575 |
Electronic Plan | Splice 02/16/22 | / | 2/17/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1638463 |
Resubmittal 1 | Splice 02/16/22 | / | 2/17/2022 | ANDREAL | ANDREAL | Resubmittal #1 | | Resubmittal 1 | 1638396 |
Construction | Splice 02/16/22 | D | 2/16/2022 | LBENNETT | LBENNETT | Put sheets in order and resubmit No review performed (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1638057 |
Electronic Plan | Splice 02/16/22 | / | 2/16/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1638054 |
Construction | Splice 01/25/22 | A | 1/27/2022 | LBENNETT | LBENNETT | Revised egress/circulation paths | | Construction | 1628226 |
Electronic Plan | Splice 01/25/22 | / | 1/27/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1628055 |
Resubmittal 1 | Splice 01/25/22 | / | 1/27/2022 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1628043 |
Construction | Splice 01/25/22 | D | 1/26/2022 | LBENNETT | LBENNETT | Please put sheets in order and resubmit (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1627756 |
Electronic Plan | Splice 01/25/22 | / | 1/26/2022 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1627474 |
Electrical | Original | A | 12/23/2021 | SHELBY | SHELBY | | | Electrical | 1612508 |
CO Springs Fire | Original | A | 12/9/2021 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! (see full review) | csfdit | CO Springs Fire | 1605599 |
Plumbing | Original | A | 11/30/2021 | SHANEN | SHANEN | Plumbing plans reviewed and released for phase 1 scope of work. | | Plumbing | 1600440 |
Electrical | Original | D | 11/29/2021 | SHELBY | SHELBY | Please address previous comment 3. ( Critical branch is part of the emergency system). (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1599849 |
Electronic Plan | Original | / | 11/29/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1599847 |
Mechanical | Original | A | 11/29/2021 | JUSTINC | JUSTINC | | | Mechanical | 1599392 |
Electronic Plan | Original | / | 11/29/2021 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1599198 |
Construction | Original | A | 11/24/2021 | SHELLEY | SHELLEY | | | Construction | 1599024 |
Resubmittal 4 | Original | / | 11/17/2021 | SAVANNAHT | SAVANNAHT | Resubmittal #4 | | Resubmittal 4 | 1595449 |
CO Springs Fire | Original | D | 10/26/2021 | CSFIRE | CSFIRE | Submitted By: Trimble, James Charles (see full review) | csfdit | CO Springs Fire | 1584736 |
Health Dept. | Original | N | 10/15/2021 | HEALTHDEPT | HEALTHDEPT | Not applicable. MT | mtemple | Health Dept. | 1579958 |
Electrical | Original | D | 10/15/2021 | SHELBY | SHELBY | 1. 30 Day metering for panel CE-HDB1 will not be possible ( Generator fed). 2. Please identify pre and post rooms as non patient bed location or patient bed location. 3. Emergency lighting is required in all patient care areas per 517.25 NEC. ( Emergency lights must function in the event that the branch circuit feeding them is interrupted;emergency system or normal).
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1579869 |
Plumbing | Original | D | 10/13/2021 | SHANEN | SHANEN | P4.01: SH-1 shower controls and hand shower location must comply with ICC A117.1-2009 section 608.4 Controls and hand showers. P2.01.P3: Stand pipe located in sink base cabinet does not comply with section 802.4 Waste receptors. Ready access shall be provided to waste receptors. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1578483 |
Mechanical | Original | D | 10/13/2021 | JUSTINC | JUSTINC | Mechanical review incomplete
Pending rated assembly comments from construction reviewer. Per PPRBD plan review requirements every penetration of ducts thru rated assemblies will be identified at the penetration with a tag note or damper indicated. This cannot be as indicated "TYPICAL"
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1578413 |
Electronic Plan | Original | / | 10/13/2021 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1578128 |
Electronic Plan | Original | / | 10/12/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1577870 |
Electronic Plan | Original | / | 10/12/2021 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 1577609 |
Construction | Original | D | 10/12/2021 | LBENNETT | LBENNETT | G001: Please provide missing door schedule sheets G521: Please provide a current listing LS100-LS100.P2: Please clarify exit access locations for each phase; clarify location of walls/smoke compartment per phase AP101: Please clarify extent of phase 2 AD101.P1: Please specify listed assembly to be used for the temporary smoke barrier during construction A101.P1: Please show wall type at door infill A102: Please clarify how smoke barrier will be maintained A710/A712-A714: Please clarify ANSI details
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1577566 |
Electronic Plan | Original | / | 10/8/2021 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1576075 |
Resubmittal 3 | Original | / | 10/6/2021 | SAVANNAHT | SAVANNAHT | Resubmittal #3 | | Resubmittal 3 | 1574830 |
Plan Coordinator | Original | D | 10/5/2021 | LBENNETT | LBENNETT | Disapprove all remaining departments to allow plan to be resubmitted (coordinated with SLE)
Please submit 1 plan containing all work for this remodel project. OK to address the phases within the plan, but the plan scope must reflect start to completion. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plan Coordinator | 1573644 |
Construction | Original | D | 10/5/2021 | LBENNETT | LBENNETT | Please submit 1 plan containing all work for this remodel project. OK to address the phases within the plan, but the plan scope must reflect start to completion.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1573641 |
Resubmittal 2 | Original | / | 10/5/2021 | SAVANNAHT | SAVANNAHT | Resubmittal #2 | | Resubmittal 2 | 1573557 |
Plan Coordinator | Original | D | 9/1/2021 | LBENNETT | LBENNETT | Disapprove all remaining departments to allow plan to be resubmitted (per James Blanchard)
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plan Coordinator | 1556801 |
Construction | Original | D | 9/1/2021 | LBENNETT | LBENNETT | LS100: Please show egress elements at the completion of phase 1 and a separate egress sheet showing egress during construction (both should be stamped by the DP and part of the architectural submittal)
Revisions to sheets G521/A502/A713/A714 + CSF + code data noted
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1556800 |
Electronic Plan | Original | / | 9/1/2021 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1556618 |
Resubmittal 1 | Original | / | 9/1/2021 | SAVANNAHT | SAVANNAHT | Resubmittal #1 | | Resubmittal 1 | 1556193 |
CO Springs Hazmat | Original | A | 8/24/2021 | CSFIRE | CSFIRE | You are responsible for reviewing the comments found on the CSFD website for any corrections to be made and/or inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp NOTE: Plan review comments may take up to an hour to be uploaded (see full review) | DTillery94 | CO Springs Hazmat | 1551870 |
CO Springs Fire | Original | D | 8/23/2021 | CSFIRE | CSFIRE | https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp | rpeterson | CO Springs Fire | 1551055 |
Mechanical | Original | D | 8/10/2021 | JUSTINC | JUSTINC | MECHANICAL REVIEW INCOMPLETE
The scope of work is not clear. Provide a overall view of the completed floor plan with mechanical scope for wall rating verification. Clarify how every penetration will be protected show dampers, or provide sheet note indicating code section and exception, provide tag at each penetration. Verify only work associated with this permit phase is indicated.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1544651 |
Electronic Plan | Original | / | 8/10/2021 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1544601 |
Electrical | Original | D | 8/5/2021 | SHELBY | SHELBY | Please include only information for this phase (Phase 1). (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1542806 |
Electronic Plan | Original | / | 8/5/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1542799 |
Electronic Plan | Original | / | 8/5/2021 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 1542268 |
Plumbing | Original | D | 8/5/2021 | SHANEN | SHANEN | Pending completed construction review. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1542164 |
CO Springs DRE | Original | N | 8/3/2021 | PDOSCH | PDOSCH | Interior remodel only: No change in footprint, No change to exterior, No change in parking, No change in occupancy (see full review) | | CO Springs DRE | 1541295 |
Zoning/Planning | Original | / | 8/3/2021 | PDOSCH | PDOSCH | In Current Review by PDOSCH | | Zoning/Planning | 1541293 |
CSU Waste Water | Original | N | 8/3/2021 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. DMM | dmakings | CSU Waste Water | 1541250 |
CSU Water | Original | A | 8/3/2021 | CSUREVIEW | CSUREVIEW | Backflow okay. DMM | dmakings | CSU Water | 1541246 |
Construction | Original | D | 8/3/2021 | LBENNETT | LBENNETT | Please clarify scope for this submittal. Remove sheets not applicable to this phase. Title/G001.P1/AS101/FF-100/FF-101: Missing DP stamp G521/a502: Please provide current listings for each assembly; provide assembly UL I503; provide intumescent spray listing LS100: Missing code data AD101.P1/A101.P1: Please clarify how corridors will be maintained/created during phase 1 A100/A101: Please clarify – does this depict completion of phase 1 or completion of the project or other? A713/A714: Please provide accessibility details as noted CSF: Please update to match code data on architectural plan
Please see plans for all comments
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1541234 |
Electronic Plan | Original | / | 7/26/2021 | LBENNETT | LBENNETT | In Current Review by LBENNETT | | Electronic Plan | 1535850 |
Enumeration | Original | N | 7/21/2021 | AMY | AMY | The Code Study form was submitted under the incorrect address. Address changed to 4050 Briargate Pkwy. The Tax Schedule number in the Code study form is also incorrect. This number can be found on the El Paso County Assessor’s database. This has been corrected for you as well. If these sheets get changed out correct this information. | | Enumeration | 1533597 |
Electronic Plan | Original | / | 7/21/2021 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1533579 |
Floodplain | Original | N | 7/16/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6235212001) | | Floodplain | 1531678 |