Mechanical | Splice 02/03/22 | A | 2/4/2022 | DALEH | DALEH | Cloud | | Mechanical | 1632282 |
Construction | Splice 02/01/22 | A | 2/1/2022 | BPHILLIPS | BPHILLIPS | Provided detail for rated wall @ mullion. | | Construction | 1630710 |
Electronic Plan | Splice 02/01/22 | / | 2/1/2022 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1630707 |
Plan Coordinator | Splice 01/31/22 | / | 1/31/2022 | | DANIELG | Location = Plan Coordinator by DANIELG | | Plan Coordinator | 1629849 |
Electrical | Splice 01/31/22 | A | 1/31/2022 | DANIELG | DANIELG | Revised panel schedule R1F and R1F-1. | | Electrical | 1629848 |
Construction | Splice 01/21/22 | A | 1/21/2022 | BPHILLIPS | BPHILLIPS | Revised wall assembly detail. | | Construction | 1624758 |
Electronic Plan | Splice 01/21/22 | / | 1/21/2022 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1624737 |
Mechanical | Splice 01/11/22 | A | 1/14/2022 | DALEH | DALEH | clouds | | Mechanical | 1621872 |
Construction | Splice 01/11/22 | A | 1/14/2022 | BPHILLIPS | BPHILLIPS | Provided listed wall and ceiling assemblies for hall alcove, revised break room layout. | | Construction | 1621795 |
Electronic Plan | Splice 01/11/22 | / | 1/14/2022 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1621794 |
Mechanical | Splice 01/11/22 | D | 1/14/2022 | DALEH | DALEH | Waiting for Construction comments to get addressed
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1621761 |
Plumbing | Splice 01/11/22 | A | 1/14/2022 | SHANEN | SHANEN | Delta 4 revisions: Adjusted sheet P100. | | Plumbing | 1621650 |
Construction | Splice 01/11/22 | D | 1/14/2022 | BPHILLIPS | BPHILLIPS | Please clarify why rating wall and ceiling assemblies. If other than IBC, state so on plan. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1621620 |
Electronic Plan | Splice 01/11/22 | / | 1/12/2022 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1620103 |
Mechanical | Splice 12/13/21 - Mechanical | A | 12/17/2021 | DALEH | DALEH | splice | | Mechanical | 1609704 |
Resubmittal 1 | Splice 12/13/21 - Mechanical | / | 12/16/2021 | ANDREAL | ANDREAL | Resubmittal #1 | | Resubmittal 1 | 1609481 |
Electrical | Splice 12/13/21 - Electrical | A | 12/15/2021 | SHELBY | SHELBY | Remove crac unit | | Electrical | 1608660 |
Electronic Plan | Splice 12/13/21 - Electrical | / | 12/15/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1608659 |
Mechanical | Splice 12/13/21 - Mechanical | D | 12/13/2021 | DALEH | DALEH | Why clouding OSA schedule and VAV schedule ? there are no changes from previous approval (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1606733 |
Plumbing | Splice 12/13/21 - Plumbing | A | 12/13/2021 | SHANEN | SHANEN | Delta 3 revisions: Adjusted sheet P100. | | Plumbing | 1606684 |
Construction | Splice 12/13/21 | A | 12/13/2021 | BPHILLIPS | BPHILLIPS | Title block and minor labeling revisions. | | Construction | 1606665 |
Electronic Plan | Splice 12/13/21 | / | 12/13/2021 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1606658 |
Mechanical | Original | A | 10/5/2021 | DALEH | DALEH | | | Mechanical | 1573992 |
Resubmittal 2 | Original | / | 10/5/2021 | ANDREAL | ANDREAL | Resubmittal #2 | | Resubmittal 2 | 1573899 |
CSU Contract Admin. | Original | A | 9/24/2021 | CSUAPPSPRM | CSUAPPSPRM | Commercial water meter sizing form approved no fees to be paid.
VLC | VCornwell | CSU Contract Admin. | 1568598 |
Mechanical | Original | D | 9/24/2021 | DALEH | DALEH | Demo sheet did not make the trip in this upload Provide previous demo sheet Upload should consist of 3 sheets (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1568495 |
Resubmittal 1 | Original | / | 9/24/2021 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1568281 |
CO Springs Hazmat | Original | N | 9/17/2021 | CSFIRE | CSFIRE | | jt09ff | CO Springs Hazmat | 1563815 |
CO Springs Fire | Original | A | 9/17/2021 | CSFIRE | CSFIRE | Submitted By: Trimble, James Charles (see full review) | csfdit | CO Springs Fire | 1563813 |
CSU Contract Admin. | Original | D | 8/30/2021 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form for entire building consisting of all domestic/irrigation demand. Payment of applicable development fees/charges may apply. Please contact our office at 719-668-8111 for additional information and to request an estimate. AG
CWMSF available online at: https://www.csu.org/CSUDocuments/commercialwatermetersizingform.pdf | aguerin | CSU Contract Admin. | 1555194 |
City Engr | Original | N | 8/27/2021 | JDAGNILLO | JDAGNILLO | | | City Engr | 1554246 |
CO Springs DRE | Original | A | 8/24/2021 | AODOM | AODOM | interior finish for new office suite in existing office building, no exterior work | | CO Springs DRE | 1551774 |
Health Dept. | Original | N | 8/20/2021 | HEALTHDEPT | HEALTHDEPT | Not applicable. AB | abrannon | Health Dept. | 1550517 |
Plumbing | Original | A | 8/20/2021 | SHANEN | SHANEN | | | Plumbing | 1550472 |
Electrical | Original | A | 8/19/2021 | SHELBY | SHELBY | | | Electrical | 1550013 |
Electronic Plan | Original | / | 8/19/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1549999 |
Mechanical | Original | D | 8/19/2021 | DALEH | DALEH | Provide refrigeration calcs for crac unit Crac unit schedule indicates O.S.A. ? (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1549920 |
CSU Water | Original | A | 8/19/2021 | CSUREVIEW | CSUREVIEW | Backflow okay. CJS | cjsavage | CSU Water | 1549752 |
CSU Waste Water | Original | N | 8/19/2021 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. CJS | cjsavage | CSU Waste Water | 1549751 |
Gas/Elec. Utils | Original | N | 8/19/2021 | CSUREVIEW | CSUREVIEW | No apparent conflicts. CJS | cjsavage | Gas/Elec. Utils | 1549750 |
Zoning/Planning | Original | / | 8/19/2021 | AODOM | AODOM | In Current Review by AODOM | | Zoning/Planning | 1549703 |
Construction | Original | A | 8/19/2021 | BPHILLIPS | BPHILLIPS | Approved as noted. | | Construction | 1549692 |
Electronic Plan | Original | / | 8/19/2021 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1549458 |
Elevators | Original | N | 8/13/2021 | SAVANNAHT | SAVANNAHT | N/A | | Elevators | 1546757 |
Enumeration | Original | A | 8/12/2021 | BECKYA | BECKYA | Approved as noted. Enumerations changed all pages to show correct suite number for this scope of work (Suite 101). Proposed suite numbers where changed on the secondary addressing, this side of the building should have odd suite numbers with a jump in numbers to allow for future suites if needed.
If plans with Enumeration notations are switched out, please copy all added notations to revised plan prior to resubmittal; see plans. | | Enumeration | 1546125 |
Electronic Plan | Original | / | 8/12/2021 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1546041 |
Floodplain | Original | N | 8/10/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6318302008) | | Floodplain | 1544511 |