Required Departments: 4
|
|
|
Log Entries: 13
|
|
Mechanical | Original | A | 8/31/2006 | RUSSELL | RUSSELL | | | Mechanical | 2821 | Electrical | Original | A | 8/29/2006 | JERRY | JERRY | | | Electrical | 2818 | Mechanical | Original | D | 8/28/2006 | RUSSELL | RUSSELL | Missing one red-lined sheet to review against revised sheet (M3.11A), rest okay | | Mechanical | 2823 | Mechanical | Original | / | 8/23/2006 | RUSSELL | RUSSELL | Plans need to assembled into sets prior to re-review, | | Mechanical | 2820 | Construction | Original | A | 8/14/2006 | TIMC | TIMC | | | Construction | 2815 | Out to Review | Original | A | 7/7/2006 | JEREMY | JEREMY | Rob Fries 282-1981 | | Out to Review | 2824 | Plumbing | Original | A | 6/2/2006 | KYE | KYE | | | Plumbing | 2826 | Plumbing | Original | / | 6/1/2006 | KYE | KYE | | | Plumbing | 2825 | Mechanical | Original | D | 5/30/2006 | RUSSELL | RUSSELL | See plans for comments | | Mechanical | 2822 | Electrical | Original | D | 5/24/2006 | JERRY | JERRY | PANEL SCHEDULES AND LOAD CALCULATIONS | | Electrical | 2819 | Electrical | Original | A | 5/22/2006 | JERRY | JERRY | JERRY | | Electrical | 2817 | Construction | Original | D | 5/16/2006 | SEAN | SEAN | Provide additional site plan to show egress of NE stairway to a public way. FYI: Stair 1B is being treated as a shaft instead of an exit enclosure because it is not a required exit. This stair would need an exit passageway to the exterior to be treated as a required exit stairway in the future. | | Construction | 2816 | Construction | Original | / | 5/10/2006 | SEAN | SEAN | In Sean's office for review. | | Construction | 2814 |
|
| |
|