Construction | Splice 02/28/23 | A | 3/21/2023 | DANM | DANM | Added another Party Room to floor plan | | Construction | 1818866 |
Electronic Plan | Splice 02/28/23 | / | 3/21/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1818861 |
Resubmittal 2 | Splice 02/28/23 | / | 3/21/2023 | DANM | DANM | Resubmittal #2 | | Resubmittal 2 | 1818860 |
Plumbing | Splice 02/28/23 | A | 3/16/2023 | SHANEN | SHANEN | Delta 4 revisions: Adjusted sheet P1.00, P1.00A, P2.00 and P2.00A. | | Plumbing | 1817112 |
Construction | Splice 02/28/23 | D | 3/16/2023 | DANM | DANM | Sheet A01 is missing from the resubmittal of the splice = please include G04, A01 and A02
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1817088 |
Electronic Plan | Splice 02/28/23 | / | 3/16/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1816970 |
Resubmittal 1 | Splice 02/28/23 | / | 3/15/2023 | SIERRAC | SIERRAC | Resubmittal #1 | | Resubmittal 1 | 1816132 |
CO Springs Fire | Splice 02/28/23 | A | 3/1/2023 | CSFIRE | CSFIRE | Submitted By: Valdez, Phil You are responsible for reviewing the comments found on the CSFD website for any corrections to be made and/or inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp NOTE: Plan review comments may take up to an hour to be uploaded (see full review) | phil.valdez | CO Springs Fire | 1808964 |
Plumbing | Splice 02/28/23 | D | 3/1/2023 | SHANEN | SHANEN | All backgrounds must match. Provide revised architectural plans to show the relocated lavatory in the family restroom. P2.00, P2.00A: Adjust water supply fixture count for an 1-1/2" water entry. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1808549 |
Construction | Splice 02/28/23 | A | 2/28/2023 | DANM | DANM | Party Room added with 16 additional occupants. This does not affect the egress capacity of the space and the plumbing fixture occupant load count is capped at 910, so that is not affected either. | | Construction | 1808416 |
Electronic Plan | Splice 02/28/23 | / | 2/28/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1808275 |
Electrical | Splice 02/21/23 | A | 2/22/2023 | DANIELG | DANIELG | | | Electrical | 1805367 |
Electronic Plan | Splice 02/21/23 | / | 2/22/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1805353 |
Mechanical | Splice 02/21/23 | A | 2/21/2023 | DALEH | DALEH | Clouds | | Mechanical | 1805280 |
CSU Water | Splice 02/17/23 | N | 2/21/2023 | CSUREVIEW | CSUREVIEW | No apparent conflicts. CJS | cjsavage | CSU Water | 1805178 |
CSU Water | Splice 02/17/23 | / | 2/21/2023 | CSUREVIEW | CSUREVIEW | | cjsavage | CSU Water | 1805166 |
CSU Water | Splice 02/17/23 | D | 2/17/2023 | CSUREVIEW | CSUREVIEW | Requires CSU-approved Utility Service Plan (USP) attached to the plan set as it appears the domestic service is separating out from existin domestic/fire service line. Call UDS at 719-668-8259 with questions. SSM | stefanm | CSU Water | 1804408 |
Plumbing | Splice 02/17/23 | A | 2/17/2023 | SHANEN | SHANEN | Delta 2 revisions: Adjusted sheet P1.00, P1.00A, P2.00 and P2.00A. | | Plumbing | 1804231 |
Mechanical | Splice 02/14/23 | A | 2/15/2023 | DALEH | DALEH | Backgrounds match original architectural sheets Clouds | | Mechanical | 1803331 |
Mechanical | Splice 02/14/23 | D | 2/15/2023 | DALEH | DALEH | Not all previous disapproved comments have been addressed PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1803224 |
Resubmittal 1 | Splice 02/14/23 | / | 2/15/2023 | KALLISTAJ | KALLISTAJ | Resubmittal #1 | | Resubmittal 1 | 1803073 |
Mechanical | Splice 02/14/23 | D | 2/14/2023 | DALEH | DALEH | Remove old clouds from new splice sheets only cloud current revisions Backgrounds do not match previous approved sheet dated 4/21/22 This is the only Mechanical splice submitted to this project all changes must be done from previous approved sheet dated 4/21/22 What happened to previous approved ducts to this area ? not clouded showing removed Sheet dated and approved on 4/21/22 only had delta 1 this splice sheet is up to delta 9 and no previous splices have been submitted
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1802651 |
Construction | Splice 01/20/23 | A | 1/23/2023 | DANM | DANM | There is an existing free standing sign that was originally reviewed and permitted by zoning as a wall sign. THis splice is to add engineer structure to the existing sign to further stabilize it. | | Construction | 1793865 |
Electronic Plan | Splice 01/20/23 | / | 1/23/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1793834 |
Electrical | Splice 11/21/22 | A | 11/21/2022 | DANIELG | DANIELG | Revised one-line and panel schedules. | | Electrical | 1773360 |
Electronic Plan | Splice 11/21/22 | / | 11/21/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1773337 |
CO Springs Fire | Original | A | 6/15/2022 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION!
***PER FIRE PROTECTION ENGINEER II TAYLOR WYMAN (CHIP) - ADDRESSAL OF COMMENT IN RELATION TO IFC 15 ED SECTION 807.5.1 SHALL BE A DIFFERED SUBMITTAL. IT SHALL BE UNDERSTOOD THAT NO CONSTRUCTION INSPECTIONS WILL BE PROVIDED TO THIS PROJECT UNTIL COMMENT IS SUFFICENTLY ADDRESSED.*** (see full review) | csfdit | CO Springs Fire | 1698845 |
Resubmittal 7 | Original | / | 6/10/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #7 | | Resubmittal 7 | 1696800 |
CO Springs Fire | Original | D | 6/10/2022 | CSFIRE | CSFIRE | WALK OK – See our “Virtual” Walk Through process here: https://coloradosprings.gov/sites/default/files/inline-images/walk-thru_memo.pdf
You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1696477 |
Resubmittal 6 | Original | / | 5/31/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #6 | | Resubmittal 6 | 1690055 |
CO Springs Fire | Original | D | 5/26/2022 | CSFIRE | CSFIRE | Submitted By: Watson, Jacob Thomas
You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1688800 |
Electrical | Original | A | 5/20/2022 | DANIELG | DANIELG | | | Electrical | 1685401 |
Electronic Plan | Original | / | 5/20/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1685387 |
Plumbing | Original | A | 5/20/2022 | SHANEN | SHANEN | | | Plumbing | 1685306 |
Construction | Original | A | 5/19/2022 | DANM | DANM | | | Construction | 1685254 |
Electronic Plan | Original | / | 5/19/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1684660 |
Resubmittal 5 | Original | / | 5/18/2022 | ANDREAL | ANDREAL | Resubmittal #5 | | Resubmittal 5 | 1684238 |
CO Springs Fire | Original | D | 5/3/2022 | CSFIRE | CSFIRE | Submitted By: Watson, Jacob Thomas
You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1675433 |
Electrical | Original | D | 4/22/2022 | DANIELG | DANIELG | 1. Show MCB and GEC at the MDP.
2. Provide 2015 IECC calculation.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1670106 |
Electronic Plan | Original | / | 4/22/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1670074 |
Plumbing | Original | D | 4/21/2022 | SHANEN | SHANEN | P0.01: Schedule drinking fountain (WF?). Schedule kitchen plumbing fixtures (three comp.sink, prep sink, hand sink, etc.). P1.00A: Tag scheduled fixtures on the plumbing plans. P0.02: Kitchen sink riser diagram fixture labeled as EWC, clarify. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1669106 |
Mechanical | Original | A | 4/21/2022 | DALEH | DALEH | See Inspector alert | | Mechanical | 1669054 |
Construction | Original | D | 4/20/2022 | DANM | DANM | Additional disapproval comments: Cannot find partition type P-01 on floor plan - if not being used in project then remove from Sheet G02. Clarify if partition type P-02 is a fire barrier or a fire partition - clarify reason for rating.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1668674 |
CSU Water | Original | N | 4/20/2022 | CSUREVIEW | CSUREVIEW | No new water service outside of building. mjg | mgackle | CSU Water | 1668299 |
CSU Waste Water | Original | A | 4/20/2022 | CSUREVIEW | CSUREVIEW | Comments addressed. Variance for an Indoor Grease Trap. mjg | mgackle | CSU Waste Water | 1668296 |
Construction | Original | D | 4/20/2022 | DANM | DANM | All G Sheets are missing from submittal. Full engineering must be provided for all platforms and associated stairs and ramps. This includes framing plans, sections, details and all attachments - provide engineer stamped/signed manufacturer's shop drawings as necessary to fulfill this requirement.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1668108 |
Electronic Plan | Original | / | 4/19/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1667532 |
Resubmittal 4 | Original | / | 4/18/2022 | JAY | JAY | Resubmittal #4 | | Resubmittal 4 | 1667167 |
CO Springs Hazmat | Original | A | 4/18/2022 | CSFIRE | CSFIRE | Submitted by: Tillery, Demarcus
You are responsible for reviewing the APPROVAL comments found on the CSFD website for any corrections to be made and/or inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp NOTE: Plan review comments may take up to an hour to be uploaded (see full review) | DTillery94 | CO Springs Hazmat | 1666926 |
CO Springs Hazmat | Original | / | 4/18/2022 | CSFIRE | CSFIRE | | DTillery94 | CO Springs Hazmat | 1666920 |
Health Dept. | Original | A | 4/11/2022 | HEALTHDEPT | HEALTHDEPT | Approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. AB | abrannon | Health Dept. | 1663203 |
CO Springs Hazmat | Original | D | 2/18/2022 | CSFIRE | CSFIRE | | jt09ff | CO Springs Hazmat | 1638951 |
CO Springs Fire | Original | D | 2/18/2022 | CSFIRE | CSFIRE | Submitted by James Trimble: You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1638949 |
Electrical | Original | D | 2/3/2022 | SHELBY | SHELBY | 1. Show GEC size on one line. 2. Show feeder and MCB over current device size on one line. 3. Show SCA and SCCR at/for new cooling and refrigeration equipment. 4. Show AIC of all electrical panels. See https://www.pprbd.org/File/Resources/Downloads/CommercialHandout/Com%20Elect%20reqs%202020%20NEC.pdf (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1632038 |
Electronic Plan | Original | / | 2/3/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1631979 |
Health Dept. | Original | D | 1/27/2022 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/service/retail-food-establishment-licensing-0. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. MT | mtemple | Health Dept. | 1628612 |
Mechanical | Original | D | 1/27/2022 | DALEH | DALEH | Indicate the extent of what will be done in the Kitchen,,, cooking, type 1 or 2 hoods, exhaust, freezers/coolers, dishwasher etc...... See plans about ventilation schedule See plans
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1628156 |
CO Springs DRE | Original | A | 1/26/2022 | DFOXX | DFOXX | Indoor recreation use (Urban Air) permitted within PBC zone district. (see full review) | | CO Springs DRE | 1627033 |
Zoning/Planning | Original | / | 1/25/2022 | DFOXX | DFOXX | In Current Review by DFOXX | | Zoning/Planning | 1626885 |
Plumbing | Original | D | 1/25/2022 | SHANEN | SHANEN | All fixtures must be listed/scheduled with manufacturer's model numbers per PPRBD commercial plumbing plan review requirements. Provide required water pipe size analysis data, see 2018 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. P2.02: 1"CW to each water closet flush valve per sheet P2.00A. P1.00A: Show vent piping and which vents are through the roof. Provide required CSU variance letter for the indoor grease interceptor, contact Robert Bowren at 719-668-1735 or fog@csu.org for more information. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1626780 |
CSU Waste Water | Original | D | 1/25/2022 | CSUREVIEW | CSUREVIEW | Need approved utility plan from Colorado Springs Utilities Development Services in the RBD plan set AJ | ajuvera | CSU Waste Water | 1626778 |
CSU Water | Original | D | 1/25/2022 | CSUREVIEW | CSUREVIEW | Need approved utility plan from Colorado Springs Utilities Development Services in the RBD plan set AJ | ajuvera | CSU Water | 1626776 |
Construction | Original | D | 1/25/2022 | DANM | DANM | Clarify if some type of smoke control system will be installed in this project - if not, then remove IBC Table 1029.6.2 from Sheet G01B. Clarify location of rated walls - if none exist in scope of work then remove listing from partition types. Show that separation of exits requirements are being met for any two party rooms when the overhead door is open between them. Indicate partition types for all walls on enlarged floor plans. Provide structural engineering for raised platform areas.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1626612 |
Electronic Plan | Original | / | 1/25/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1626408 |
Resubmittal 3 | Original | / | 1/18/2022 | AUSTINK | AUSTINK | Resubmittal #3 | | Resubmittal 3 | 1622144 |
Plan Coordinator | Original | D | 1/12/2022 | DANM | DANM | Electronic plan disapproved so revised drawings and Code Study Form can be submitted with calculations proving allowable area.
Disapprove all remaining departments to allow plan to be resubmitted (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plan Coordinator | 1620685 |
Electronic Plan | Original | / | 1/12/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1620680 |
Resubmittal 2 | Original | / | 1/11/2022 | AUSTINK | AUSTINK | Resubmittal #2 | | Resubmittal 2 | 1619395 |
Plan Coordinator | Original | D | 1/10/2022 | DANM | DANM | REVIEW STOPPED
Changing Construction Type to II-A does not seem code compliant since the original building permit drawings appear to show combustible construction (wood) in parts of the building and the structure does not appear to protected with fire-resistance-rated construction as would be required. Building still has not been proven to work with the Change of Occupancy.
Disapprove all remaining departments to allow plan to be resubmitted (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plan Coordinator | 1618805 |
Electronic Plan | Original | / | 1/5/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1617104 |
Resubmittal 1 | Original | / | 1/3/2022 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1615562 |
Plan Coordinator | Original | D | 12/3/2021 | DANM | DANM | REVIEW STOPPED It has not been proven that the Change of Occupancy is code compliant - existing building area is larger than allowable building area
Disapprove all remaining departments to allow plan to be resubmitted | | Plan Coordinator | 1602599 |
Construction | Original | D | 12/3/2021 | DANM | DANM | Provide stamp and signature of Colorado licensed design professional on Code Study Form. Allowable area incorrectly calculated - use Equation 5-1 in IBC 506.2.1.
REVIEW STOPPED It has not been proven that the Change of Occupancy is code compliant - existing building area is larger than allowable building area
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1602598 |
Electronic Plan | Original | / | 12/3/2021 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1602490 |
Enumeration | Original | N | 12/3/2021 | BECKYA | BECKYA | Enumerations added a site plan showing all addresses on the building, If this page is switched out, please provide a site plan showing the separation of spaces. | | Enumeration | 1602476 |
Electronic Plan | Original | / | 12/3/2021 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1602412 |
Floodplain | Original | N | 11/18/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6305404014) | | Floodplain | 1596221 |