Required Departments: 3
|
|
|
Log Entries: 7
|
|
Electrical | Original | A | 7/18/2022 | DANIELG | DANIELG | | | Electrical | 1715222 | Electronic Plan | Original | / | 7/18/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1715220 | Submittal 2 | Original | / | 7/18/2022 | ANDREAL | ANDREAL | Submittal #2 | | Submittal 2 | 1714826 | Electrical | Original | D | 7/12/2022 | DANIELG | DANIELG | 1. List conductors between elevator controller and transformer.
2. Show size of transformer and secondary OCPD on the one-line.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1712068 | Electronic Plan | Original | / | 7/12/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1712061 | Elevators | Original | A | 7/12/2022 | ERIC | ERIC | Modernization of elevators 12 and 13 ASME A17.1-2019 | | Elevators | 1711918 | Floodplain | Original | N | 7/11/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6406108027) | | Floodplain | 1711013 |
|
| |
|