CO Springs Fire | Original | D | 4/8/2024 | CSFIRE | CSFIRE | | rpeterson | CO Springs Fire | 1985270 |
CO Springs DRE | Original | D | 3/27/2024 | MOBRIEN | MOBRIEN | 1. Please upload recorded and approved final plat. 2. Per conditions of Land Use Review approval, a final landscape and irrigation plan application submittal is due at building permit. 3. Park and school fees have not yet been paid. Please contact Charla.Hudspeth@coloradosprings.gov to pay fees. (see full review) | | CO Springs DRE | 1980399 |
Mechanical | Original | A | 3/27/2024 | DALEH | DALEH | | | Mechanical | 1980075 |
Health Dept. | Original | D | 3/26/2024 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. TG | tguerrero | Health Dept. | 1979829 |
City Engr | Original | D | 3/26/2024 | PMORRIS | PMORRIS | Same comment: Upload a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (water quality facility) construction plan into the building permit. (GEC: STM-REV23-0024, PCM STM-REV23-0901) | | City Engr | 1979177 |
Plumbing | Original | D | 3/25/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1978996 |
Electrical | Original | D | 3/25/2024 | DANIELG | DANIELG | Pending elevator approval.
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1978914 |
Electronic Plan | Original | / | 3/25/2024 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 1978881 |
Electronic Plan | Original | / | 3/25/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1978861 |
Elevators | Original | D | 3/25/2024 | ERIC | ERIC | Basis of design, TKE conventional hydraulic elevator, full set of for construction submittals are required to be spliced into plan set prior to the issuance of the elevator permit.
See page E100B . 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Elevators | 1978838 |
CSU Water | Original | D | 3/25/2024 | CSUREVIEW | CSUREVIEW | Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. CSU-approved Construction Drawings must be attached to the permit set. Utility construction drawings must be submitted for CSU review and approval at https://cuc.csu.org/en-US/ Contact Utilities Development Services at 719-668-8259 with any questions. CJS | cjsavage | CSU Water | 1978772 |
CSU Waste Water | Original | D | 3/25/2024 | CSUREVIEW | CSUREVIEW | CSU-approved Construction Drawings must be attached to the permit set. Utility construction drawings must be submitted for CSU review and approval at https://cuc.csu.org/en-US/ Contact Utilities Development Services at 719-668-8259 with any questions. CJS | cjsavage | CSU Waste Water | 1978771 |
Gas/Elec. Utils | Original | A | 3/25/2024 | CSUREVIEW | CSUREVIEW | Approved development plan provided with permit set. CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. CJS | cjsavage | Gas/Elec. Utils | 1978769 |
CSU Contract Admin. | Original | D | 3/25/2024 | CSUAPPSPRM | CSUAPPSPRM | Same comment as previously noted:
Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CZ | c.zani | CSU Contract Admin. | 1978704 |
Zoning/Planning | Original | / | 3/25/2024 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 1978696 |
Construction | Original | D | 3/25/2024 | JUSTINL | JUSTINL | Sheet A4.11 - Type B option A requires each fixtures provided comply. Water closet does not have required clearances per 1004.11.3.1.2 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1978678 |
Electronic Plan | Original | / | 3/25/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1978530 |
Enumeration | Original | A | 3/22/2024 | BECKYA | BECKYA | | | Enumeration | 1978131 |
Submittal 4 | Original | / | 3/22/2024 | BRIANNAM | BRIANNAM | Submittal #4 | | Submittal 4 | 1978054 |
CO Springs Fire | Original | D | 11/14/2023 | CSFIRE | CSFIRE | We regret to inform you this plan is disapproved. You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account.
WALK OK – See our “Virtual” Walk Through process here: https://coloradosprings.gov/fire-department/page/plan-and-construction-review-status | dwithee | CO Springs Fire | 1928317 |
Health Dept. | Original | D | 11/8/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1925240 |
CO Springs DRE | Original | D | 11/7/2023 | DFOXX | DFOXX | Please provide APPROVED development plan entitlement. No approval stamp from City Planning is located on submitted DP. (see full review) | | CO Springs DRE | 1924634 |
Plumbing | Original | D | 11/7/2023 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1924039 |
City Engr | Original | D | 11/6/2023 | JDAGNILLO | JDAGNILLO | See previous comemnt - Include a copy of the approved Development Plan and a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. (STM-REV23-0901) | | City Engr | 1923821 |
Electrical | Original | D | 11/6/2023 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1923347 |
Electronic Plan | Original | / | 11/6/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1923322 |
Mechanical | Original | D | 11/6/2023 | JUSTINC | JUSTINC | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1923248 |
CSU Contract Admin. | Original | D | 11/3/2023 | CSUAPPSPRM | CSUAPPSPRM | Same comment as previously noted:
Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CZ | c.zani | CSU Contract Admin. | 1923054 |
CSU Water | Original | D | 11/3/2023 | CSUREVIEW | CSUREVIEW | See previous comments. mjg | mgackle | CSU Water | 1923045 |
CSU Waste Water | Original | D | 11/3/2023 | CSUREVIEW | CSUREVIEW | See previous comments. mjg | mgackle | CSU Waste Water | 1923042 |
Gas/Elec. Utils | Original | D | 11/3/2023 | CSUREVIEW | CSUREVIEW | See previous comments. mjg | mgackle | Gas/Elec. Utils | 1923041 |
Construction | Original | D | 11/3/2023 | JUSTINL | JUSTINL | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1923021 |
Electronic Plan | Original | / | 10/30/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1920108 |
Elevators | Original | D | 10/27/2023 | ERIC | ERIC | Provide elevator submittals or preliminary drawings. . . 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Elevators | 1919989 |
Enumeration | Original | A | 10/27/2023 | BECKYA | BECKYA | | | Enumeration | 1919817 |
Electronic Plan | Original | / | 10/27/2023 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1919785 |
Submittal 3 | Original | / | 10/27/2023 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 1919684 |
CO Springs Hazmat | Original | N | 12/9/2022 | CSFIRE | CSFIRE | | rpeterson | CO Springs Hazmat | 1780723 |
CO Springs Fire | Original | D | 12/9/2022 | CSFIRE | CSFIRE | You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | rpeterson | CO Springs Fire | 1780722 |
CO Springs DRE | Original | D | 12/9/2022 | ESHAFER | ESHAFER | Approved Development Plan (with Land Use Review approval stamp present) must be uploaded along with the recorded plat. (see full review) | | CO Springs DRE | 1780409 |
Electrical | Original | D | 12/7/2022 | DANIELG | DANIELG | 1. Show all feeder OCPD's on the one-line.
2. Where is distribution switchboard "DPMB"?
3. Provide the SCA and SCCR for all new air conditioning and refrigeration equipment.
4. MB-1 and MB-2 demand load exceeds the service.
5. Provide SCCR and SCA at/for the Elevator controller.
6. Provide 2015 IECC calculation.
7. Pending approval in construction. Accessibility Plan – this does not need to be part of the electrical drawing set.
8. Pending elevator approval.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1779255 |
Electronic Plan | Original | / | 12/7/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1779148 |
CSU Contract Admin. | Original | D | 12/6/2022 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1778764 |
City Engr | Original | D | 12/5/2022 | PMORRIS | PMORRIS | Same comments: Upload a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (permanent water quality facility) construction plan into the building permit. Upload a copy of the approved Development Plan into the building permit. | | City Engr | 1778262 |
Mechanical | Original | D | 12/5/2022 | JUSTINC | JUSTINC | Mechanical approval pending elevator review Add refrigeration calculation in response letter to (M) sheet for next review PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1778047 |
Plumbing | Original | D | 12/5/2022 | SHANEN | SHANEN | Construction and CSU comments must be addressed. Provide required CSU variance letter for the indoor sand/oil interceptor. Contact Robert Bowren at 719-668-1735 or fog@csu.org Sewer and water service sizing and entry locations must match CSU approved construction drawings. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1778020 |
Electronic Plan | Original | / | 12/5/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1777918 |
Elevators | Original | D | 12/5/2022 | ERIC | ERIC | Plan review cannot be done without at least preliminary elevator submittals. . PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Elevators | 1777727 |
CSU Water | Original | D | 12/2/2022 | CSUREVIEW | CSUREVIEW | See previous comments AJ | ajuvera | CSU Water | 1777575 |
CSU Waste Water | Original | D | 12/2/2022 | CSUREVIEW | CSUREVIEW | See previous comments AJ | ajuvera | CSU Waste Water | 1777573 |
Gas/Elec. Utils | Original | D | 12/2/2022 | CSUREVIEW | CSUREVIEW | See previous comments | ajuvera | Gas/Elec. Utils | 1777572 |
Health Dept. | Original | D | 12/2/2022 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AF | Amanda Furno | Health Dept. | 1777568 |
Zoning/Planning | Original | / | 12/2/2022 | ESHAFER | ESHAFER | In Current Review by ESHAFER | | Zoning/Planning | 1777555 |
Construction | Original | D | 12/2/2022 | MICHAELA | MICHAELA | Based on our telephone conversation this morning and a follow-up conversation with my superior I will add our highlights to the assemblies you are indicating as being rated. A0.4 - Clarify the hatch at rooms 12 - 14 etc. If you intend this to be an occupancy separation it must be a Fire Barrier, not a Fire Partition. A9.1 - You have indicated that sprinkler protection will be extended to the balcony projections. A fire resistance-rating at the columns is no longer required. However, the architectural details must match the structural plan. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1777531 |
Enumeration | Original | A | 12/1/2022 | BECKYA | BECKYA | Secondary Addressing on pages A2.0 and A2.1 | | Enumeration | 1777006 |
Electronic Plan | Original | / | 12/1/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1776916 |
Submittal 2 | Original | / | 12/1/2022 | KALLISTAJ | KALLISTAJ | Submittal #2 | | Submittal 2 | 1776864 |
CO Springs Hazmat | Original | D | 10/6/2022 | CSFIRE | CSFIRE | | jt09ff | CO Springs Hazmat | 1751812 |
CO Springs Fire | Original | D | 10/5/2022 | CSFIRE | CSFIRE | Submitted by James Trimble: You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1751548 |
Plumbing | Original | D | 10/4/2022 | SHANEN | SHANEN | Construction and CSU comments must be addressed. P0.0: Provided water pipe size analysis data is incomplete. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Reference 2018 IPC. P1.0B: Provide required CSU variance letter for the indoor sand/oil interceptor. Contact Robert Bowren at 719-668-1735 or fog@csu.org P1.2A - P1.5C, P1.10, P1.11, P2.2: All gas piping related items to be on the mechanical plans. Remove all references to gas piping from the plumbing plans. P1.8: Provide DFU served by the building drain and each section of the building drain. P1.10: Provide WSFU served by each combined section of the water distribution system. P2.0: All condensate piping related items to be on the mechanical plans. Remove all references to condensate piping from the plumbing plans. P2.3: Alternate materials and methods application form required to use an accessible height drinking fountain with bottle filler in lieu of required high/low drinking fountain. See link below.https://www.pprbd.org/Downloads/Permit/Alternate_M%20AND%20M.pdf PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1750796 |
CSU Contract Admin. | Original | D | 9/27/2022 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges/fees. Please contact our office at 719-668-8111 for additional information on charges/fees and to request an estimate.
CWMSF available online at: https://www.csu.org/Documents/CommercialWaterMeterSizing.pdf?csf=1&e=WVWzT5
AMS | ASweet | CSU Contract Admin. | 1747141 |
Mechanical | Original | D | 9/26/2022 | JUSTINC | JUSTINC | See (M) sheets for comments associated with this review. Verify with architect ratings before resubmitting
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1746288 |
City Engr | Original | D | 9/23/2022 | JDAGNILLO | JDAGNILLO | Include a copy of the approved Development Plan and a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. | | City Engr | 1745892 |
Electrical | Original | D | 9/23/2022 | DANIELG | DANIELG | 1. Show OCPD's on the one-line.
2. Approval pending enumerations. Multi meter services must include a list of secondary enumerated addresses on the one-line. Secondary addressing must be approved by enumerations.
3. Fault current information (SCA, SCCR, AIC) must be included, in tabular form, for all new and re-fed electrical equipment including; panel boards, switchboards, service equipment, transfer equipment, elevator control panel, fire pump control panel, industrial control panels, air conditioning and refrigeration equipment.
4. Provide panel schedule and load summary for MB-1 and MB-2.
5. Remove ground from service lateral's.
6. Provide elevator horsepower on the one line.
7. Provide SCCR and SCA at/for the Elevator controller.
8. Provide dimension and partition of all meeting rooms per 210.65 NEC
9. Provide 2015 IECC calculation.
10. Pending approval in construction. Accessibility Plan – this does not need to be part of the electrical drawing set.
11. Pending elevator approval.
Complete re-review.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1745876 |
CO Springs DRE | Original | D | 9/23/2022 | ESHAFER | ESHAFER | Upload approved development plan (with Land Use Review stamp present) and the recorded final plat. (see full review) | | CO Springs DRE | 1745801 |
Zoning/Planning | Original | / | 9/23/2022 | ESHAFER | ESHAFER | In Current Review by ESHAFER | | Zoning/Planning | 1745800 |
Electronic Plan | Original | / | 9/23/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1745702 |
CSU Water | Original | D | 9/23/2022 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. SSM | stefanm | CSU Water | 1745587 |
CSU Waste Water | Original | D | 9/23/2022 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. SSM | stefanm | CSU Waste Water | 1745585 |
Gas/Elec. Utils | Original | D | 9/23/2022 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. SSM | stefanm | Gas/Elec. Utils | 1745581 |
Health Dept. | Original | D | 9/23/2022 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3.CM | cmille96 | Health Dept. | 1745519 |
Construction | Original | D | 9/23/2022 | MICHAELA | MICHAELA | Correct Code Study for travel distances. Structure should not be separated use. Accessibility Plan - Provide garage level showing accessible parkingAddress accessibility on all levels. A0.1 - Assign a type to each of the floor and roof assemblies and reference those types in the section view throughout the plan. Cannot find GA FC 5014. Missing RC 2751 assembly being used above stairs. Provide a 2-hr. exterior wall listing for the supporting construction for the roof assembly. The type of construction above the pedestal is V-A and there are beams that are a part of the primary structural frame that require individual encasement protection. Provide a listed assembly on this page for the protection of those beams. A0.2 - WP 5512 does not match listing. In all cases where you are adding framing to the listed assembly clearly show the extents of the assembly and diminish the view of the added framing. Clarify the type descriptions labeling the plan view of wall types 7,10,11 and 12. Provide a narrative for the process of constructing and inspecting wall types 10 and 11. WP 4135 does not match the listing. Missing the listing number for wall type 16. Revise IBC table referenced to current code. In A0.4 - Address the purpose of and the hourly rating of walls at rooms 02, 03, 04, 05, 06, 08, 12, 13 and 14. Include all the requirements of the Life Safety Plan on all Life Safety pages. A0.5 - Mechanical shaft does not seem to continue to the floor below and only connects 3 stories. A 1-hr. shaft enclosure will be required. Is a shaft required per IBC sec. 717.6.1? Wall hatches are not clear.Do not hatch exterior bearing walls.The highlights added to the plan based on the legend provided are the only code required separations. Trash chute access rooms must be separated with fire barriers. No separation is required between the community room and the fitness room. Why is there a rated wall indicated between the storage rooms adjacent to rooms 103 and 117? Room 117 - Floor plan pages show a shaft here. If the penetrations of ductwork in the enclosure adjacent to room 117 meets the requirements if IBC 717.6.1 a shaft is not required. A0.6/7 - Wall hatches are not clear.Do not hatch exterior bearing walls.The highlights added to the plan based on the legend provided are the only code required separations. Label space adjacent to elevator and room 211/311. Unit 211 must be separated from the hallway. Why is there a rated wall indicated between the storage rooms adjacent to rooms 203 and 217? Walls separating trash chute access room from other occupancies must be fire barriers. A0.9/10 - Either show door clearances on the plan or remove them from the legend. A0.11 - This page does not have to be included in this plan set. Address deficiencies in the Accessibility Plan folder. A2.3 - Storage room 06 is indicated as having a rated separation on the Life Safety Plan. Provide the code path to require the separation or indicate it is "For Other then the IBC". Clarify railing location and purpose. Is mechanical equipment at grade or suspended? What do they serve? A2.4 - Missing wall types. Rooms 02, 04, 08, and 09 are indicated as having a rated separation on the Life Safety Plan and have rated wall types here. Provide the code path to require the separation or indicate it is "For Other then the IBC". Correct keynotes. A2.5 - Rooms 12, 13, and 14 are indicated as having a rated separation on the Life Safety Plan and have rated wall types here. Provide the code path to require the separation or indicate it is "For Other then the IBC". Address keynote 41. Missing wall types. A2.7 - Chute access room must be separated with fire barriers. Add required wall types. Why are rated walls be required between storage rooms? Wall type is incorrect at doors 140 and 141. Separation is not required between the lobby and the fitness room. Clarify why rated wall types 1 and 1A are being indicated adjacent to the lobby. Missing wall types. A2.8 - Why are rated walls be required between storage rooms? Missing wall type. A2.10/13 - Chute access room must be separated with fire barriers. Add required wall types. Why are rated walls be required between storage rooms? A2.11/14 - Why are rated walls be required between storage rooms? A2.15 - Locate required draftstopping in attic on roof plan pages. Provide a detail for openings through the draftstop for attic access. A3.1 - Locate required clear floor spaces at kitchen accessible features. A3.2 - Detail 6 - Add note that laundry is only at the main floor or revise floor plans to show equipment. Detail 3 - Show turning radius in trash access room. All Room floor plans. - Show the required CFSs at both stove and oven open and dishwasher and dishwasher open. Add a section symbol at walls where a continuous mechanical soffit will be created. These are bearing walls at mechanical closets. Add wall type. Some units have interior bearing walls that have incorrect wall types. In many units the tub must be rotated 180 degrees to be compliant. A4.17 - Add the Guest Room to Code Study as accessory use R-1 occupancy. A8.0 - Detail 2 - Clarify that treated means FRT or indicate that sprinkler protection will be extended to deck. Either provide the 1-hr. assembly at the floor framing or provide a listing for the fire protection of the floor system at the dropped framing. A8.1 - If the truss is to be used for the top of shaft assembly the supporting construction must also be 2-hr. Provide a 2-hr exterior wall assembly to support the truss. A8.2 - Clarify balcony compliance with IBC sec. 1406.3. A8.3 - Tag wall types in these views.Per an ICC code interpretation we have received the wood framed walls adjacent to the 2-hr. shaft wall is not by itself a compliant rated bearing wall as it is not a complete assembly protected from both sides. Per ICC the wall is prohibited from borrowing the shaft liner to complete the inner membrane. After conferring with engineers at UL in order to achieve a 1-hr. rating for both assigned time and heat transfer, 2 layers of 5/8" type X sheetrock must be applied to the unit side of the wood framed wall. Clarify deck and pergola compliance with IBC sec. 1406.3. A8.4 - Requirements of the 2-hr. shaft end at the roof sheathing Roof above shaft must only comply with type of construction, 1-hr. A8.5 - Tag wall types in these views. A8.6 - Tag wall types and roof assembly in this view. A9.2 - Detail 4 - Clarify how the balconies and the supporting construction comply either with the type of construction or complying with IBC section 1406.3. Detail 5 - Address the protection of the supporting construction for the roof. A10.0 - Provide the specific listing for the wall assembly behind the fire extinguisher. Address connection of stringer to ledger or beam. Not addressed on structural plan. A10.2 - Detail 13 - Provide structural details for the dropped framing at this location including all attachment and hardware details. Building section 2 on A8.0 indicates that the fire protection will be at the floor framing. Show that correctly in this view. Remove the note for protection at the drop ceiling. A10.3 - Provide the specific listing for the assembly behind the refrigerator box. Detail 14 - Provide a framing plan for the continuous soffit along this wall. A11.0 Correct door schedule - Doors in shaft enclosures must have the same rating as the enclosure.Doors in elevator equipment rooms must have the same rating as the hoistway.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1745425 |
Electronic Plan | Original | / | 9/19/2022 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Electronic Plan | 1743203 |
Enumeration | Original | D | 9/19/2022 | BECKYA | BECKYA | The secondary addressing on first, second and third floors (unit 110, 210 and 310) does not follow our secondary addressing guidelines. Since these are across the hall from unit 108, 208 and 308 which are even, this unit will need to have an odd number. Suggest changing the plans to unit 111, 211 and 311.
The Development plan submittal referred to a Club/Bar area, will this area be ran by a separate tenant? If so, a suite number will need to be assigned based off of our Commercial Secondary Addressing.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 1743131 |
Elevators | Original | D | 9/19/2022 | ERIC | ERIC | Please provide elevator submittals. . (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Elevators | 1743085 |
Electronic Plan | Original | / | 9/19/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1742983 |
Floodplain | Original | N | 9/14/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6319205005) | | Floodplain | 1741272 |