Security Hazmat | Original | A | 11/21/2022 | SECURITYFIRE | SECURITYFIRE | APPROVED SFD MAS | JesseGianino | Security Hazmat | 1773655 |
Security Fire | Original | A | 11/21/2022 | SECURITYFIRE | SECURITYFIRE | Approved SFD, MAS | JesseGianino | Security Fire | 1773651 |
Security Hazmat | Original | D | 11/5/2022 | SECURITYFIRE | SECURITYFIRE | Please clarify if the the amount of corrosives listed is for the 12 new batteries or the total of the 24 batteries. Must comply with section 608 of the International Fire code. require spec sheets on the batteries, signage, ventilation and smoke detection requirements per Section 608 of the 2015 IFC. | JesseGianino | Security Hazmat | 1766933 |
Security Hazmat | Original | D | 11/5/2022 | SECURITYFIRE | SECURITYFIRE | Please clarify if the the amount of corrosives listed is for the 12 new batteries or the total of the 24 batteries. Must comply with section 608 of the International Fire code. require spec sheets on the batteries, signage, ventilation and smoke detection requirements per Section 608 of the 2015 IFC. | JesseGianino | Security Hazmat | 1766932 |
Security Fire | Original | D | 11/5/2022 | SECURITYFIRE | SECURITYFIRE | Please submit a Security Fire Department Plan Review Form found on the Security Fire Web Site ttps://securityfiredept.org/wp-content/uploads/2021/11/sfpd_plan_review_application.pdf There is also a $250.00 fee that needs to be paid to the Security Fire Department. | JesseGianino | Security Fire | 1766931 |
Fire | Original | / | 10/24/2022 | SYSTEM | SYSTEM | Contact Fire department for approval prior to permit | | Fire | 1760832 |
Hazmat | Original | / | 10/24/2022 | SYSTEM | SYSTEM | Contact Hazmat department for approval prior to permit | | Hazmat | 1760831 |
Electrical | Original | A | 10/20/2022 | SHELBY | SHELBY | | | Electrical | 1759765 |
Submittal 2 | Original | / | 10/13/2022 | KALLISTAJ | KALLISTAJ | Submittal #2 | | Submittal 2 | 1756396 |
Electrical | Original | D | 10/7/2022 | BERTHA | BERTHA | 1. Provide conduit/conductor size, type, and quantity, beginning at the utility transformer, to include all conductors in the chain of supply for the electrical equipment in the scope of work 2. All electrical equipment in the electrical distribution system clearly labeled as New, Existing, or Future.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1753059 |
Electronic Plan | Original | / | 10/7/2022 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 1753055 |
County Zoning | Original | A | 10/6/2022 | DSDKILGORE | DSDKILGORE | COM2239 | | County Zoning | 1752195 |
Mechanical | Original | N | 10/4/2022 | JUSTINC | JUSTINC | No new or revised mechanical scope indicated | | Mechanical | 1750855 |
Construction | Original | N | 10/4/2022 | CHRISTAW | CHRISTAW | No Construction Work | | Construction | 1750660 |
Enumeration | Original | N | 10/3/2022 | BECKYA | BECKYA | | | Enumeration | 1749638 |
Electronic Plan | Original | / | 10/3/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1749633 |
Fire | Original | / | 10/3/2022 | SYSTEM | SYSTEM | You will need to contact Fire department for approval prior to permit. This department will not review the plan electronically. | | Fire | 1749468 |
Hazmat | Original | / | 10/3/2022 | SYSTEM | SYSTEM | You will need to contact Hazmat department for approval prior to permit. This department will not review the plan electronically. | | Hazmat | 1749467 |
Floodplain | Original | N | 10/3/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6501200004) | | Floodplain | 1749466 |