Electrical | Original | A | 11/4/2024 | BERTHA | BERTHA | | | Electrical | 2081124 |
Electronic Plan | Original | / | 11/4/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2081069 |
CO Springs DRE | Original | A | 10/16/2024 | MAMBUUL | MAMBUUL | Previous approval comments still apply. (see full review) | | CO Springs DRE | 2073441 |
Zoning/Planning | Original | / | 10/16/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2073068 |
Enumeration | Original | D | 10/15/2024 | BRENT | BRENT | See comments 7/16/24 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2072998 |
Electronic Plan | Original | / | 10/15/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2072995 |
| Original | / | 10/15/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2072982 |
| Original | / | 10/15/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2072827 |
Submittal 5 | Original | / | 10/15/2024 | QUINTONW | QUINTONW | Submittal #5 | | Submittal 5 | 2072826 |
Electrical | Original | D | 9/9/2024 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2057614 |
Electronic Plan | Original | / | 9/9/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2057593 |
CO Springs DRE | Original | A | 9/9/2024 | MAMBUUL | MAMBUUL | Proposed plans consistent with approved plan set stamped by land use review. See previous approval comments. (see full review) | | CO Springs DRE | 2057212 |
Zoning/Planning | Original | / | 9/9/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2057099 |
Zoning/Planning | Original | / | 9/6/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2056441 |
Construction | Original | A | 9/5/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2056327 |
Electronic Plan | Original | / | 9/5/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2056320 |
Enumeration | Original | D | 9/5/2024 | BRENT | BRENT | See comments 7/16/24 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2056291 |
Electronic Plan | Original | / | 9/5/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2056277 |
| Original | / | 9/5/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2055964 |
| Original | / | 9/4/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2055595 |
Submittal 4 | Original | / | 9/4/2024 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2055594 |
CO Springs DRE | Original | A | 7/17/2024 | SSADLER | SSADLER | Previous approval comments still apply. Approved per Adam P (see full review) | | CO Springs DRE | 2033650 |
City Engr | Original | N | 7/16/2024 | JDAGNILLO | JDAGNILLO | | | City Engr | 2033191 |
Electrical | Original | D | 7/16/2024 | BERTHA | BERTHA | Comply with previous review comments.
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2033120 |
Electronic Plan | Original | / | 7/16/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2033117 |
Zoning/Planning | Original | / | 7/16/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2033045 |
Construction | Original | A | 7/16/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2032967 |
Enumeration | Original | D | 7/16/2024 | BRENT | BRENT | Include a site plan showing all of the new buildings for this parcel, with addressing, in the architectural plan pages. Wrecking permit for existing structures have not been issued. Enumerations approval pending issuance of wrecking permits. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2032862 |
Electronic Plan | Original | / | 7/16/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2032857 |
| Original | / | 7/16/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2032799 |
| Original | / | 7/12/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2031432 |
Submittal 3 | Original | / | 7/12/2024 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2031431 |
Electrical | Original | D | 4/23/2024 | SHELBY | SHELBY | Please provide electrical plan for lighting. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1993134 |
Electronic Plan | Original | / | 4/23/2024 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1993132 |
CO Springs DRE | Original | A | 4/16/2024 | MOBRIEN | MOBRIEN | Approved per A. Paquette. (see full review) | | CO Springs DRE | 1989922 |
City Engr | Original | D | 4/12/2024 | JDAGNILLO | JDAGNILLO | Include a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. (Project Dox #STM-REV23-0823 & 0825) | | City Engr | 1988725 |
Zoning/Planning | Original | / | 4/12/2024 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 1988434 |
Construction | Original | D | 4/12/2024 | BPHILLIPS | BPHILLIPS | Soils report provided indicates allowable bearing capacity of 2500 psf, but 4000 psf on sheet XC110. Documents must match. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1988374 |
Electronic Plan | Original | / | 4/12/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1988373 |
Enumeration | Original | D | 4/11/2024 | BRENT | BRENT | Is there a plat associated with this project? If so, then Enumerations will not approve any building plans without a copy of the final recorded plat in our records. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1988325 |
Electronic Plan | Original | / | 4/11/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1988297 |
Submittal 2 | Original | / | 4/11/2024 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 1988238 |
Plumbing | Original | N | 1/4/2024 | SHANEN | SHANEN | | | Plumbing | 1947220 |
CO Springs DRE | Original | A | 1/3/2024 | APAQUETTE | APAQUETTE | Architectural plans are consistent with DEPN-23-0055 (see full review) | | CO Springs DRE | 1946599 |
CO Springs Hazmat | Original | N | 1/3/2024 | CSFIRE | CSFIRE | The Fuel Canopy is N/A. The fuel tanks, pumps and systems are a seprate submital usualy associated with the building. Submitted By: Stanwood, Mark Antone,Submitted By: Stanwood, Mark Antone | mark.stanwood@colora | CO Springs Hazmat | 1946433 |
City Engr | Original | D | 1/2/2024 | JDAGNILLO | JDAGNILLO | Include a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. (Project Dox #STM-REV23-0823 & 0825) | | City Engr | 1946242 |
CO Springs Fire | Original | N | 1/2/2024 | CSFIRE | CSFIRE | | phil.valdez | CO Springs Fire | 1945965 |
CSU Contract Admin. | Original | N | 1/2/2024 | CSUAPPSPRM | CSUAPPSPRM | No fees due this plan set. CZ | c.zani | CSU Contract Admin. | 1945960 |
Electrical | Original | D | 12/29/2023 | SHELBY | SHELBY | Provide Electrical plans for the canopy lighting. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1945586 |
Electronic Plan | Original | / | 12/29/2023 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1945585 |
Mechanical | Original | N | 12/29/2023 | DALEH | DALEH | | | Mechanical | 1945581 |
CSU Water | Original | N | 12/29/2023 | CSUREVIEW | CSUREVIEW | No plumbing work. MAR | MRoberts | CSU Water | 1945460 |
CSU Waste Water | Original | N | 12/29/2023 | CSUREVIEW | CSUREVIEW | No plumbing work. MAR | MRoberts | CSU Waste Water | 1945455 |
Gas/Elec. Utils | Original | A | 12/29/2023 | CSUREVIEW | CSUREVIEW | No apparent conflicts. MAR | MRoberts | Gas/Elec. Utils | 1945453 |
Zoning/Planning | Original | / | 12/29/2023 | APAQUETTE | APAQUETTE | In Current Review by APAQUETTE | | Zoning/Planning | 1945420 |
Construction | Original | D | 12/29/2023 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1945398 |
Electronic Plan | Original | / | 12/28/2023 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1944945 |
Enumeration | Original | D | 12/19/2023 | BRENT | BRENT | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1942671 |
Electronic Plan | Original | / | 12/19/2023 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1942661 |
Floodplain | Original | N | 12/12/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6402300026) | | Floodplain | 1939113 |