Tri-Lakes Fire (CSFD) | Original | N | 4/30/2024 | CSFIRE | CSFIRE | No Fire Final (see full review) | phil.valdez | Tri-Lakes Fire (CSFD) | 1996912 |
Tri-Lakes Hazmat (CSFD) | Original | N | 4/30/2024 | CSFIRE | CSFIRE | NA | phil.valdez | Tri-Lakes Hazmat (CSFD) | 1996911 |
Energy | Original | D | 4/15/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1989136 |
Mechanical | Original | A | 4/15/2024 | DALEH | DALEH | | | Mechanical | 1989135 |
Health Dept. | Original | N | 4/12/2024 | HEALTHDEPT | HEALTHDEPT | Not applicable. KB | KBauer | Health Dept. | 1988917 |
Plumbing | Original | D | 4/12/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1988642 |
Electrical | Original | A | 4/12/2024 | DANIELG | DANIELG | | | Electrical | 1988604 |
Construction | Original | A | 4/12/2024 | CGIECK | CGIECK | Approved | | Construction | 1988579 |
Electronic Plan | Original | / | 4/12/2024 | CGIECK | CGIECK | In Current Review by CGIECK | | Electronic Plan | 1988536 |
Enumeration | Original | A | 4/12/2024 | BECKYA | BECKYA | | | Enumeration | 1988508 |
Submittal 2 | Original | / | 4/12/2024 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 1988395 |
Monument Water | Original | A | 3/22/2024 | TOWNOFMON | TOWNOFMON | Plan conditionally approved by Town of Monument. Permit Fees are due within 10 days of permit authorization. Note that no final Monument Inspection for C/O can be completed unless all permit fees are paid, Development items/requests are completed and inspection requirements are met which could include the Monument Water Department. Any change to the approved plot plan or variations in the model as depicted on the plot plan requires a plot plan modification and re-review. For more information you may email the Planning Department at planning@tomgov.org. Thank you | Rey Medina | Monument Water | 1978459 |
Monument Zoning | Original | A | 3/22/2024 | TOWNOFMON | TOWNOFMON | Plan conditionally approved by Town of Monument. Permit Fees are due within 10 days of permit authorization. Note that no final Monument Inspection for C/O can be completed unless all permit fees are paid, Development items/requests are completed and inspection requirements are met which could include the Monument Water Department. Any change to the approved plot plan or variations in the model as depicted on the plot plan requires a plot plan modification and re-review. For more information you may email the Planning Department at planning@tomgov.org. Thank you | Rey Medina | Monument Zoning | 1978458 |
Tri-Lakes Hazmat (CSFD) | Original | D | 3/5/2024 | CSFIRE | CSFIRE | Provide completed hazmat triage form and chemical inventory list https://coloradosprings.gov/hazmat | chiptaylor | Tri-Lakes Hazmat (CSFD) | 1971161 |
Tri-Lakes Fire (CSFD) | Original | D | 3/5/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | Tri-Lakes Fire (CSFD) | 1971160 |
Energy | Original | D | 2/15/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1964143 |
Mechanical | Original | D | 2/15/2024 | DALEH | DALEH | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1964142 |
Plumbing | Original | D | 2/14/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1963548 |
Electrical | Original | D | 2/14/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1963376 |
Electronic Plan | Original | / | 2/14/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1963343 |
Construction | Original | D | 2/14/2024 | CGIECK | CGIECK | PLEASE REVIEW PROGRESS SET. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1963311 |
Elevators | Original | N | 2/13/2024 | ERIC | ERIC | No conveyance | | Elevators | 1963112 |
Electronic Plan | Original | / | 2/13/2024 | CGIECK | CGIECK | In Current Review by CGIECK | | Electronic Plan | 1962997 |
Enumeration | Original | D | 2/12/2024 | BECKYA | BECKYA | Please provide an Architectural Site Plan in the Architectural Plans. Enumerations does not review or approve site plans in Development or Civil Plans. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1962647 |
Electronic Plan | Original | / | 2/12/2024 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1962640 |
Waste Water Div | Original | / | 2/1/2024 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 1958446 |
Energy | Original | / | 2/1/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1958445 |
Floodplain | Original | N | 2/1/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7115100034) | | Floodplain | 1958443 |