Mechanical | Original | N | 2/22/2024 | DALEH | DALEH | | | Mechanical | 1966460 |
Plumbing | Original | N | 2/22/2024 | SHANEN | SHANEN | | | Plumbing | 1966298 |
Electrical | Original | A | 2/21/2024 | DANIELG | DANIELG | | | Electrical | 1966201 |
Electronic Plan | Original | / | 2/21/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1966190 |
Elevators | Original | A | 2/21/2024 | ROBERTV | ROBERTV | Conventional Hydraulic Elevator Modernization, No Generator. (RBD Notes: A17.1 - 2019, A117.1 - 2009) | | Elevators | 1966157 |
Construction | Original | N | 2/21/2024 | SHELLEY | SHELLEY | No construction work. | | Construction | 1966015 |
Submittal 2 | Original | / | 2/21/2024 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 1965676 |
Plan Coordinator (Main) | Original | D | 2/13/2024 | SIERRAC | SIERRAC | Disapprove all remaining departments to allow plan to be resubmitted per Robert V. -Missing several requirements- will need to resubmit for further review with needed requirements. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plan Coordinator (Main) | 1962968 |
Elevators | Original | D | 2/13/2024 | ROBERTV | ROBERTV | The following need to be addressed for a complete review:
1) Code Study Form: OK 2) Elevator Plans and Submittals: Needs to include TKE's scope of work along with all the specifications of the all new equipment being installed, please remove Fire Alarm Drawing, this needs to be submitted to CSFD 3) Electrical Drawings: Engineered Drawing OK for electrical department to review, need to add TKE Equipment Electrical Specifications 4) Misc Documentation #1: Please remove Fire Alarm Equipment Specs's, these need to be submitted to CSFD 5) Misc Documentation #2: TKE Equipment Electrical Specifications needs to be submitted with Electrical Drawings 6) Misc Documentation: Need to include PPRBD Survey Document
Once these submission issues are corrected, we can perform a complete review
RBD Note: Disapproved remaining departments to release plan for expedited corrections . 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Elevators | 1962964 |
Enumeration | Original | N | 2/13/2024 | AMY | AMY | The Legal description and tax schedule number has been changed since the last plat and has been updated on the Code Study form for you. If this sheet gets changed out, correct this information. | | Enumeration | 1962724 |
Electronic Plan | Original | / | 2/13/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1962716 |
Energy | Original | N | 2/12/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1962428 |
Floodplain | Original | N | 2/12/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6233201004) | | Floodplain | 1962427 |