Energy | Original | A | 5/1/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1997404 |
Electrical | Original | A | 5/1/2024 | DANIELG | DANIELG | | | Electrical | 1997403 |
Construction | Original | A | 5/1/2024 | SHELLEY | SHELLEY | | | Construction | 1997303 |
Plumbing | Original | A | 5/1/2024 | SHANEN | SHANEN | | | Plumbing | 1997039 |
| Original | / | 4/30/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 1996445 |
| Original | / | 4/30/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 1996428 |
Submittal 3 | Original | / | 4/30/2024 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 1996427 |
CO Springs Fire | Original | A | 4/25/2024 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! (see full review) | phil.valdez | CO Springs Fire | 1994405 |
Energy | Original | D | 4/8/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1985753 |
Plumbing | Original | D | 4/8/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1985752 |
Mechanical | Original | A | 4/8/2024 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 1985697 |
Electrical | Original | A | 4/8/2024 | DANIELG | DANIELG | | | Electrical | 1985518 |
Construction | Original | A | 4/8/2024 | SHELLEY | SHELLEY | | | Construction | 1985507 |
Enumeration | Original | N | 4/8/2024 | AMY | AMY | | | Enumeration | 1985358 |
Electronic Plan | Original | / | 4/8/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1985335 |
Submittal 2 | Original | / | 4/5/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 1985174 |
CO Springs Fire | Original | D | 3/25/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | rpeterson | CO Springs Fire | 1978923 |
CO Springs Hazmat | Original | N | 3/25/2024 | CSFIRE | CSFIRE | | rpeterson | CO Springs Hazmat | 1978920 |
Health Dept. | Original | N | 3/8/2024 | HEALTHDEPT | HEALTHDEPT | Not applicable. Remodel of existing retail tenant space for new Fabletics store. MT | mtemple | Health Dept. | 1973175 |
CO Springs DRE | Original | N | 3/6/2024 | SSADLER | SSADLER | Interior remodel only. No change in footprint, No change in parking. No change in occupancy. | | CO Springs DRE | 1972085 |
Zoning/Planning | Original | / | 3/6/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 1972049 |
Electrical | Original | D | 3/6/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1971940 |
Energy | Original | D | 3/6/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1971941 |
Electronic Plan | Original | / | 3/6/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1971903 |
Mechanical | Original | D | 3/6/2024 | TCRIPPEN | TCRIPPEN | Pending constructions notes. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1971896 |
Plumbing | Original | D | 3/6/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1971878 |
CSU Water | Original | A | 3/6/2024 | CSUREVIEW | CSUREVIEW | Backflow okay. MLW | mlwilliams | CSU Water | 1971852 |
CSU Waste Water | Original | N | 3/6/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MLW | mlwilliams | CSU Waste Water | 1971849 |
Construction | Original | D | 3/6/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1971837 |
Electronic Plan | Original | / | 3/6/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 1971754 |
Enumeration | Original | D | 2/28/2024 | AMY | AMY | Lettering with the suite numbers does not apply. Remove or cross out the lettering in the suite number. Suite 320 would be in the building to the east under 1685. If this is to be Suite 230 does not have prior permit history. Therefore, this would be an interior finish. Research prior permit history. Is this suite 223? Provide a floor plan showing the separation of space per tenant along with the suite numbering for this half of the building. Cloud or shade the area of work. | | Enumeration | 1968539 |
Electronic Plan | Original | / | 2/28/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1968537 |
Energy | Original | / | 2/26/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1967894 |
Floodplain | Original | N | 2/26/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6232102001) | | Floodplain | 1967893 |