CO Springs Hazmat | Original | D | 4/17/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. (see full review) | mark.stanwood@colora | CO Springs Hazmat | 1990410 |
CSU Water | Original | N | 4/12/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building. Applicant confirmed only one EV charger per station.MDA | malcuran | CSU Water | 1988713 |
CSU Waste Water | Original | N | 4/12/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. Applicant confirmed only one EV charger per station.MDA | malcuran | CSU Waste Water | 1988712 |
CO Springs DRE | Original | A | 4/12/2024 | SSADLER | SSADLER | Approved for EV chargers (see full review) | | CO Springs DRE | 1988441 |
CO Springs Fire | Original | N | 4/11/2024 | CSFIRE | CSFIRE | NA'D PLAN SENT TO COSTRUCTION SERVICES FOR HAZMAT REVIEWYou are responsible for reviewing the comments found on the CSFD website as they contain important information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! (see full review) | MrLouis | CO Springs Fire | 1988349 |
CO Springs Hazmat | Original | N | 4/11/2024 | CSFIRE | CSFIRE | NA'D PLAN, SENT TO COSTRUCTION SERVICES FOR HAZMAT REVIEWYou are responsible for reviewing the comments found on the CSFD website as they contain important information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! (see full review) | MrLouis | CO Springs Hazmat | 1988348 |
Energy | Original | A | 4/11/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1988105 |
Mechanical | Original | N | 4/11/2024 | DALEH | DALEH | | | Mechanical | 1988104 |
Electrical | Original | A | 4/11/2024 | DANIELG | DANIELG | Approved EV charger. | | Electrical | 1987934 |
Electronic Plan | Original | / | 4/11/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1987913 |
Plumbing | Original | N | 4/11/2024 | SHANEN | SHANEN | | | Plumbing | 1987681 |
Zoning/Planning | Original | / | 4/10/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 1987518 |
CSU Water | Original | D | 4/10/2024 | CSUREVIEW | CSUREVIEW | See comment under Waste Water.MDA | malcuran | CSU Water | 1987452 |
CSU Waste Water | Original | D | 4/10/2024 | CSUREVIEW | CSUREVIEW | Please confirm under 3p, 1n, 9q and Ckt # 47 & 51 matches site plan which only shows one EV charging station at each location.MDA | malcuran | CSU Waste Water | 1987450 |
Construction | Original | N | 4/10/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 1987404 |
Electronic Plan | Original | / | 4/10/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1987397 |
Enumeration | Original | N | 4/9/2024 | BRENT | BRENT | | | Enumeration | 1986849 |
Electronic Plan | Original | / | 4/9/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1986833 |
Energy | Original | / | 4/9/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1986272 |
Floodplain | Original | N | 4/9/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6305401001) | | Floodplain | 1986271 |