Woodmoor Waste Water | Original | D | 11/19/2024 | WOODWATER | WOODWATER | 1.The sanitary service tap application must be filled out with all associated tap fees paid prior to plan approval. Please visit our website for tap fee schedule.
2.Please see the Review Plans for all additional sanitary distribution comments. | wwsdengineer | Woodmoor Waste Water | 2086811 |
Woodmoor Water | Original | D | 11/19/2024 | WOODWATER | WOODWATER | 1.All individual tap applications for water service and irrigation service must be filled out with all associated tap fees paid prior to plan approval. Please visit our website for tap fee schedule.
2.Please see the Review Plans for all additional water distribution comments. | wwsdengineer | Woodmoor Water | 2086818 |
Tri-Lakes Fire (CSFD) | Original | D | 11/5/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | Tri-Lakes Fire (CSFD) | 2081901 |
Tri-Lakes Hazmat (CSFD) | Original | N | 11/5/2024 | CSFIRE | CSFIRE | | chiptaylor | Tri-Lakes Hazmat (CSFD) | 2081899 |
Energy | Original | D | 10/30/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2079630 |
Electrical | Original | D | 10/30/2024 | BERTHA | BERTHA | Load on panel LV exceeds OCPD
Fire pump service conductor is undersized.
Provide prior approval from Colorado Springs Utilities for utility equipment located behind walls, fences, etc
Clarify main disconnect size
Provide compliance with 250.66 on the one-line. Provide detail 2 / sheet E3.0
Pending approval in Enumerations - Multi-meter services must include a list of enumerated addresses on the one-line diagram. Addresses must be approved by Enumerations.
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2079629 |
County Zoning | Original | A | 10/30/2024 | DSDWEEKS | DSDWEEKS | Overall Building SF = 164,166 SF Per Traffic Impact Study 75% of total square footage will be used for warehousing and 25% will be retail/showroom use. 75% of 164,166 SF = 123,124.5 SF (Warehouse) 25% of 164,166 SF = 41,041.5 SF (General Commercial)
(123,124.5 SF / 1,000 SF) x $1,865 = $229,627.1925 (41,041.5 SF / 1,000 SF) x $4,958 = $203,483.757
Total Road Impact Fee Due = $229,627.1925 + $ 203,483.757 Total Road Impact Fee Due = $433,110.9495 | | County Zoning | 2079228 |
Zoning/Planning | Original | / | 10/29/2024 | DSDWEEKS | DSDWEEKS | In Current Review by DSDWEEKS | | Zoning/Planning | 2078705 |
Electronic Plan | Original | / | 10/28/2024 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 2078285 |
Zoning/Planning | Original | / | 10/25/2024 | DSDPARSONS | DSDPARSONS | In Current Review by DSDPARSONS | | Zoning/Planning | 2077630 |
Plumbing | Original | D | 10/25/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2077619 |
Mechanical | Original | A | 10/25/2024 | DALEH | DALEH | | | Mechanical | 2077455 |
Construction | Original | D | 10/25/2024 | BPHILLIPS | BPHILLIPS | Property above 7000' in elevation. Revise snow load design criteria as noted. Slab insulation U-values on Comcheck document do not correspond to the R-value shown on IECC form provided. Clarify. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2077380 |
Electronic Plan | Original | / | 10/25/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2077238 |
Enumeration | Original | D | 10/24/2024 | BRENT | BRENT | Show secondary addressing for this building which follows the RBD secondary addressing guide available on our website on the diagrams in the architectural plan pages. Show secondary addressing for the maximum number of tenants the building could hold. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2077093 |
Electronic Plan | Original | / | 10/24/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2077062 |
Energy | Original | / | 4/16/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1989652 |
Floodplain | Original | N | 4/16/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7111000018) | | Floodplain | 1989651 |