Health Dept. | Original | D | 5/1/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/retail-food/retail-food-establishments/. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1997479 |
Energy | Original | D | 5/1/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1997472 |
Electrical | Original | D | 5/1/2024 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1997471 |
CO Springs DRE | Original | D | 5/1/2024 | MOBRIEN | MOBRIEN | 1. Please provide current and proposed parking calculation and exhibit based on new square footage. 2. Expansion of dining area may trigger Citywide Development Impact (CDI) fees. Please contact planner for fee estimate: molly.obrien@coloradosprings.gov (see full review) | | CO Springs DRE | 1997300 |
CSU Water | Original | N | 4/30/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building. CJS | cjsavage | CSU Water | 1996374 |
CSU Waste Water | Original | N | 4/30/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. CJS | cjsavage | CSU Waste Water | 1996373 |
Plumbing | Original | N | 4/30/2024 | SHANEN | SHANEN | | | Plumbing | 1996318 |
Zoning/Planning | Original | / | 4/30/2024 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 1996261 |
Construction | Original | D | 4/29/2024 | DANM | DANM | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1996116 |
Mechanical | Original | D | 4/29/2024 | DALEH | DALEH | Provide a ventilation schedule 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1995946 |
Electronic Plan | Original | / | 4/29/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 1995846 |
Enumeration | Original | N | 4/25/2024 | BRENT | BRENT | | | Enumeration | 1994626 |
Electronic Plan | Original | / | 4/25/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1994623 |
Energy | Original | / | 4/25/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1994384 |
Floodplain | Original | N | 4/25/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7413404008) | | Floodplain | 1994383 |