Energy | Original | D | 11/6/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2082160 |
Electrical | Original | D | 11/6/2024 | BERTHA | BERTHA | Pending approval in Elevator's - see Elevator review comments.
Comply with previous review comment - Provide elevator motor hp on the one-line diagram.
Comply with previous review comment - Provide fault current information (SCCR, AIC, SCA) - In tabular format - at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed
Provide withstand rating for all equipment in the short circuit calculations table.
Provide fault current information for control panels, for example the elevator control panel.
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2082159 |
Electronic Plan | Original | / | 11/6/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2082101 |
Electronic Plan | Original | / | 11/6/2024 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2082100 |
CO Springs Fire | Original | A | 10/25/2024 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | rpeterson | CO Springs Fire | 2077307 |
Plumbing | Original | D | 10/17/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2073866 |
Mechanical | Original | D | 10/16/2024 | TCRIPPEN | TCRIPPEN | Disapproved: How complying with 1109..2.5 pipe shafts:Refrigerant piping that penetrates toe or more floor/ceiling assemblies shall be enclosed in a fire resistance- rated shaft enclosure. The fire-resistancerates shaft enclosure shall comply with section 717 of the international Building Code, 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2073266 |
CO Springs DRE | Original | D | 10/16/2024 | SSADLER | SSADLER | Previous comments not addressed. Public and private assurances must be posted prior to building permit release. | | CO Springs DRE | 2073134 |
Zoning/Planning | Original | / | 10/14/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2072005 |
Construction | Original | D | 10/14/2024 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2071936 |
CSU Contract Admin. | Original | A | 10/11/2024 | CSUAPPSPRM | CSUAPPSPRM | Applicable development charges and fees paid.
AMS | ASweet | CSU Contract Admin. | 2071605 |
Elevators | Original | D | 10/11/2024 | ERIC | ERIC | TKE conventional hydraulic elevator, no generator, 2019 code.
See E-001, E-01.1, E-01.3 All are for removal of shunt trip and locations for fire alarm initiating devices and sprinkler heads. . 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Elevators | 2071601 |
Electronic Plan | Original | / | 10/11/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2071403 |
Enumeration | Original | A | 10/10/2024 | AMY | AMY | | | Enumeration | 2071281 |
Electronic Plan | Original | / | 10/10/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2071277 |
Submittal 2 | Original | / | 10/10/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2071274 |
CO Springs Fire | Original | D | 9/18/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | rpeterson | CO Springs Fire | 2062067 |
CO Springs Hazmat | Original | N | 9/18/2024 | CSFIRE | CSFIRE | | rpeterson | CO Springs Hazmat | 2062065 |
CO Springs DRE | Original | D | 9/10/2024 | SSADLER | SSADLER | Disapproved pending outcome of discussion on financial assurances and other fees. | | CO Springs DRE | 2058201 |
Health Dept. | Original | N | 9/10/2024 | HEALTHDEPT | HEALTHDEPT | Not applicable. Per Brent Mitchell, earthmoving activities are < 1 acre. Brent also stated that this project will not be on OWTS or well (no water needed at all for storage building only with no restrooms). | abrannon | Health Dept. | 2058019 |
CSU Contract Admin. | Original | D | 9/9/2024 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of an electric design fee. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees.
AMS | ASweet | CSU Contract Admin. | 2057326 |
Energy | Original | D | 9/9/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2057147 |
Mechanical | Original | D | 9/9/2024 | TCRIPPEN | TCRIPPEN | Disapproved:See section 1109 - 1110.8 of the 2021 IMC.We are requiring Refrigerant piping locations through the building, Provide roof plan showing A/C condensers locations and routing of A/C lines 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2057146 |
Electrical | Original | D | 9/9/2024 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2057091 |
Electronic Plan | Original | / | 9/9/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2057089 |
Plumbing | Original | D | 9/6/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2056848 |
Elevators | Original | D | 9/6/2024 | ERIC | ERIC | Elevator basis of design-TKE conventional hydraulic with machineroom, no generator, 2019 code. Approved submittals required to be spliced into plan set prior to issuance of elevator permit.
See E-01.1 and MP-01.1 . 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Elevators | 2056797 |
City Engr | Original | A | 9/6/2024 | JDAGNILLO | JDAGNILLO | | | City Engr | 2056730 |
CSU Water | Original | A | 9/6/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. SSM | stefanm | CSU Water | 2056463 |
CSU Waste Water | Original | N | 9/6/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. SSM | stefanm | CSU Waste Water | 2056462 |
Gas/Elec. Utils | Original | A | 9/6/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. SM | stefanm | Gas/Elec. Utils | 2056460 |
Zoning/Planning | Original | / | 9/6/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2056446 |
Construction | Original | D | 9/6/2024 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2056405 |
Electronic Plan | Original | / | 9/5/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2056021 |
Enumeration | Original | A | 9/5/2024 | AMY | AMY | Page A-0.0.1 was labeled for you with the existing storage building letters A-I. If this sheet gets changed out, add this information back to this sheet. This building is Bldg J. | | Enumeration | 2055915 |
Electronic Plan | Original | / | 9/5/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2055830 |
Energy | Original | / | 8/21/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2049678 |
Floodplain | Original | N | 8/21/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5305320001) | | Floodplain | 2049677 |