CO Springs Fire | Original | D | 2/6/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2118253 |
CO Springs DRE | Original | D | 2/6/2025 | CHUDSPETH | CHUDSPETH | Plans have been denied until planner review is complete. All CDI fees were paid on 2/6/2025 | | CO Springs DRE | 2118064 |
City Engr | Original | D | 1/29/2025 | HVO | HVO | Please see previous comment- include a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan in the electronic building permit set | | City Engr | 2114886 |
CSU Contract Admin. | Original | D | 1/28/2025 | CSUAPPSPRM | CSUAPPSPRM | Commercial Water Meter Sizing Form (CWMSF) approved however payment of applicable utility charges and fees are required.
Please contact Utilities Development Services at 719-668-8111 or cca@csu.org for questions, assistance. BS | bschifferstein | CSU Contract Admin. | 2114600 |
Gas/Elec. Utils | Original | A | 1/28/2025 | CSUREVIEW | CSUREVIEW | Comments addressed. DMM | dmakings | Gas/Elec. Utils | 2114518 |
CSU Waste Water | Original | D | 1/28/2025 | CSUREVIEW | CSUREVIEW | CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | CSU Waste Water | 2114516 |
CSU Water | Original | D | 1/28/2025 | CSUREVIEW | CSUREVIEW | Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form.
CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | CSU Water | 2114515 |
CO Springs DRE | Original | D | 1/28/2025 | SSADLER | SSADLER | Upload the final recorded plat. All private financial assurances must be posted prior to permit release. All PLDO/CDI fees must be paid prior to permit release. | | CO Springs DRE | 2114511 |
Energy | Original | D | 1/28/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2114505 |
Plumbing | Original | D | 1/28/2025 | SHANEN | SHANEN | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2114504 |
Electrical | Original | A | 1/28/2025 | DANIELG | DANIELG | | | Electrical | 2114498 |
Zoning/Planning | Original | / | 1/28/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2114486 |
Construction | Original | A | 1/28/2025 | CHRISTINEH | CHRISTINEH | | | Construction | 2114463 |
Enumeration | Original | D | 1/28/2025 | AMY | AMY | Provide a copy of the Final Recorded Plat. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2114260 |
Electronic Plan | Original | / | 1/28/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2114259 |
Submittal 2 | Original | / | 1/28/2025 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2114241 |
CO Springs Hazmat | Original | N | 1/16/2025 | CSFIRE | CSFIRE | | phil.valdez | CO Springs Hazmat | 2109332 |
CO Springs Fire | Original | D | 1/16/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | phil.valdez | CO Springs Fire | 2109331 |
Energy | Original | D | 1/14/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2108279 |
Electrical | Original | D | 1/14/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2108278 |
Mechanical | Original | A | 1/14/2025 | DALEH | DALEH | | | Mechanical | 2108276 |
Electronic Plan | Original | / | 1/14/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2108272 |
Elevators | Original | N | 1/13/2025 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2108073 |
EPC Health Dept | Original | N | 1/13/2025 | HEALTHDEPT | HEALTHDEPT | Not applicable, as earthmoving activities are < 1 acre.
Retail food establishment plan review will be required with interior finish submittal if ice and/or TCS food and beverages are sold. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/retail-food/retail-food-establishments/. Please email application and all required documents to healthinfo@elpasoco.com.
For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | EPC Health Dept | 2107964 |
City Engr | Original | D | 1/10/2025 | JDAGNILLO | JDAGNILLO | Include a copy of the approved Development Plan and a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan in the electronic building permit set. | | City Engr | 2107341 |
CO Springs DRE | Original | D | 1/10/2025 | SSADLER | SSADLER | The development plan is still in review (DEPN-24-0159). Once the record is approved, the stamped plans will need to be uploaded, The final approved landscaping and irrigation plans will need to be uploaded, all financial assurances will need to be posted, and any fees will need to be paid prior to building permit release. Please note that after the 3rd review, there will be a re review fee added. | | CO Springs DRE | 2106973 |
CSU Water | Original | D | 1/9/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. MLW | mlwilliams | CSU Water | 2106537 |
CSU Waste Water | Original | D | 1/9/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. MLW | mlwilliams | CSU Waste Water | 2106533 |
Gas/Elec. Utils | Original | D | 1/9/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ The gas regulator vent must be at least 3ft away from any electric meter socket, CT cabinet (not including cables in riser pipe or gutter) and openings like windows, doors, and garage doors. MLW | mlwilliams | Gas/Elec. Utils | 2106532 |
CSU Contract Admin. | Original | D | 1/8/2025 | CSUAPPSPRM | CSUAPPSPRM | Commercial Water Meter Sizing Form (CWMSF) under review. Payment of applicable utility charges and fees are required. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. BS | bschifferstein | CSU Contract Admin. | 2106427 |
Zoning/Planning | Original | / | 1/8/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2106204 |
Construction | Original | D | 1/8/2025 | CHRISTINEH | CHRISTINEH | Clarify if provisions of 503.1.2 are being utilized and if so, provide calculations for both buildings. If not, provide listed assembly for exterior wall per Table 705.5 / Provide fire separation distance * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2106201 |
Plumbing | Original | D | 1/8/2025 | SHANEN | SHANEN | Water pipe size analysis must reference 2021 IPC. CSU approved construction drawings and utility service plan required to verify the plumbing plans correspond with the CSU approved plans for water service sizing, water entry location, building drain sizing, building drain location, grease interceptor location, etc. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2105963 |
Electronic Plan | Original | / | 1/7/2025 | CHRISTINEH | CHRISTINEH | In Current Review by CHRISTINEH | | Electronic Plan | 2105830 |
Enumeration | Original | D | 1/7/2025 | AMY | AMY | 1.Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. 2.A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). 3.Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt 4.A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2105679 |
Electronic Plan | Original | / | 1/7/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2105661 |
Energy | Original | / | 12/30/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2103227 |
Floodplain | Original | N | 12/30/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5331202034) | | Floodplain | 2103226 |