Energy | Original | A | 3/6/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2127803 |
Electrical | Original | N | 3/6/2025 | DANIELG | DANIELG | No electrical scope of work. | | Electrical | 2127802 |
Electronic Plan | Original | / | 3/6/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2127782 |
CO Springs DRE | Original | A | 3/5/2025 | MAMBUUL | MAMBUUL | Approved for commercial exterior remodel for addition of concrete ramp, and new exterior doors, and windows. Plans are still consistent with approved development plans. No change to setbacks or lot coverage. | | CO Springs DRE | 2127524 |
Mechanical | Original | N | 3/5/2025 | DALEH | DALEH | | | Mechanical | 2127342 |
CSU Water | Original | N | 3/5/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building.
Ensure 811 locate is called prior to any digging to ensure utility service lines are not impacted.MDA | malcuran | CSU Water | 2127174 |
CSU Waste Water | Original | N | 3/5/2025 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building per submitted plans.MDA | malcuran | CSU Waste Water | 2127173 |
Zoning/Planning | Original | / | 3/5/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2127163 |
Plumbing | Original | N | 3/5/2025 | SHANEN | SHANEN | | | Plumbing | 2127158 |
Construction | Original | A | 3/4/2025 | DANM | DANM | | | Construction | 2127141 |
Enumeration | Original | D | 3/4/2025 | AMY | AMY | Remove suite 110 & all other suite numbers from all pages of this plan since this is to the Core & Shell and no suite number applies. Also, remove suite numbers from the title blocks. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2127074 |
Electronic Plan | Original | / | 3/4/2025 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 2126887 |
Floodplain | Original | N | 3/3/2025 | KEITH | KEITH | | | Floodplain | 2126680 |
Enumeration | Original | D | 3/3/2025 | AMY | AMY | Code study form needs to have the suite number for the scope of work. Architectural sheets show suite 100 for the scope of work, to include a lot of pages that do not apply. The site plan is the development plan. Please only include the scope of work, with a single sheet showing the entire lot with building and cloud the area of work. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2126499 |
Electronic Plan | Original | / | 3/3/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2126485 |
Energy | Original | / | 1/13/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2107939 |
Floodplain | Original | / | 1/13/2025 | RBD GIS | RBD GIS | Autogenerated Review: Floodplain status unknown. (Parcel: 5505001011) | | Floodplain | 2107938 |