| Original | / | 3/6/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2128290 |
| Original | / | 3/6/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2128219 |
Submittal 5 | Original | / | 3/6/2025 | QUINTONW | QUINTONW | Submittal #5 | | Submittal 5 | 2128218 |
Energy | Original | D | 3/5/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2127461 |
Plumbing | Original | D | 3/5/2025 | SHANEN | SHANEN | SP-1 discharge shall be directly connected to the plumbing drainage system. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2127460 |
| Original | / | 3/5/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2127443 |
| Original | / | 3/5/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2127436 |
Submittal 4 | Original | / | 3/5/2025 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2127435 |
Energy | Original | D | 3/5/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2127279 |
Electrical | Original | A | 3/5/2025 | RICHG | RICHG | | | Electrical | 2127278 |
Plumbing | Original | D | 3/4/2025 | SHANEN | SHANEN | SP-1 discharge shall be directly connected to the plumbing system. Clarify how piping is pumped discharge if SP-1 is downstream. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2126801 |
| Original | / | 3/3/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2126676 |
| Original | / | 3/3/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2126672 |
Submittal 3 | Original | / | 3/3/2025 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2126671 |
CO Springs DRE | Original | A | 2/26/2025 | CVANAPPLEDORN | CVANAPPLEDORN | Commercial interior remodel. No change of use or occupancy. Remodeling interior with a connection between two existing suites. | | CO Springs DRE | 2124865 |
EPC Health Dept | Original | A | 2/21/2025 | HEALTHDEPT | HEALTHDEPT | Per AR on 2/4/25, body art facility approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. AB | abrannon | EPC Health Dept | 2123905 |
Energy | Original | D | 2/19/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2122473 |
Electrical | Original | D | 2/19/2025 | BERTHA | BERTHA | Comply with previous review comment - Verify compliance with 210.25(B) and 240.24(B) NEC
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2122472 |
Electronic Plan | Original | / | 2/19/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2122406 |
Plumbing | Original | A | 2/18/2025 | SHANEN | SHANEN | | | Plumbing | 2121573 |
Zoning/Planning | Original | / | 2/18/2025 | CVANAPPLEDORN | CVANAPPLEDORN | In Current Review by CVANAPPLEDORN | | Zoning/Planning | 2121569 |
Submittal 2 | Original | / | 2/18/2025 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2121509 |
Energy | Original | D | 2/12/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2120319 |
Electrical | Original | D | 2/12/2025 | BERTHA | BERTHA | Verify compliance with 210.25(B) and 240.24(B) NEC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2120318 |
Electronic Plan | Original | / | 2/12/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2120280 |
Electronic Plan | Original | / | 2/12/2025 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2120279 |
CO Springs Fire | Original | A | 2/10/2025 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | CO Springs Fire | 2119318 |
CO Springs Hazmat | Original | N | 2/10/2025 | CSFIRE | CSFIRE | NA | Jacob.Watson | CO Springs Hazmat | 2119317 |
CO Springs DRE | Original | D | 2/3/2025 | SSADLER | SSADLER | List the current business of suite 2129. | | CO Springs DRE | 2116383 |
Mechanical | Original | N | 1/31/2025 | TREVORH | TREVORH | Not Applicable; No new Mechanical scope. | | Mechanical | 2116120 |
Zoning/Planning | Original | / | 1/31/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2115961 |
CSU Waste Water | Original | N | 1/31/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building. DMM | dmakings | CSU Waste Water | 2115868 |
Plumbing | Original | D | 1/31/2025 | SHANEN | SHANEN | Reference 2021 IPC tables. Table E201.1 is not located in 2021 IPC appendix E. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2115866 |
CSU Water | Original | N | 1/31/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building. DMM | dmakings | CSU Water | 2115864 |
EPC Health Dept | Original | D | 1/31/2025 | HEALTHDEPT | HEALTHDEPT | Body art facility plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. KB | KBauer | EPC Health Dept | 2115850 |
Construction | Original | A | 1/31/2025 | SHELLEY | SHELLEY | | | Construction | 2115835 |
Electronic Plan | Original | / | 1/31/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2115773 |
Enumeration | Original | N | 1/29/2025 | BECKYA | BECKYA | Combining with 2129 using 2131 N Weber St. | | Enumeration | 2114897 |
Electronic Plan | Original | / | 1/29/2025 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2114896 |
Energy | Original | / | 1/28/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2114705 |
Floodplain | Original | N | 1/28/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6406118002) | | Floodplain | 2114704 |