Energy | Original | D | 2/27/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2125601 |
Mechanical | Original | D | 2/27/2025 | DALEH | DALEH | Provide FSD Waiting on elevator comments * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2125600 |
Electrical | Original | D | 2/26/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2125075 |
Plumbing | Original | D | 2/26/2025 | SHANEN | SHANEN | Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Bottle filler station does not comply with section 410.3. ADA not enforced. ICC A117.1-2017 compliance required and water closet must also comply with this standard. Provide a water heater schedule. Provide required water pipe size analysis data, see 2021 IPC appendix E. Provide a water distribution isometric drawing. Elevator review comments must be addressed. Water heater detail must show compliance with 2021 IECC section 404.3. Clarify the elevator sump discharge. A mop sink with a 3" trap and waste is undersized to serve the minimum 50 gpm sump discharge. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2124923 |
Elevators | Original | D | 2/25/2025 | ROBERTV | ROBERTV | See pages: A0.0, A4.0, M1.1, P0.5, E0.5, E0.6, E1.2
RBD Note: Layouts provided for TKE Endura Hydraulic Machine Room-Less w/o generator power. A17.1 - 2019, 2023 RBC. . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Elevators | 2124659 |
CO Springs Fire | Original | D | 2/20/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2123183 |
CO Springs Hazmat | Original | N | 2/20/2025 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2123174 |
CO Springs DRE | Original | D | 2/13/2025 | MAMBUUL | MAMBUUL | 1. Need to upload approved development plans stamped by land use review to permit for conditional use. Plans are in review by land use review. 2. CDI fees and financial assurances may be applicable once application is approved. | | CO Springs DRE | 2120962 |
CSU Water | Original | N | 2/12/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building. Backflow preventer compliant/conforming.MDA | malcuran | CSU Water | 2120236 |
CSU Waste Water | Original | N | 2/12/2025 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2120234 |
Zoning/Planning | Original | / | 2/12/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2120177 |
Construction | Original | D | 2/12/2025 | CHRISTINEH | CHRISTINEH | See architecturals * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2120145 |
Electronic Plan | Original | / | 2/11/2025 | CHRISTINEH | CHRISTINEH | In Current Review by CHRISTINEH | | Electronic Plan | 2119768 |
Enumeration | Original | D | 1/30/2025 | AMY | AMY | How tall will the perimeter fence be? If it is 7’ or under no address or permit required. If over 7’ than an address will be assigned and a separate permit will be required. Please clarify. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2115412 |
Electronic Plan | Original | / | 1/30/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2115359 |
Energy | Original | / | 1/29/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2114971 |
Floodplain | Original | N | 1/29/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6415414112) | | Floodplain | 2114970 |