CO Springs Fire | Original | D | 2/20/2025 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | chiptaylor | CO Springs Fire | 2123244 |
CO Springs Hazmat | Original | N | 2/20/2025 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2123241 |
Energy | Original | D | 2/20/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2122690 |
Mechanical | Original | D | 2/20/2025 | TCRIPPEN | TCRIPPEN | Disapproved: Clarify if this is to be a shaft or chase ? VB changing from VA * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2122689 |
Electrical | Original | D | 2/14/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2121308 |
Electronic Plan | Original | / | 2/14/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2121297 |
CO Springs DRE | Original | D | 2/14/2025 | MAMBUUL | MAMBUUL | 1. Need to upload approved minor modification stamped by land use review to permit. Application is still in review by land use review. 2, Final landscape and irrigation plans will need to be uploaded to permit upon land use review approval. 3. Need to upload recorded plat to permit. 4. CDI fees and financial assurances may be due upon approval letter from land use review. | | CO Springs DRE | 2121053 |
Plumbing | Original | D | 2/13/2025 | SHANEN | SHANEN | Preliminary review.Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. See link: https://www.pprbd.org/File/ByAlias/PlumbingReview. Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans.Construction review comments must be addressed.Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc.Provide a piping materials schedule on the plumbing plans per PPRBD plumbing plan review requirements.CSU Water Dept. comments must be addressed. All gas piping related items shall be on the mechanical plans.Remove all references to gas piping from the plumbing plans. 3/4"CW is undersized to serve downstream fixtures. Provide isometric drawing and/or riser diagram for complete water distribution system.Provide sizing for each section, branch and riser. Clarify how a drinking fountain located on the second floor is in compliance with section 403.5. Provide required CSU variance letter for the indoor grease interceptor. Contact Robert Bowren at 719-668-1735 or fog@csu.org.CSU indoor grease interceptor variance letter will regulate which fixtures are required to discharge through the grease interceptor. Provide isometric drawing and/or riser diagram for the complete DWV system.Provide sizing for each section, branch and stack. Water heater detail must show compliance with IECC section C404.3. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2120467 |
Electronic Plan | Original | / | 2/13/2025 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 2120436 |
CSU Water | Original | D | 2/12/2025 | CSUREVIEW | CSUREVIEW | Please update the City Approved Development Plan. CSU comments need to be addressed on that DP set.
Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans.MDA | malcuran | CSU Water | 2120347 |
CSU Waste Water | Original | N | 2/12/2025 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2120341 |
Zoning/Planning | Original | / | 2/12/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2120313 |
EPC Health Dept | Original | D | 2/12/2025 | HEALTHDEPT | HEALTHDEPT | Childcare facility plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/child-care/. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. BR | brothrock | EPC Health Dept | 2120295 |
Construction | Original | D | 2/12/2025 | SHELLEY | SHELLEY | See Code Study Form, assembly issues/omissions, Life safety plan issues, accessibility issues, more on plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2120294 |
Electronic Plan | Original | / | 2/11/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2119409 |
Enumeration | Original | N | 2/5/2025 | AMY | AMY | | | Enumeration | 2117509 |
Electronic Plan | Original | / | 2/4/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2117219 |
Energy | Original | / | 2/4/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2117189 |
Floodplain | Original | N | 2/4/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6418315017) | | Floodplain | 2117188 |