Energy | Original | D | 6/2/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2165485 |
Electrical | Original | D | 6/2/2025 | BERTHA | BERTHA | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2165484 |
Electronic Plan | Original | / | 6/2/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2165426 |
EPC Health Dept | Original | D | 5/30/2025 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. Sequence C199717, C199718, C199720 | tguerrero | EPC Health Dept | 2165030 |
CSU Contract Admin. | Original | D | 5/30/2025 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of electric design fee. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate.
AMS | ASweet | CSU Contract Admin. | 2164704 |
Mechanical | Original | A | 5/30/2025 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2164687 |
Electronic Plan | Original | / | 5/30/2025 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Electronic Plan | 2164674 |
Plumbing | Original | D | 5/30/2025 | SHANEN | SHANEN | P002: Piping insulation material schedule must include thickness, material (fiberglass, elastomeric foam, etc.) and manufacturer. P151: Plumbing plans must correspond with the civil plans. P151, P251: Building 5 is a type C per referenced civil plans.Provide floor plans and riser diagrams for type B. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2164639 |
Gas/Elec. Utils | Original | D | 5/29/2025 | CSUREVIEW | CSUREVIEW | See previous comments. Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | Gas/Elec. Utils | 2164570 |
Construction | Original | D | 5/29/2025 | BRIANB | BRIANB | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2164564 |
Electronic Plan | Original | / | 5/28/2025 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2163432 |
Enumeration | Original | D | 5/22/2025 | BECKYA | BECKYA | Enumerations approval pending. A review of the mylar (pre-plat) is required, along with the plat fees prior to the plat being recorded. Once the final plat for Venture on Venetucci Fil No. 1 has been recorded please send us a copy of the recorded plat for our records and we can approve plans for this development. Okay to email Becky Allen directly (beckya@pprbd.org) . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2161906 |
Electronic Plan | Original | / | 5/22/2025 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2161881 |
Submittal 2 | Original | / | 5/21/2025 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2161805 |
County Zoning | Original | D | 5/21/2025 | DSDMATHY2 | DSDMATHY2 | The project is not approved within the planning department. The associated Site Development Plan is PPR2444. Once the project is approved, please re submit with the approved and stamped off SDP documents.
Thank you. | | County Zoning | 2161537 |
Stratmoor Hills Water | Original | A | 5/16/2025 | STRATMOORWSD | STRATMOORWSD | Please indicate curb stops as to mark maintenance line or Prperty line | nancy@stratmoorhills | Stratmoor Hills Water | 2159621 |
Stratmoor Hills Waste Water | Original | A | 5/16/2025 | STRATMOORWSD | STRATMOORWSD | | nancy@stratmoorhills | Stratmoor Hills Waste Water | 2159618 |
Stratmoor Hills Hazmat | Original | N | 5/7/2025 | STRATMOORFIRE | STRATMOORFIRE | NA MAS for SHVFD | Stratmoorfd | Stratmoor Hills Hazmat | 2155591 |
Stratmoor Hills Fire | Original | A | 5/7/2025 | STRATMOORFIRE | STRATMOORFIRE | Fire Sprinklers and Fire Alarms require a separate submittal directly to the Stratmoor Hills Fire Department. OK MAS for SHVFD | Stratmoorfd | Stratmoor Hills Fire | 2155589 |
Electrical | Original | D | 4/25/2025 | BERTHA | BERTHA | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2150613 |
Energy | Original | D | 4/25/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2150614 |
Plumbing | Original | D | 4/23/2025 | SHANEN | SHANEN | Preliminary review. Provide a piping insulation schedule, code tables are not an acceptable substitute. Provide a two way fitting or two riser clean-out at the junction of the building drain and building sewer in compliance with CO state amendment to section 708.1.3. 1-1/2" standpipe serving WB-1 is not in compliance with section 406.2. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2149356 |
EPC Health Dept | Original | D | 4/22/2025 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. Sequence C199717,C199718 and C199719. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2148741 |
Mechanical | Original | D | 4/21/2025 | TCRIPPEN | TCRIPPEN | Disapproved see constructions note. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2148438 |
Electronic Plan | Original | / | 4/21/2025 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Electronic Plan | 2148330 |
Electronic Plan | Original | / | 4/21/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2148294 |
Elevators | Original | N | 4/18/2025 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2147970 |
Gas/Elec. Utils | Original | D | 4/18/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | Gas/Elec. Utils | 2147835 |
CSU Contract Admin. | Original | D | 4/18/2025 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of development charges/fees. Contact Customer Contract Administration at 719-668-8111 for more information. BS | bschifferstein | CSU Contract Admin. | 2147821 |
Zoning/Planning | Original | / | 4/18/2025 | DSDMATHY2 | DSDMATHY2 | In Current Review by DSDMATHY2 | | Zoning/Planning | 2147805 |
Construction | Original | D | 4/18/2025 | BRIANB | BRIANB | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2147790 |
Electronic Plan | Original | / | 3/28/2025 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2137837 |
Floodplain | Original | N | 3/28/2025 | KEITH | KEITH | | | Floodplain | 2137766 |
Enumeration | Original | D | 3/27/2025 | BECKYA | BECKYA | Enumerations approval pending. A review of the mylar (pre-plat) is required, along with the plat fees prior to the plat being recorded. Once the final plat for Venture on Venetucci Fil No. 1 has been recorded please send us a copy of the recorded plat for our records and we can approve plans for this development. Okay to email Becky Allen directly (beckya@pprbd.org) . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2137086 |
Electronic Plan | Original | / | 3/27/2025 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2137023 |
Energy | Original | / | 3/21/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2134513 |
Floodplain | Original | / | 3/21/2025 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 6504300049) | | Floodplain | 2134512 |