Stratmoor Hills Hazmat | Original | A | 6/3/2025 | STRATMOORFIRE | STRATMOORFIRE | Below Permit Quantities of HAZMAT MUS for SHFPD | Stratmoorfd | Stratmoor Hills Hazmat | 2165856 |
Mechanical | Original | D | 5/27/2025 | TCRIPPEN | TCRIPPEN | Disapproved pending construction * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2163355 |
Energy | Original | D | 5/27/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2163327 |
County Zoning | Original | D | 5/27/2025 | DSDBENSON2 | DSDBENSON2 | Final Plat (EDARP File No. SF2431) and Site Development Plan (EDARP File No. PPR2444) are still in review with County Zoning. | | County Zoning | 2163144 |
Plumbing | Original | D | 5/27/2025 | SHANEN | SHANEN | P003: Piping insulation material schedule must include material (fiberglass, elastomeric foam, etc.) and manufacturer. P191.1: Show water meter and backflow preventer location. Provide a water entry detail. P191.1, P192.1: All gas piping related items shall be on the mechanical plans. Remove all references to gas piping from the plumbing plans. P192.1: 3/4" CW is undersized to serve downstream fixtures. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2162817 |
EPC Health Dept | Original | D | 5/23/2025 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. AM | Amanda Furno | EPC Health Dept | 2162651 |
Electrical | Original | D | 5/23/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2162620 |
CSU Contract Admin. | Original | D | 5/23/2025 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of applicable utility charges/fees. Please contact our office at 719-668-8111 for additional information on charges/fees and to request an estimate.
AMS | ASweet | CSU Contract Admin. | 2162597 |
Gas/Elec. Utils | Original | D | 5/23/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | Gas/Elec. Utils | 2162549 |
Zoning/Planning | Original | / | 5/23/2025 | DSDBENSON2 | DSDBENSON2 | In Current Review by DSDBENSON2 | | Zoning/Planning | 2162540 |
Construction | Original | D | 5/23/2025 | SHELLEY | SHELLEY | Several items still not addressed. See plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2162535 |
Electronic Plan | Original | / | 5/23/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2162452 |
Enumeration | Original | D | 5/21/2025 | AMY | AMY | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2161714 |
Electronic Plan | Original | / | 5/21/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2161712 |
Submittal 2 | Original | / | 5/21/2025 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2161350 |
Stratmoor Hills Water | Original | A | 5/16/2025 | STRATMOORWSD | STRATMOORWSD | Please indicate curb stops as to mark maintenance line or Prperty line | nancy@stratmoorhills | Stratmoor Hills Water | 2159633 |
Stratmoor Hills Waste Water | Original | A | 5/16/2025 | STRATMOORWSD | STRATMOORWSD | | nancy@stratmoorhills | Stratmoor Hills Waste Water | 2159632 |
Stratmoor Hills Hazmat | Original | D | 5/7/2025 | STRATMOORFIRE | STRATMOORFIRE | Need a HAZMAT inventory statement, please list all of the chemicals to be stored in the pool room. | Stratmoorfd | Stratmoor Hills Hazmat | 2155571 |
Stratmoor Hills Fire | Original | A | 5/7/2025 | STRATMOORFIRE | STRATMOORFIRE | A separate submittal for the Fire Alarm system shall be made directly to the Stratmoor Hills Fire Department. OK MAS for SHVFD | Stratmoorfd | Stratmoor Hills Fire | 2155569 |
Energy | Original | D | 4/18/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2147598 |
Mechanical | Original | D | 4/18/2025 | TCRIPPEN | TCRIPPEN | Disapproved: furnaces to be 95 % per the IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2147597 |
Electrical | Original | D | 4/16/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2146481 |
Electronic Plan | Original | / | 4/16/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2146468 |
Plumbing | Original | D | 4/16/2025 | SHANEN | SHANEN | Provide a piping insulation schedule, code tables are not an acceptable substitute. Provided water pipe size analysis data is incomplete. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. 3/4"CW is undersized to serve downstream fixtures. Show sinks indicated on the architectural plans. Provide a two way fitting or two riser clean-out at the junction of the building drain and building sewer in compliance with CO state amendment to section 708.1.3. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2146374 |
Elevators | Original | N | 4/15/2025 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2146339 |
EPC Health Dept | Original | D | 4/15/2025 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | EPC Health Dept | 2146259 |
Gas/Elec. Utils | Original | D | 4/14/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. CJS | cjsavage | Gas/Elec. Utils | 2144530 |
County Zoning | Original | D | 4/14/2025 | DSDRANGEL | DSDRANGEL | The site development plan is not approved by EPC Planning. Upload a copy of the approved SDP once received. | | County Zoning | 2144454 |
CSU Contract Admin. | Original | D | 4/14/2025 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of development charges/fees. Please contact Customer Contract Administration at 719-668-8111 for additional information on charges/fees. BS | bschifferstein | CSU Contract Admin. | 2144302 |
Construction | Original | D | 4/14/2025 | BRIANB | BRIANB | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2144286 |
Electronic Plan | Original | / | 3/27/2025 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2137174 |
Floodplain | Original | N | 3/27/2025 | AMY | AMY | | | Floodplain | 2137163 |
Enumeration | Original | D | 3/27/2025 | AMY | AMY | A review of the mylar (pre-plat) is required, along with the plat fees prior to the plat being recorded. A copy of the final recorded plat is required prior to Enumerations approving this plan. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2137160 |
Electronic Plan | Original | / | 3/27/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2137082 |
Energy | Original | / | 3/21/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2134518 |
Floodplain | Original | / | 3/21/2025 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 6504300049) | | Floodplain | 2134517 |