Energy | Original | D | 6/9/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2168514 |
Mechanical | Original | D | 6/9/2025 | TCRIPPEN | TCRIPPEN | Disapproved: Provide Ventilation schedule per the IMC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2168513 |
CO Springs DRE | Original | D | 6/6/2025 | MAMBUUL | MAMBUUL | 1. Please upload the recorded plat to the permit. 2. Please upload the final landscape and irrigation plan set stamped by land use review to the permit. 3. PLDO and CDI fees are due prior to building permit approval, see approval letter, DEPN-24-0134. Contact DREplanninginfo@coloradosprings.gov to pay fees. 4. Need to provide financial assurances for public and private improvements prior to building permit approval. | | CO Springs DRE | 2168208 |
Zoning/Planning | Original | / | 6/6/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2168203 |
Electrical | Original | D | 6/6/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2167909 |
Electronic Plan | Original | / | 6/6/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2167885 |
Plumbing | Original | D | 6/6/2025 | SHANEN | SHANEN | Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. All gas piping and condensate piping related items shall be on the mechanical plans.Remove ALL references to gas piping and condensate piping from the plumbing plans. Piping insulation material schedule must include thickness, material (fiberglass, elastomeric foam, etc.) and manufacturer. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. CSU approved construction drawings and utility service plan required to verify the plumbing plans correspond with the CSU approved plans for water service sizing, water entry location, building drain sizing, building drain location, etc. Laundry must show compliance with section 413.4 and 1003.6. Expansion tank manufacturer/model number (Regtrol XT-5) could not be verified. Expansion tank (Therma-x-trol XT-5) is for residential use only per manufacturer. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2167820 |
Elevators | Original | N | 6/5/2025 | ROBERTV | ROBERTV | No Conveyances. Note: One of many plans for Bradley Ridge Apartments | | Elevators | 2167812 |
CO Springs Fire | Original | D | 6/5/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2167209 |
CO Springs Hazmat | Original | N | 6/5/2025 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2167208 |
EPC Health Dept | Original | D | 6/4/2025 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | EPC Health Dept | 2167082 |
Zoning/Planning | Original | / | 6/4/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2167066 |
CSU Water | Original | D | 6/4/2025 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions.MDA | malcuran | CSU Water | 2167001 |
CSU Waste Water | Original | D | 6/4/2025 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions.MDA | malcuran | CSU Waste Water | 2167000 |
Gas/Elec. Utils | Original | D | 6/4/2025 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions.MDA | malcuran | Gas/Elec. Utils | 2166998 |
City Engr | Original | D | 6/4/2025 | HVO | HVO | Please include a signed copy of the approved Grading & Erosion Control Plan from the Stormwater Enterprise. | | City Engr | 2166977 |
CSU Contract Admin. | Original | D | 6/4/2025 | CSUAPPSPRM | CSUAPPSPRM | Requires submittal and approval of Commercial Water Meter Sizing Form (CWMSF) and payment of development charges/fees. CWMSF available at https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf. Contact Customer Contract Administration at 719-668-8111 for more information. BS | bschifferstein | CSU Contract Admin. | 2166976 |
Construction | Original | D | 6/4/2025 | BRIANB | BRIANB | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2166813 |
Electronic Plan | Original | / | 5/30/2025 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2164931 |
Enumeration | Original | D | 5/30/2025 | AMY | AMY | The approval of this plan is pending the review of the mylar(replat), collecting the plat fees and a copy of the final recorded plat. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2164840 |
Electronic Plan | Original | / | 5/30/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2164829 |
Energy | Original | / | 5/14/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2158621 |
Floodplain | Original | N | 5/14/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5500000513) | | Floodplain | 2158620 |