Energy | Original | A | 7/17/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2185599 |
Electrical | Original | A | 7/17/2025 | DANIELG | DANIELG | | | Electrical | 2185598 |
Zoning/Planning | Original | / | 7/17/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2185487 |
Enumeration | Original | N | 7/16/2025 | BRENT | BRENT | | | Enumeration | 2185411 |
Electronic Plan | Original | / | 7/16/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2185392 |
Submittal 2 | Original | / | 7/16/2025 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2185167 |
CO Springs Hazmat | Original | D | 6/5/2025 | CSFIRE | CSFIRE | Need detailed floor plan of where the EV charger is to be located, need ESO location, Need UL listing, Need vehicle impact protection, need signage. DFM-C-DC-25-00006 Submitted By: Stanwood, Mark Antone,Submitted By: Stanwood, Mark Antone DFM-C-DC-25-00006 | mark.stanwood@colora | CO Springs Hazmat | 2167235 |
CO Springs DRE | Original | D | 6/3/2025 | SSADLER | SSADLER | Schedule a pre application meeting to discuss the level 3 chargers. | | CO Springs DRE | 2166469 |
CO Springs Fire | Original | N | 5/30/2025 | CSFIRE | CSFIRE | No Fire Final HAZ-MAT REVIEW REQUIRED Based upon the information provided, a hazardous materials review is required. Your plans have been forwarded to the HazMat reviewer. | Jacob.Watson | CO Springs Fire | 2164787 |
Energy | Original | D | 5/29/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2164291 |
Mechanical | Original | N | 5/29/2025 | DALEH | DALEH | | | Mechanical | 2164290 |
Zoning/Planning | Original | / | 5/28/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2163803 |
Plumbing | Original | N | 5/28/2025 | SHANEN | SHANEN | | | Plumbing | 2163584 |
CSU Water | Original | N | 5/28/2025 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final electric meter, transformer and service line locations. Contact Field Engineering at 719-668-5564 (Electric) with any questions. No new water service outside of building.MDA | malcuran | CSU Water | 2163533 |
CSU Waste Water | Original | N | 5/28/2025 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2163531 |
Electrical | Original | D | 5/28/2025 | DANIELG | DANIELG | Commercial plans require a Colorado design professional stamp. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2163508 |
Electronic Plan | Original | / | 5/28/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2163493 |
Enumeration | Original | N | 5/28/2025 | BRENT | BRENT | | | Enumeration | 2163477 |
Electronic Plan | Original | / | 5/28/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2163464 |
Energy | Original | / | 5/27/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2163257 |
Floodplain | Original | N | 5/27/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6312219001) | | Floodplain | 2163255 |