| Electronic Plan | Original | / | 10/30/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2231151 |
| Mechanical | Original | D | 10/30/2025 | TCRIPPEN | TCRIPPEN | Disapproved remove clouds this is not a splice * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2230853 |
| Plumbing | Original | D | 10/30/2025 | SHANEN | SHANEN | Construction review comments regarding occupant load must be addressed to verify compliance with section 403.1. All gas piping related items shall be on the mechanical plans. Remove all references to gas piping from the plumbing plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2230747 |
| Construction | Original | D | 10/30/2025 | BPHILLIPS | BPHILLIPS | Revise occupant load calculation, provide stamped IECC page one indicating additional energy efficiency option(s). * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2230732 |
| Electronic Plan | Original | / | 10/30/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2230677 |
| Enumeration | Original | A | 10/29/2025 | BECKYA | BECKYA | | | Enumeration | 2230192 |
| | Original | / | 10/29/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2230093 |
| | Original | / | 10/29/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2230056 |
| Submittal 3 | Original | / | 10/29/2025 | QUINTONW | QUINTONW | Submittal #3 | | Submittal 3 | 2230055 |
| Energy | Original | D | 10/8/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2221419 |
| Mechanical | Original | D | 10/8/2025 | TCRIPPEN | TCRIPPEN | Disapproved see constructions notes * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2221418 |
| Tri-Lakes Hazmat (CSFD) | Original | N | 10/8/2025 | CSFIRE | CSFIRE | See Fire comments | phil.valdez | Tri-Lakes Hazmat (CSFD) | 2220983 |
| Tri-Lakes Fire (CSFD) | Original | D | 10/8/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | phil.valdez | Tri-Lakes Fire (CSFD) | 2220981 |
| Electrical | Original | D | 10/8/2025 | BERTHA | BERTHA | Provide fault current information for new refrigeration and air conditioning equipment in the short circuit summary.
Recessed lighting must be shown on the lighting schedule and comply with C402.5.10.
Vestibules must be identified on plans as conditioned or unconditioned. If the vestibule is conditioned or an air curtain is specified, show compliance with C403.4.1.4.
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
Controlled receptacles must be shown on the plan per C405.11 and the symbol used to mark these receptacles must be as shown in article 406.3(E) of the adopted National Electrical Code (NEC) - Conference Room
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.” . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2220850 |
| Electronic Plan | Original | / | 10/7/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2220609 |
| Plumbing | Original | D | 10/7/2025 | SHANEN | SHANEN | Plumbing plan review stopped and incomplete. Provide sheet PSS1.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2220252 |
| Construction | Original | D | 9/30/2025 | BPHILLIPS | BPHILLIPS | This is not an existing warehouse, but only a shell. Revise plan and code study form to reflect only the proposed scope of interior finish for the office space. Missing stamp from IECC form. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2217752 |
| Electronic Plan | Original | / | 9/30/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2217377 |
| Enumeration | Original | A | 9/29/2025 | BECKYA | BECKYA | Ste 100 | | Enumeration | 2217118 |
| Electronic Plan | Original | / | 9/29/2025 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2217087 |
| Submittal 2 | Original | / | 9/29/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2217043 |
| Electrical | Original | D | 9/15/2025 | BERTHA | BERTHA | Clarify the scope of work for the Finish. All work that was part of the Core and Shell should be shown as existing.
Complete re-review necessary. . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2211190 |
| Energy | Original | D | 9/15/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2211191 |
| Electronic Plan | Original | / | 9/15/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2211062 |
| Tri-Lakes Hazmat (CSFD) | Original | D | 9/15/2025 | CSFIRE | CSFIRE | SEE FIRE COMMENTS | michael.davis1@color | Tri-Lakes Hazmat (CSFD) | 2210929 |
| Tri-Lakes Fire (CSFD) | Original | D | 9/15/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | michael.davis1@color | Tri-Lakes Fire (CSFD) | 2210928 |
| Plumbing | Original | D | 9/9/2025 | SHANEN | SHANEN | Construction review comments regarding occupant load must be addressed to verify compliance with section 403.1. All gas piping related items shall be on the mechanical plans. Provide required water pipe size analysis data, see 2021 IPC appendix E. Water heater detail must show compliance with 2021 IECC section 404.3. Provide a piping insulation materials schedule. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2208498 |
| Mechanical | Original | D | 9/8/2025 | TCRIPPEN | TCRIPPEN | Need occupant load * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2208117 |
| Construction | Original | D | 9/8/2025 | BPHILLIPS | BPHILLIPS | Occupant load, IECC, accessibility * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2207988 |
| Electronic Plan | Original | / | 9/8/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2207588 |
| Enumeration | Original | A | 9/8/2025 | BECKYA | BECKYA | Bldg appears to be single tenant | | Enumeration | 2207535 |
| Electronic Plan | Original | / | 9/8/2025 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2207534 |
| | Original | / | 9/5/2025 | SYSTEM | SYSTEM | Plan Review fees paid 09/05/2025 for plan submitted 08/25/2025. Submit Date updated to now. Plan now open for review. | | | 2207429 |
| Waste Water Div | Original | / | 8/25/2025 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 2202256 |
| Water Division | Original | / | 8/25/2025 | SYSTEM | SYSTEM | You will need to contact Water Division department for approval prior to permit. This department will not review the plan electronically. | | Water Division | 2202255 |
| Energy | Original | / | 8/25/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2202254 |
| Floodplain | Original | N | 8/25/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7135004002) | | Floodplain | 2202253 |