Energy | Original | D | 10/9/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2221668 |
Plumbing | Original | D | 10/9/2025 | SHANEN | SHANEN | Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. All gas piping and condensate piping related items shall be on the mechanical plans.Remove all references to gas piping and condensate piping from the plumbing plans. Provide a two way fitting or two riser clean-out at the junction of the building drain and building sewer in compliance with CO state amendment to section 708.1.3. Provide gpm and/or square footage served by each component of the roof drainage system. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2221667 |
Falcon Fire (CSFD) | Original | A | 10/8/2025 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources. If you do not have an ACA account at the time of CSFD review, you will need to reach out to the CSFD DFM staff to link the review to your account. DFM Plan Review Fee: $296.00 ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | Falcon Fire (CSFD) | 2220970 |
Falcon Hazmat (CSFD) | Original | N | 10/8/2025 | CSFIRE | CSFIRE | NA | Jacob.Watson | Falcon Hazmat (CSFD) | 2220969 |
Electrical | Original | D | 10/6/2025 | BERTHA | BERTHA | Remove parallel neutral - remove equipment ground from service conductor.
Comply with 250.122 NEC
Comply with 110.26(D) NEC
Provide fault current information (SCCR, AIC, SCA) at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2219588 |
Electronic Plan | Original | / | 10/6/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2219585 |
Mechanical | Original | D | 10/3/2025 | DALEH | DALEH | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2219458 |
Elevators | Original | N | 10/3/2025 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2219336 |
County Zoning | Original | A | 10/1/2025 | DSDDEAN2 | DSDDEAN2 | Planning and Community Development Fil No PPR256 was approved on 8/11/2025 with comments below from DPW Engineer.
Road Impact fees are applicable to be paid at time of building permit. Office $3,340/1,000 SF. $3,340 x 7.543 KSF = $25,193.62 https://publicworks.elpasoco.com/road-impact-fees/
Review by: Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864 | | County Zoning | 2218366 |
EPC Health Dept | Original | N | 9/30/2025 | HEALTHDEPT | HEALTHDEPT | Not applicable. TG | tguerrero | EPC Health Dept | 2217951 |
Gas/Elec. Utils | Original | A | 9/30/2025 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. Approved development plan drawings provided with permit set.MDA | malcuran | Gas/Elec. Utils | 2217863 |
Zoning/Planning | Original | / | 9/30/2025 | DSDDEAN2 | DSDDEAN2 | In Current Review by DSDDEAN2 | | Zoning/Planning | 2217385 |
Construction | Original | D | 9/29/2025 | BPHILLIPS | BPHILLIPS | Utility room rating, IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2217319 |
Electronic Plan | Original | / | 9/29/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2216745 |
Enumeration | Original | A | 9/24/2025 | AMY | AMY | | | Enumeration | 2215543 |
Electronic Plan | Original | / | 9/24/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2215520 |
| Original | / | 9/24/2025 | SYSTEM | SYSTEM | Plan Review fees paid 09/24/2025 for plan submitted 09/23/2025. Submit Date updated to now. Plan now open for review. | | | 2215031 |
Energy | Original | / | 9/23/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2214627 |
Waste Water Div | Original | / | 9/23/2025 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 2214629 |
Water Division | Original | / | 9/23/2025 | SYSTEM | SYSTEM | You will need to contact Water Division department for approval prior to permit. This department will not review the plan electronically. | | Water Division | 2214628 |
Floodplain | Original | N | 9/23/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5301104005) | | Floodplain | 2214626 |