| Mechanical | Original | N | 2/26/2026 | TREVORH | TREVORH | not applicable; | | Mechanical | 2273815 |
| Electrical | Original | A | 2/26/2026 | CONNERM | CONNERM | | | Electrical | 2273760 |
| Zoning/Planning | Original | / | 2/26/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2273739 |
| Electronic Plan | Original | / | 2/26/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2273692 |
| Construction | Original | D | 2/26/2026 | BPHILLIPS | BPHILLIPS | Provide architectural and structural drawings for carport, including all required code data. Provide soils report. See commercial plan submittal handout for all requirements. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2273687 |
| Enumeration | Original | A | 2/26/2026 | AMY | AMY | | | Enumeration | 2272467 |
| Electronic Plan | Original | / | 2/26/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2272393 |
| Submittal 2 | Original | / | 2/26/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2272374 |
| Mechanical | Original | D | 10/9/2025 | TREVORH | TREVORH | Disapproved; Need to see construction review comments addressed. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2221755 |
| CO Springs Hazmat | Original | D | 10/8/2025 | CSFIRE | CSFIRE | DFM-C-SV-25-00013 Permit. A Construction Permit shall be obtained for Direct Current Fast Charging (DCFC) bank(s) Type of EV Charger? EV Charging plans? EV Charging Spec sheets? ESO? EV Signage? Solar photovoltaic (PV)systems shall be installed in accordance with the International Building Code or International Residential Code . The electrical portion of solar PV systems shall be installed in accordance with NFPA 70. Access and pathways. Is the 4 FT path for the entire perimeter? No Perimiter shown on the manufactures specifications. List the type of rapid shutdown. Signage plan – Show required signage. Primary ground level rapid shut down must be clear and distinct. Submitted By: Stanwood, Mark Antone,Submitted By: Stanwood, Mark Antone | mark.stanwood@colora | CO Springs Hazmat | 2221168 |
| CO Springs Fire | Original | D | 10/7/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2220593 |
| CO Springs DRE | Original | D | 10/3/2025 | SSADLER | SSADLER | On the site plan, show the distance the carport is from all property lines. Upload the architectural plans for the proposed carport. Make sure to include the height and the size. You may want to schedule a pre application meeting to make sure a modification to the development plan is not needed. | | CO Springs DRE | 2219415 |
| Electronic Plan | Original | / | 10/1/2025 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2218285 |
| Electrical | Original | D | 10/1/2025 | CONNERM | CONNERM | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2218284 |
| Zoning/Planning | Original | / | 9/30/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2217538 |
| Construction | Original | D | 9/30/2025 | BPHILLIPS | BPHILLIPS | This submittal appears to be for two projects. Provide architectural and structural drawings for carport, soils report. Be sure to include all code data required for new commercial structure.
PV: Provide climatic design criteria, max rail spacing, minimum lag screw embedment * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2217394 |
| Electronic Plan | Original | / | 9/29/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2216788 |
| Enumeration | Original | A | 9/24/2025 | AMY | AMY | | | Enumeration | 2215389 |
| Electronic Plan | Original | / | 9/24/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2215004 |
| Energy | Original | N | 9/23/2025 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2214846 |
| Floodplain | Original | N | 9/23/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6436101003) | | Floodplain | 2214845 |