| CO Springs DRE | Original | A | 4/22/2026 | SSADLER | SSADLER | Previous approval comments still apply | | CO Springs DRE | 2297706 |
| Gas/Elec. Utils | Original | A | 4/20/2026 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. DMM | dmakings | Gas/Elec. Utils | 2295542 |
| Energy | Original | D | 4/20/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2295276 |
| Mechanical | Original | A | 4/20/2026 | TREVORH | TREVORH | Approved; | | Mechanical | 2295275 |
| Zoning/Planning | Original | / | 4/20/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2295165 |
| Construction | Original | D | 4/20/2026 | SHELLEY | SHELLEY | Still missing IECC form for new thermal envelope components * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2295124 |
| Submittal 2 | Original | / | 4/17/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2294785 |
| CO Springs Fire | Original | A | 11/5/2025 | CSFIRE | CSFIRE | CSFD FCS: You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | CO Springs Fire | 2233399 |
| CO Springs Hazmat | Original | N | 11/5/2025 | CSFIRE | CSFIRE | NA | Jacob.Watson | CO Springs Hazmat | 2233398 |
| Energy | Original | D | 11/4/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2232621 |
| Mechanical | Original | D | 11/4/2025 | TREVORH | TREVORH | Disapproved; Need to provide Mechanical plans , need to see construction plan review comments addressed. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2232620 |
| CO Springs DRE | Original | A | 11/4/2025 | SSADLER | SSADLER | Approved for repairs due to a fire. | | CO Springs DRE | 2232519 |
| Zoning/Planning | Original | / | 10/31/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2231827 |
| Electrical | Original | A | 10/31/2025 | DANIELG | DANIELG | | | Electrical | 2231536 |
| Electronic Plan | Original | / | 10/31/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2231525 |
| CSU Water | Original | N | 10/30/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building. PSD | PDosch | CSU Water | 2231206 |
| CSU Waste Water | Original | N | 10/30/2025 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. PSD | PDosch | CSU Waste Water | 2231204 |
| Gas/Elec. Utils | Original | D | 10/30/2025 | CSUREVIEW | CSUREVIEW | Coordinate with Josh Hoepfner 668-3242 to verify the new meter location and electrical load at the proposed panel. PSD | PDosch | Gas/Elec. Utils | 2231202 |
| Plumbing | Original | N | 10/30/2025 | SHANEN | SHANEN | No plumbing scope indicated. | | Plumbing | 2230985 |
| Construction | Original | D | 10/30/2025 | SHELLEY | SHELLEY | See architectural plan * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2230972 |
| Electronic Plan | Original | / | 10/29/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2230233 |
| Enumeration | Original | N | 10/22/2025 | AMY | AMY | | | Enumeration | 2227556 |
| Electronic Plan | Original | / | 10/22/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2227538 |
| | Original | / | 10/21/2025 | SYSTEM | SYSTEM | Plan Review fees paid 10/21/2025 for plan submitted 10/21/2025. Submit Date updated to now. Plan now open for review. | | | 2226973 |
| Energy | Original | / | 10/21/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2226666 |
| Floodplain | Original | N | 10/21/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6331413017) | | Floodplain | 2226664 |