| Energy | Original | D | 1/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2259063 |
| Electrical | Original | D | 1/23/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2259062 |
| | Original | / | 1/23/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2259054 |
| | Original | / | 1/13/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2255943 |
| Submittal 3 | Original | / | 1/13/2026 | QUINTONW | QUINTONW | Submittal #3 | | Submittal 3 | 2255941 |
| Energy | Original | D | 12/23/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2251101 |
| Electrical | Original | D | 12/23/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2251100 |
| Enumeration | Original | N | 12/4/2025 | AMY | AMY | | | Enumeration | 2243699 |
| Electronic Plan | Original | / | 12/4/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2243685 |
| Submittal 2 | Original | / | 12/4/2025 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2243424 |
| Energy | Original | D | 12/1/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2241984 |
| Plumbing | Original | N | 12/1/2025 | SHANEN | SHANEN | | | Plumbing | 2241983 |
| Mechanical | Original | N | 11/24/2025 | DALEH | DALEH | | | Mechanical | 2240543 |
| Energy | Original | / | 11/24/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2240240 |
| Energy | Original | D | 11/24/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2240239 |
| Electrical | Original | D | 11/24/2025 | BERTHA | BERTHA | Remove parallel neutral - remove equipment ground from service conductor.
Comply with 314.23(H) – provide cord reel detail.
Provide available fault current for new panels.
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.” . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2240238 |
| Electronic Plan | Original | / | 11/24/2025 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2240236 |
| Gas/Elec. Utils | Original | A | 11/20/2025 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions.MDA | malcuran | Gas/Elec. Utils | 2239049 |
| Construction | Original | N | 11/19/2025 | SHELLEY | SHELLEY | No construction scope | | Construction | 2238788 |
| Enumeration | Original | D | 11/19/2025 | AMY | AMY | The Legal Description & Tax Schedule number is required to be filled in on the Code Study form. This information can be found on the El Paso County Assessor’s database when typing in the address of the lot. The Tax schedule number can be found above the address on this website. https://property.spatialest.com/co/elpaso/#/
A vicinity map and a site plan of the area is also required. See all of Enumerations requirements on our website. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2238577 |
| Electronic Plan | Original | / | 11/19/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2238537 |
| Electrical | Original | / | 11/19/2025 | QUINTONW | QUINTONW | Overtime approved for Electrical by Approved Per Marlon | | Electrical | 2238501 |
| Construction | Original | / | 11/19/2025 | QUINTONW | QUINTONW | Overtime approved for Construction by Approved Per Marlon | | Construction | 2238500 |
| | Original | / | 11/19/2025 | SYSTEM | SYSTEM | Plan Review fees paid 11/19/2025 for plan submitted 11/19/2025. Submit Date updated to now. Plan now open for review. | | | 2238492 |
| Energy | Original | / | 11/19/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2238488 |
| Floodplain | Original | N | 11/19/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6402307005) | | Floodplain | 2238487 |